Bengwenyama's Second Product, and the Discount Nobody Has Explained
Updated: Oct 22
Part 1 measured the rock at Bengwenyama and found it good. Part 2 looks at the company that owns it, and at three things the market has not put a number on. A second product the published economics do not contain. A discount two research houses apply and neither of them explains. And a commodity whose best deposits are so concentrated in one country that investors outside it have almost nothing to compare this with.

Samso Insights | Platinum Group Elements | ASX Small Caps | Investor Awareness |
WHAT THIS PIECE COVERS The three tests Part 1 ran, the five this piece runs, and why there is so little to compare this with, on ground, grade and power. 2.00 WHO ACTUALLY OWNS BENGWENYAMA The corporate chain, the community's 30 per cent, the loan behind it and the decade of litigation that kept this ground free. 3.00 TEST FOUR, A CONVENTIONAL FLOWSHEET What the July 2026 metallurgical work changed, and the second product that is in none of the published numbers. 4.00 TEST FIVE, A CONCENTRATE SOMEONE WILL BUY Chrome as a penalty and as a product, and why an unsigned offtake is a step not yet reached. 5.00 TEST SIX, A RESERVE RATHER THAN A RESOURCE A declared reserve of 6.29 million ounces, the three qualifications on it, and why it is more likely a floor. A mining right granted after nearly three years, and the licences and steps still outstanding. 7.00 TEST EIGHT, BEING ABLE TO RAISE THE MONEY About 1.7 times the market capitalisation, measured against a mine the company no longer intends to build. 8.00 WHAT THE RESEARCH SAYS, AND WHO PAID FOR IT Who covers this company, who pays them, and the discount neither of them itemises. Six tests answered, two open, and the three things that have no line on the scorecard at all. Noel's own commentary. |
A note on the vocabulary and the sources. Technical and mining terms are explained in plain English where they first appear, and all of them are collected in one box at the back. Every source carries an identifier, [R1] to [R40], and that identifier appears in the body text at the point the source is used, so any figure can be traced to where it came from. Where this article builds a model from released data rather than repeating a company statement, it says so at that point and labels it as Samso’s own reasoning. A model is not a prediction.
1.00 — WHERE PART 1 LEFT OFF
The eight tests, and how far Part 1 got
Part 1 set out eight tests a platinum group element project has to pass before it becomes a mine. It ran the first three, which are grade, the orebody, and what the plant costs to build.
PLATE 01 is what the ground looks like now. A camp, a core yard, a road and a fence. Everything in this piece that has not happened yet would be built on that flat ground in the middle of the picture.

PLATE 01 The exploration camp and core yard at Bengwenyama, with community housing and the Eastern Limb hills behind.
Photograph from the Southern Palladium investor presentation of 2 September 2026 [R36]. Samso has not visited the site and cannot date the photograph.
Bengwenyama passed on grade. The company reports 9.78 grams per tonne on a 7E basis, and a 1982 study sampling the UG-2 across the whole Bushveld put the central eastern sector at 10.05 parts per million against a Bushveld-wide average of 6.93. On the orebody, the reef is narrow at about 73 centimetres, a dome has removed the reef from part of the property, and potholes take about 17 per cent of the reef area. On what it costs to build, Stage 1 works out at roughly US$1,100 of capital for every ounce of annual production capacity, against roughly US$3,900 for Chalice Mining's Gonneville on the same calculation.
Those three tests measure the rock, so the answers to them do not change from one year to the next.
The five remaining tests are about the company. Whether the processing flowsheet is conventional. Whether anyone will buy the concentrate. Whether the resource has been converted into a reserve that stands up. Whether the permits are in hand. And whether a company of this size can raise US$279 million.
Most of those now have an answer. What this piece is really about is the part that does not, because that is where the value in Bengwenyama has yet to be priced. A second product the published economics do not contain. A discount two research houses apply to the project and neither of them explains. And a commodity so concentrated in one country that an investor outside it has almost nothing to measure this against.
Part 1 did not ask who owns the project. Southern Palladium holds 70 per cent of it, and what that 70 per cent entitles the company to do changes how three of the five remaining tests read. Section 2.00 sets out the ownership before the tests are run.
Why there is so little to compare Bengwenyama with
Platinum group metals are not a commodity most investors outside South Africa have had to learn, and there is a reason for that. The United States Geological Survey states it in one line, that "the largest resources and reserves are in the Bushveld Complex in South Africa" [R32].
