
INDEPENDENT RESEARCH MEDIA HOUSE FOR THE ASX. DEPTH OVER HYPE.
WA1 Resources (ASX WA1), Research and Coverage
WA1 Resources Ltd (ASX: WA1) is a Perth niobium company. It owns 100 per cent of the Luni Niobium Project in the West Arunta region of Western Australia. The Luni Mineral Resource is 220 million tonnes at 1.0 per cent niobium oxide, in the Indicated and Inferred categories (resource update, lodged 14 May 2026). WA1 held A$113.2 million in cash at 30 September 2026 (quarterly report, lodged 28 October 2026). A pre-feasibility study and a first Ore Reserve of 20.3 million tonnes at 2.75 per cent were released on 18 November 2026. No decision to build has been made and finance is not secured. Samso had published six pieces with a section on WA1 at 19 November 2026. Five are about other companies or wider subjects.
ASX code: WA1. Full legal name: WA1 Resources Ltd. Managing Director: Paul Savich. Kathleen Bozanic is the non-executive chair. The other directors are Tom Lyons, an executive director, and Lee Bowers and Rhys Bradley, both non-executive (annual report, lodged 18 September 2026). WA1 held A$113.2 million in cash at 30 September 2026. The quarterly cash flow report lists no loan facilities (Appendix 5B, lodged 28 October 2026).
WA1 Resources projects
WA1 has one main project, Luni, and two areas of exploration ground. Luni has a Mineral Resource, which is a company's estimate of the material in the ground that has reasonable prospects of eventual economic extraction. It is stated as tonnes and grade and is reported under the JORC Code, the Australasian code for reporting mineral resources. Grade is the amount of metal in the rock. Luni's grade is quoted as niobium oxide, written Nb2O5. The code has three confidence categories. Measured is the highest, Indicated the middle and Inferred the lowest. An Ore Reserve is the part of a resource that a study has shown can be mined economically.
- Luni Niobium Project, about 590 kilometres west of Alice Springs and 60 kilometres west of the Northern Territory border, in Western Australia. WA1 owns 100 per cent with no joint venture or earn-in partner. The project ground is five granted exploration licences, four exploration licence applications, one mining lease application and six applications for infrastructure licences (pre-feasibility study, lodged 18 November 2026).
- West Arunta Project, the wider ground around Luni in Western Australia and the Northern Territory. WA1 holds 100 per cent. WA1 reviewed existing data in the September 2026 quarter and did no exploration on the ground (quarterly report, lodged 28 October 2026).
- Madura Project, about 430 kilometres east of Kalgoorlie. Three granted exploration licences, held 100 per cent. WA1 continued talks on land access in the quarter and did no exploration on the ground (quarterly report, lodged 28 October 2026).
The Luni Mineral Resource and Ore Reserve
WA1 discovered Luni in 2022 and has drilled about 93,000 metres there since (ASX announcement, 19 October 2026). Niobium is a metal used mainly to strengthen steel. It is sold to steelmakers as ferroniobium, an alloy of iron and niobium. Luni sits in a carbonatite, a rare type of igneous rock made mostly of carbonate minerals. The resource counts only the weathered upper part of that rock and does not include fresh rock at depth.
The resource is 220 million tonnes at 1.0 per cent Nb2O5, with an effective date of 13 May 2026. Of that, 93 million tonnes at 1.32 per cent is Indicated and 130 million tonnes at 0.7 per cent is Inferred. It counts rock above a cut-off of 0.25 per cent, the lowest grade included, inside an open pit shape drawn at a ferroniobium price of about US$30 a kilogram (quarterly report, lodged 28 October 2026).
The first Ore Reserve is 20.3 million tonnes at 2.75 per cent Nb2O5, all in the Probable category, which is the lower of the two reserve categories. It uses a 1.0 per cent cut-off, a ferroniobium price of US$30,000 a tonne and an exchange rate of 67 US cents. WA1 says it chose that cut-off because recovery from lower-grade material has not yet had enough testing. The reserve comes entirely from Indicated resources and holds about 25 per cent of the niobium in the resource, on WA1's figures. The resource figures include the reserve (pre-feasibility study, lodged 18 November 2026).
The 2026 resource drilling used diamond holes, which cut a solid core of rock. It was aimed at the eastern part of the Indicated resource, where mining would start. Results from 24 holes on 19 October 2026 included 35.2 metres at 4.8 per cent Nb2O5 from 35.4 metres and 17.7 metres at 2.7 per cent from 30.3 metres. Each is the higher-grade part of a longer interval, measured down a vertical hole. WA1 says the enriched layer is generally flat-lying, so a vertical hole measures close to its real thickness. WA1 plans a resource update in the March 2027 quarter that aims for a first Measured component (ASX announcement, 19 October 2026).
The Luni pre-feasibility study (PFS)
WA1 released a pre-feasibility study for Luni on 18 November 2026. A pre-feasibility study is the middle level of mining study, ahead of a feasibility study. The plan is an open pit, a mine dug from surface, with a plant at site that makes a niobium concentrate. The concentrate would go by road and rail to Whyalla in South Australia to be made into ferroniobium (pre-feasibility study, lodged 18 November 2026).
The study gives a first mine life of 17.3 years producing 20,000 tonnes of ferroniobium a year at full rate. The production target rests entirely on the Probable Ore Reserve and uses no Inferred material. Capital cost before production is A$1,069 million including contingency, with A$770 million at Luni and A$299 million at Whyalla. The all-in sustaining cost, which is operating cost plus royalties, ongoing capital and closure, averages A$22,302 a tonne of ferroniobium. The study's cost estimates carry an accuracy range of minus 20 per cent to plus 30 per cent. The base price assumed is US$30,225 a tonne of ferroniobium, held flat. The study says the project is most sensitive to that price (pre-feasibility study, lodged 18 November 2026).