The same table puts South Africa's platinum group metal reserves at 63,000,000 kilograms against a world total of more than 76,000,000 [R32]. So roughly four fifths of the world's reserves are in one country, and most of that is in one geological complex. Bengwenyama is in it.
Russia is the other name on that table, and it is there for production rather than reserves. The USGS calls Russia "the world's leading producer of mined palladium" [R32]. In 2024 Russia mined 89,000 kilograms of palladium against South Africa's 82,600. On platinum the position reverses hard, with South Africa at 126,000 kilograms against Russia's 22,000. The world's palladium supply leans on Russia and the world's resource base is South African, and neither country appears on anybody's list of easy places to build a mine.
That is why the comparison set is thin. The nearest ASX-listed comparison in this piece is Chalice Mining's Gonneville, which needs about US$3,900 of capital for every annual ounce against Bengwenyama's US$1,100. An Australian investor reaches for Gonneville because there is not much else on the board to reach for.
FIG. 01 makes the same point from the other direction. On the ASX there is almost nothing to measure Bengwenyama against. On the ground it is surrounded by mines that have been running for years, which is why the project keeps being described as being in an established district rather than a frontier one.

FIG. 01 Bengwenyama on the Eastern Limb of the Bushveld Complex, with the operating mines the company names as neighbours.
Reproduced from the Southern Palladium investor presentation of 2 September 2026, slide 9 [R36]. The map is the company's own. Samso has not checked the positions marked on it against a survey source.
Power belongs in that comparison, and it is one of the places where South Africa is plainly ahead. Business electricity in South Africa averaged about US$0.105 a kilowatt hour across 2023 to 2026, against about US$0.242 in Australia and a world average of about US$0.164 [R35]. On those figures a South African operation pays roughly 40 per cent of what an Australian one pays for the same unit. For a mine, where power is one of the largest running costs over a thirty year life, that is not a rounding difference.
Two things have to be read against it. The direction of travel is up. Eskom's approved standard tariff increase for 2026 and 2027 is 8.76 per cent from 1 April 2026 [R34], industrial prices have roughly doubled over the past decade, and large users have been moving to self generation to get away from the increases [R33]. And the comparison above comes from a commercial price aggregator rather than a regulator, and its business category is not the specific tariff a mine on a 55 MVA connection would negotiate. Bengwenyama holds a budget quotation for that connection and nothing signed, so its own delivered cost is not established. F-21 records that gap.
On reliability the change is more recent and more striking. South Africa went more than a year without load shedding to August 2026, and Eskom's energy availability factor reached about 82 per cent on 24 July 2026 [R33]. Load shedding was the loudest single argument against building anything in South Africa for most of the past decade. It has not been a live constraint for a year, and that is a genuine change in the case for building here rather than a forecast that it will continue.
Power is one part of a wider change in South Africa. Most of it is recent.
Eskom forecast a surplus of about 6 gigawatts of peak capacity over the 2026 winter, and said no load shedding was expected even if unplanned outages reached 14 gigawatts [R37]. The winter then ran through without load shedding.
Transnet concluded network access agreements with eleven private train operating companies in May 2026, together bringing about 24 million tonnes of freight capacity [R38]. It is the first time private operators have run trains on the national freight network. That matters more to Bengwenyama than it would to most mines. The chrome stream in section 3.00 is a bulk product measured in hundreds of thousands of tonnes a year, and bulk products move by rail or they do not move economically.
S&P Global Ratings upgraded South Africa in November 2025, its first upgrade of the country in about twenty one years. The foreign currency rating went to BB and the local currency rating to BB+, both with a positive outlook, and S&P affirmed both in May 2026 [R39]. BB+ is one notch below investment grade and BB is two. Fitch upgraded South Africa in June 2026.
South Africa was removed from the Financial Action Task Force grey list on 24 October 2025 [R40]. The grey list is the task force's register of countries under increased monitoring for money laundering and terrorist financing controls. Sitting on it raises the cost and the paperwork of moving money into and out of a country, which matters to a project that has to import plant and export concentrate.
Samso reads those four together rather than one at a time. Business and government have been working the same problems, some markets have been opened to private operators, and mining reform is on the agenda. That is a reading of direction and it is Samso's, not a measured fact.
None of it makes South Africa a Tier 1 jurisdiction and this piece does not argue that it does. The Mining Charter, section 11 of the Act and the permitting queue are all still what they were, and each is dealt with later. What has changed is the state of the two things investors named most often as reasons not to build here. The power system carried a winter without cutting anyone off, and the country is no longer under increased international monitoring for financial crime controls.
The jurisdiction is also why grade and volume carry more weight here than those words usually suggest. A deposit is economic when it can carry the cost of being built and then survive the price cycle once it is running. Grade and volume are what allow that, because a high grade at scale keeps the cost of each ounce low enough to trade through the bad years rather than stopping. Bengwenyama's numbers for that test are already public. Nine point seven eight grams per tonne on a 7E basis, a 6.29 million ounce Probable reserve inside a 40.25 million ounce resource, and about US$1,100 of capital for every annual ounce of capacity.
SAMSO TAKE The reconciliation this piece asks a reader to make. The same single fact produces both halves of the argument. The best platinum group element ground is in South Africa, which is why Bengwenyama has the grade and the volume, and it is also why it carries the jurisdiction risk. You do not get the first without accepting the second. An investor who rules out South Africa has not moved to safer ground, they have moved to a smaller opportunity set whose other end is Russia. This is Samso's view rather than a finding, and Section 10.00 carries the fuller argument in Noel's own words. It is a reason to weigh the discount rather than accept it. It is not a reason to buy anything. |
2.00 — WHO ACTUALLY OWNS BENGWENYAMA
The ownership chain, from the ASX listing down to the farms
Southern Palladium Limited is an Australian company listed on the ASX under SPD and on the Johannesburg Stock Exchange under SDL. The chain from the listed parent down to the two farms runs through four companies. The announcement most investors read compresses it to a single line.
The chain runs like this. Southern Palladium Limited owns 100 per cent of SPD (RSA Holding) Pty Limited in Australia, which owns 100 per cent of SPD South Africa Proprietary Limited, which owns 70 per cent of Miracle Upon Miracle Investments (Pty) Ltd, a South African company known in every company document as MUM. MUM holds the project 100 per cent [R1] [R2].
The two Australian and South African intermediate companies were incorporated on 12 May 2022, and SPD South Africa acquired the 70 per cent of MUM on 26 May 2022 [R1]. The mining right announcement of 10 August 2026 does not name either of them. It says only that "the Project is 100% held by Miracle Upon Miracle Investments (Pty) Ltd (MUM), in which Southern Palladium holds a 70% ownership interest" [R3].
FIG. 02 is the company's own diagram of the structure, published for the listing in June 2022. The chain below Southern Palladium Limited is the same one the company operates today. What has changed is the top of the chart, where the shareholdings have moved with four years of capital raisings.

FIG. 02 Southern Palladium’s own corporate structure diagram, drawn for the listing.
Reproduced from the pre-quotation disclosure of 3 June 2022, section 4(b), released to the ASX and JSE on 6 June 2022. This is the structure on completion of the acquisition of MUM and of the initial public offering. The chain below Southern Palladium Limited is unchanged today. The shareholdings above it are not. Nurinox held 12.3 per cent of the listed company at listing and 5.7 per cent at 10 August 2026. “Propriertary” is the company’s own spelling.
TABLE 01 sets the same chain out with the jurisdictions and the registration numbers, and brings the holdings to August 2026.

What the 70 per cent entitles Southern Palladium to do
Southern Palladium sets out the terms of the joint venture in Note 6 of its 2025 Annual Report, in these words [R2]. Most coverage of the company leaves this out.
"Whilst the company owns 70% of the voting rights, the terms of the arrangement require unanimous consent over decisions relating to relevant activities of MUM. The Company has determined that the relevant activities for its joint arrangement relate to the operating and capital decisions of the arrangement, such as the approval of the expenditure programme for each year."
Because of that, Southern Palladium does not consolidate MUM into its accounts. It equity-accounts MUM as a joint venture.
In plain terms, operating and capital decisions at MUM need both partners to agree, so the 30 per cent holder can block the annual budget. Southern Palladium takes 70 per cent of the economics without the ability to decide anything alone. Its own accounts describe the arrangement as a 70 per cent owned joint venture, and that is the accurate description.
The lack of control shows up in every quarterly report. The cash figure Southern Palladium publishes carries the rider that it "excludes cash held by the Company's 70% subsidiary, Miracle Upon Miracle Investments (Pty) Limited" [R4]. At 30 June 2026 that was A$23.879 million at the Southern Palladium level and A$0.98 million at MUM, reported separately rather than added together.