Recovery is the share of the niobium in the ore that ends up in the product. The study assumes 57.3 per cent at the site plant and 97.5 per cent at Whyalla, or 55.9 per cent overall. The Whyalla figure is what WA1 expects at commercial scale. The study says smaller tests of that step lose more heat and give lower recoveries. The site figure rests on flotation tests, which grind the rock and use air bubbles to lift the niobium minerals into a concentrate (pre-feasibility study, lodged 18 November 2026).
WA1 tested four blended samples from 44 drill holes. The sample from the eastern area returned 67 per cent recovery, and the weighted average of the four was 54 per cent. No bulk sample has been tested and no large-scale trial of the process has been run. More test work is planned (pre-feasibility study, lodged 18 November 2026).
A feasibility study comes next. WA1 states that no final investment decision has been made and that project finance has not been secured. No site at Whyalla has been secured. WA1 says its environmental work so far has found no issue it expects to stop the project. The project is yet to be referred to the Western Australian Environmental Protection Authority, and the mining lease is an application. Project agreements with the Ngururrpa and Kiwirrkurra people, the Traditional Owners, are being negotiated under agreed protocols (pre-feasibility study, lodged 18 November 2026).
WA1 plans to sell ferroniobium directly to steelmakers and has signed no binding sales agreement. The study says Luni's planned output is about equal to the forecast growth of the whole ferroniobium market between 2025 and 2032. WA1 says growth alone cannot be assumed to absorb that output over a short period (pre-feasibility study, lodged 18 November 2026).
WA1 Resources cash and funding
WA1 spent A$10.7 million on exploration and evaluation in the September 2026 quarter. The quarterly cash flow report divides the cash by the quarter's relevant outgoings of A$12.4 million and gives 9.13 quarters of funding (Appendix 5B, lodged 28 October 2026). That figure measures the present rate of spending. It does not include the cost of building a mine.
WA1's last capital raising was A$100 million before costs in August 2025 (annual report, lodged 18 September 2026). The company says it is assessing commercial debt, export credit and government-supported funding, strategic investment and funding linked to sales agreements, and that no pathway has been chosen (pre-feasibility study, lodged 18 November 2026).
Every Samso piece on WA1 Resources
6 published pieces as at 19 November 2026, grouped by Samso product. Newest first in each group. Dates are Perth dates. Five of the six are about other companies or wider subjects, and each has a section on WA1, as the notes say. The sixth is about the niobium price and four ASX niobium companies, WA1 first among them.
Samso Research
- 9 Sep 2026, Australian Rare Earths Limited (ASX: AR3) (a workup on Australian Rare Earths that compares its Overland niobium results with WA1's Luni)
Samso Insights
- 21 Sep 2025, Carbonatites - Economic Importance and A Strategically Important Source Rock. (an Insight on carbonatite rocks that covers the Luni discovery and what it changed)
- 7 Nov 2022, Who Dares Wins. Should Australian Investors be Running for Cover? (an Insight on the small-cap resources market that has a section on WA1's 2022 discovery)
Samso News
- 27 Oct 2026, Is Niobium Still in Flavour? (the niobium price and the charts of WA1 and three other ASX niobium companies)
- 3 Jul 2026, The overselling of Encounter Resources— a niobium number two priced like an afterthought (a piece on Encounter Resources that compares it with WA1 and Luni)
- 11 Jul 2025, Tali Resources Ltd (ASX: TR2) – IPO Summary and Exploration Outlook - Copper, REE, Niobium, Gold (a piece on the Tali Resources float that covers its management link to WA1)
The most recent piece on this list, dated 27 October 2026, was written while the pre-feasibility study was still to come. WA1 released the study and its first Ore Reserve on 18 November 2026.
Questions people ask about WA1 Resources (ASX WA1)
What does WA1 Resources do? It owns 100 per cent of the Luni Niobium Project in the West Arunta region of Western Australia and is studying a mine there.
What is the WA1 Resources share price? The ASX website shows the WA1 share price. This page lists Samso's coverage and has no live price.
What is the latest announcement from WA1 Resources? As at 19 November 2026 the most recent announcements were lodged on 18 November 2026. They were the Luni pre-feasibility study, the annual general meeting presentation and the results of the meeting. The ASX lists the newest ones.
Does WA1 Resources have a Mineral Resource or an Ore Reserve? Yes, both. The Luni Mineral Resource is 220 million tonnes at 1.0 per cent Nb2O5, dated 13 May 2026. The Probable Ore Reserve is 20.3 million tonnes at 2.75 per cent Nb2O5, dated 18 November 2026. The resource includes the reserve.
Is WA1 Resources worth looking at? This page gives no buy, sell or hold call, price target or valuation. WA1 has a pre-feasibility study and a first Ore Reserve at Luni, and the study's production target uses reserves only. The capital cost before production is A$1,069 million, and WA1 states that funding has not been secured and no decision to build has been made. It held A$113.2 million in cash at 30 September 2026 with no loan facilities listed. The mining lease is an application. Samso had published no research workup on WA1 at 19 November 2026. The Samso News piece of 27 October 2026 covers the niobium price and the WA1 share chart before the study.
Disclosure
Samso holds no shares in WA1 Resources at 17 November 2026.
This page is general information only.
Depth over hype.
Samso company research pages are independent research commentary for general information only. Nothing on this page is financial product advice, and it does not take into account any reader's objectives, financial situation or needs. Figures are drawn from public sources believed reliable at the stated dates but are not guaranteed, and market-sensitive numbers change daily. Samso or associated parties may hold positions in, or have commercial arrangements with, companies mentioned. Seek professional advice before making investment decisions. © Samso 2026, samso.com.au
Page last reviewed 19 November 2026.