Who holds the other 30 per cent
The 30 per cent belongs to the Bengwenyama-ya-Maswazi community, the people living on and around the two farms. At the time of the 2022 listing it was held by Nurinox Investments Proprietary Limited, a company wholly owned by that community [R5]. The mining right announcement of August 2026 describes the holder as "the Bengwenyama Traditional Council on behalf of the Bengwenyama Community" [R3]. Whether the register at MUM changed between 2022 and 2026, or whether the later wording is simply looser, is not established in any document Samso could obtain.
The community also holds shares in the listed parent. Nurinox held 7.55 per cent of Southern Palladium at 14 October 2025 [R2] and 5.7 per cent at 10 August 2026 [R3], the fall being dilution from share issues rather than any sale.
The community therefore holds an interest in the project twice over, once through MUM and once through the listed parent. The 2025 Annual Report states the total in these words [R2].
"The Community holds an effective economic interest in the Company of 35.3% via a 30% direct holding and a further indirect holding of 5.3% through its 7.55% shareholding in SPD."
On the August 2026 shareholding of 5.7 per cent, the same arithmetic gives about 34 per cent. That calculation is Samso's, using the company's own method and its own updated figure. No company document states the updated total.
PLATE 02 is company material, and it is here as company material rather than as evidence. Social investment and a shareholding are separate things, and only one of them appears in the accounts.

PLATE 02 Young players at a Southern Palladium sponsored community sports event near Bengwenyama.
Photograph from the Southern Palladium investor presentation of 2 September 2026 [R36]. Samso cannot date the photograph or identify the event, and reproduces it as company material rather than as verification of any community programme.
How the community's 30 per cent is funded
Broker commentary and investor conversation both tend to describe a community holding of this kind as a free carry, meaning the partner takes its share of the profits without paying its share of the costs. No document Samso obtained uses that phrase about Nurinox or the Traditional Council. The documented arrangement is a loan.
Southern Palladium funds MUM through a loan. The 2025 Annual Report describes a loan facility and services agreement, originally dated about 20 May 2021 and amended in March 2022, under which Southern Palladium grants MUM a prospecting facility of A$19 million for prospecting operations [R2]. At 30 June 2025 the balance was A$12,868,401 of principal plus A$1,792,937 of accrued interest, a total of A$14,661,338, and the whole amount was written down to nil because the company judged that it is uncertain whether MUM can repay it at this stage of the project.
The loan carries interest at the United States bank prime rate, 7.50 per cent at 30 June 2025, not compounded. It is repayable in full no later than five years after MUM begins commercial mining operations, and Southern Palladium cannot demand it back before then.
So the 30 per cent partner has contributed no cash and has not been diluted, which is the economic effect of a carry. The money Southern Palladium has put in is still a debt of MUM. It ranks ahead of any distribution to either shareholder and it accrues interest until it is repaid. This is a loan carry. In the first years of production MUM's cash goes to repaying the loan, which a free carry would not require.
SAMSO TAKE Ownership arithmetic an investor can do at home. A project NPV is always a 100 per cent number. Southern Palladium's share of the US$857 million net present value in the Optimised Pre-Feasibility Study is 70 per cent of it, before the shareholder loan is repaid and before any equity the company still has to issue to build the mine. Section 7.00 puts numbers on the second of those. Samso raises this as a question and not as a conclusion. Does the market price the project, or Southern Palladium's 70 per cent share of it? |
Why this ground was still available in 2022
Bengwenyama is one of the last shallow undeveloped sections of the UG2 reef on the Eastern Limb, in a district that has been mined for close to a century. The reason it stayed undeveloped is legal rather than geological. The ground spent roughly a decade in litigation, which the community won.
In Bengwenyama Minerals (Pty) Ltd and Others v Genorah Resources (Pty) Ltd and Others, decided by the Constitutional Court of South Africa on 30 November 2010, the Court set aside the Department's decision to grant prospecting rights over Nooitverwacht 324 KT and Eerstegeluk 327 KT to Genorah Resources [R6]. The applicants were Bengwenyama Minerals, the Bengwenyama-Ye-Maswazi Tribal Council and the trustees of the Bengwenyama-Ye-Maswati Trust. The Court held that the Department should have told the community about Genorah's application and about its effect on the community's own preferent right to prospect on its own land, and should have allowed the community to bring its own application before deciding Genorah's. On consultation, the Court held that an applicant must inform the landowner in sufficient detail about the proposed operations and consult with a view to reaching an agreement.
Costs were awarded against the respondents across all courts.
A prospecting right was awarded to MUM in June 2015, registered for five years in 2017 and renewed for a further three years in February 2021 [R7]. Southern Palladium then negotiated to acquire 70 per cent of MUM, which is what the June 2022 initial public offering funded.
The full ownership history, including the 1940s displacement of the community from the two farms and the successful land claim in 1996, comes from Bridge Street Capital Partners' August 2026 report and Samso has not independently verified it [R7]. Bridge Street are corporate advisers to Southern Palladium. Their disclosures are set out in section 8.00.
How Southern Palladium bought its 70 per cent
Southern Palladium bought its 70 per cent up front with shares, under an instrument called the Second Amended and Restated Share Exchange Agreement, and put half the consideration at risk against two project milestones. The more common structure, earning an interest by spending money over time, was not used here.
The company issued 45,500,000 fully paid ordinary shares to the vendors, valued at the initial public offering price of A$0.50, so A$22,750,000 in total, with no cash paid [R2]. Half of those shares, 22,750,000 of them, were "Clawback Shares" that Southern Palladium could buy back for a nominal A$50 and cancel if two project milestones were not achieved within four years of the offer [R1].
The two milestones, in the company's own words [R1], were "at least 2 million oz PGE (4E) in JORC classified reserves" and "the acceptance by the Regional Manager (as contemplated in the MPRDA) of the formal application by the Company for a Mining Right over the Project".
Both were met. The mining right application was lodged on 29 September 2023 and accepted on 17 October 2023 [R4]. The maiden ore reserve of 6.29 million ounces on a 6E basis was declared on 23 October 2024 [R8], which is well above 2 million ounces on any counting basis. The 2025 accounts record the outcome plainly, that "in the current financial year, the clawback condition dropped away as the performance conditions were satisfied" [R2].
The vendors kept all 45.5 million shares. Those shares are the origin of two of the three substantial holdings on the register today.
Black economic empowerment, and what the law requires
In South Africa the state holds mineral resources as custodian, and a company obtains the right to mine by applying for a grant under the Mineral and Petroleum Resources Development Act of 2002. Section 23(1) of that Act sets the criteria for granting a mining right, and section 23(1)(h) requires the Minister to be satisfied that the grant will expand opportunities for historically disadvantaged persons, in accordance with the charter contemplated in section 100 and the prescribed social and labour plan [R9].
The Mining Charter of 2018 sets a minimum 30 per cent black economic empowerment shareholding for a new mining right, split as 5 per cent to qualifying employees as a non-transferable carried interest, 5 per cent to host communities on the same basis, and 20 per cent to black economic empowerment entrepreneurs [R10].
Most commentary stops at that 30 per cent figure. A High Court decision in 2021 changed its legal status.
On 21 September 2021, a full bench of the Gauteng Division of the High Court in Pretoria decided Minerals Council of South Africa v Minister of Mineral Resources and Energy and Thirteen Others [R11]. The Court held that "the 2018 Charter is not binding subordinate legislation but an instrument of policy". The Court reasoned that section 100(2)(a) of the Act does not empower the Minister to make law. It then reviewed and set aside a long list of clauses, most of them directed at existing rights, renewals and transfers, including the re-empowerment obligations and the procurement and enterprise development targets. The Minister did not appeal, and said so on 23 November 2021 [R12].
The 30 per cent requirement for a new mining right application was not struck out. It is now a policy standard rather than a legal duty, which means the Minister may apply it when exercising discretion under section 23(1)(h) and is not obliged to. This is important for an investor to understand. A policy standard can be applied differently to different applicants, and it can change without legislation.
Southern Palladium's structure holds 30 per cent of the mining right holder for the community, and the community holds a further 5.7 per cent of the listed parent. The company has prepared a social and labour plan, which the 2025 Annual Report says was developed in compliance with the Act, the 2004 regulations and the 2018 Mining Charter, and has been reviewed by the Department [R2].
No public document explains how a single 30 per cent community block was assessed against the Charter's split of 5 per cent employees, 5 per cent community and 20 per cent entrepreneurs. None says whether an employee scheme exists either. Samso could not find anything addressing either question. F-3 records that gap.
On empowerment compliance, the grant itself is the best evidence available. The Department granted the right on 7 August 2026, which means it was satisfied on section 23(1)(h). That is an inference from the decision rather than a published finding, and it still carries more weight than an analyst's view, because the Department had to be satisfied before it signed.
Bridge Street's August 2026 report states that "we therefore are of the view that the Bengwenyama project has achieved full BEE status with no further adjustment to ownership required" [R7]. Southern Palladium has never said that in an announcement, and no departmental document Samso saw says it. Bridge Street are corporate advisers to the company, were lead manager to its listing and to subsequent raisings, and the author holds shares in it.
Section 11, and what it does in a takeover
Section 11(1) of the Mineral and Petroleum Resources Development Act says that a mining right, or an interest in one, or a controlling interest in a company or close corporation, may not be transferred or otherwise disposed of without the written consent of the Minister, "except in the case of change of controlling interest in listed companies" [R13].
That works out differently at different levels of this structure. MUM is unlisted, so any change in the 70 per cent or the 30 per cent would need ministerial consent, and so would any transfer of the mining right itself. Southern Palladium Limited is listed on two exchanges, so a change of control at the listed parent falls within the express exception. On the face of the section, a takeover of Southern Palladium would not need the Minister's consent. A sale of Southern Palladium's stake in MUM would need it.
That reading is Samso's, from the wording of the section. No Southern Palladium announcement Samso read mentions section 11 at all.
A draft Mineral Resources Development Bill published on 20 May 2025 would have widened section 11 to cover any interest in an unlisted company, and would have made a transfer without consent void [R14]. A correction issued on 9 June 2025 removed the listed-company limb. Samso could not establish the Bill's status as at August 2026, so nothing here should be read as current law.
3.00 — TEST FOUR, A CONVENTIONAL FLOWSHEET
The definitive feasibility study metallurgy of July 2026
New processing technology adds risk to both the schedule and the budget. Part 1 used Chalice Mining as the illustration, four years and about A$15 million of metallurgical test work to settle a flowsheet on a project not yet built.
Southern Palladium released the results of its definitive feasibility study metallurgical test work on 9 July 2026 [R15]. The numbers moved a long way, and the chromite recovery moved furthest.
TABLE 02 sets the results against what the Pre-Feasibility Study had assumed.

Chromite recovery went from 30 per cent to 85.6 per cent, which changes what sort of mine Bengwenyama would be. At full Stage 2 production the company now expects "over 400 koz of PGMs and 1 million tons of high-grade chrome concentrate per annum" [R3].
TABLE 02 above is Samso's own compilation from the announcement. FIG. 03 is the company's version of the same comparison, published seven weeks later, and the two agree on every line.

FIG. 03 The company's own comparison of definitive feasibility study metallurgy against the Pre-Feasibility Study.
Reproduced from the Southern Palladium investor presentation of 2 September 2026, slide 14 [R36]. The underlying test work is the announcement of 9 July 2026 [R15].
The June 2026 quarterly puts the change in these words [R4].
"Historically, chrome revenues were treated primarily as a by-product credit against PGM production costs. The latest DFS results suggest chrome should instead be regarded as an important standalone revenue stream."
The published economics still use the old recovery figure and an old chrome price. The Optimised Pre-Feasibility Study of July 2025 assumes chrome concentrate at US$225 a tonne, real and flat for every year of the mine life, and it assumes 30 per cent chromite recovery [R16]. The company's own July 2026 announcement records South African 42 per cent chrome concentrate trading at US$320 a tonne on a cost and freight basis in May 2026 [R15]. So the only published study for Bengwenyama understates chrome on price as well as on recovery.
How much that is worth cannot be known until the definitive feasibility study restates the economics. On chrome, the July 2025 numbers are too low on both price and recovery.
The flowsheet itself
It is an MF2 circuit, which means the ore is milled and floated, then the tails are milled again and floated again. That configuration has been used on UG2 ore in South Africa for decades. Three additions have been made to it. Dense media separation at the front rejects 24 to 31 per cent of the run-of-mine mass at a 3.2 grams per cubic centimetre cut point, lifting the feed grade from 5.2 to 7.2 grams per tonne 3E while losing 1.2 to 2.2 per cent of the platinum group metal. Spirals on the classifier overflow take out chromite between stages. A second chromite flotation stage treats the secondary rougher tails [R15].
Dense media separation separates rock by density in a fluid heavier than water, so the lighter waste floats off and the denser ore-bearing material sinks. It is standard equipment in coal, diamonds and chrome.
FIG. 04 is the circuit as the company draws it. The two boxes on the right are the whole argument of this section, because one circuit produces two things somebody could buy.

FIG. 04 The MF2 flowsheet, from dense media separation through staged flotation to two saleable concentrates.
Reproduced from the Southern Palladium investor presentation of 2 September 2026, slide 12 [R36].
The company states its own position on technology risk in these words [R15].
"No novel technology is being applied, but rather existing technologies are being optimised for the Bengwenyama ore body. Several companies in South Africa have had to retrofit existing plant with processes that enable better chrome recoveries upfront and more efficient downstream MF2 processes."
The flowsheet is conventional, which answers the test Part 1 set.
The mining method sits in the same place. Bengwenyama is a narrow tabular reef, which means the ore is a thin sheet running for kilometres rather than a thick body a mine can attack from several directions. Following a sheet like that is what South Africa calls conventional mining. Crews drill and blast along the reef and take out as little waste rock as they can.
That is routine work in this country. The UG2 is the reef most Bushveld mines are working, and Samso's estimate is that something like two thirds of South Africa's platinum group metal production now comes off conventionally mined UG2. Samso could not verify that share against a primary source, so it is an estimate rather than a measured figure, and F-22 records the gap. What does not depend on the estimate is that the crews, the equipment and the contractors for narrow reef mining are already in the country and already trained. That is not true of every jurisdiction a new platinum group metal project could sit in.
Three questions the announcement leaves open
The flowsheet is not final. The June 2026 quarterly, released three weeks after the metallurgical announcement, says part of the reason for the definitive feasibility study taking longer is "the assessment of the potential incorporation of Jameson Cells technology into the processing flowsheet" [R4]. Jameson Cells are a proprietary flotation device, commercially proven and widely used, so the technology itself carries little risk. The circuit to be built has not been settled.
The recoveries are laboratory results. The announcement is explicit that open circuit test work was used as the input, and that the closed circuit performance was estimated by constructing a grade recovery response curve from that open circuit data [R15]. There is no pilot plant result and no continuous circuit result. Estimated full-plant recoveries built from bench tests on one bulk sample are a normal stage of a feasibility study. They are still an estimate rather than a demonstrated result.
The concentrate does not yet meet the chrome specification. The primary PGM concentrate assayed 3.2 per cent Cr2O3 and the secondary 3.9 per cent, against a target the company itself states as under 2.5 per cent [R15]. The company's answer is that "these grades can be lowered in the commercial application, by improving selectivity in the cleaning circuits". That is an intention rather than a result. Section 4.00 explains why the chrome content of the PGM concentrate matters commercially.
The completion date has moved three times since January 2026. In January 2026 the definitive feasibility study was expected in the third quarter of 2026 [R31]. On 9 July it was the fourth quarter of calendar 2026 [R15]. On 30 July it was the beginning of 2027 [R4]. On 10 August it was the first quarter of 2027 [R3]. The reasons given for the most recent moves are the work to capture chrome value in the plant design, and 29 days of drilling lost to heavy rain in Limpopo in the first half of 2026.
One more thing about the chrome, and it is the largest number in this piece that no released set of economics carries. None of the chrome improvement is in any released set of economics. The US$857 million net present value, the US$279 million peak funding requirement and the 6.29 million ounce ore reserve were all struck on 30 per cent chromite recovery and a US$225 chrome price. The company has told the market that chrome is now a standalone revenue stream, and that it delayed the definitive feasibility study by a quarter to put chrome into the plant design [R3] [R4]. It has not yet put it into the numbers. Whether that is worth a little or a lot cannot be said until the study lands, and saying otherwise would be restating economics without a study behind them, which is exactly what the ASX stopped the company doing in January 2026.
FIG. 05 is as close as the company has come to sizing it. About 500,000 tonnes a year of chrome concentrate in Stage 1 and about 1 million tonnes a year in Stage 2, at 42.2 per cent Cr2O3, beside a figure of US$320 a tonne. Hold that US$320 against the US$225 the published economics assume. Multiply the tonnages out and the numbers are large. They are also not revenue in anyone's model yet, and the US$320 is labelled on the slide as an indicative market reference, which means a market price the company is pointing at rather than a price it has been offered.

FIG. 05 The company's own sizing of the chrome stream after the July 2026 test work.
Reproduced from the Southern Palladium investor presentation of 2 September 2026, slide 15 [R36]. The US$320 a tonne is the slide's own indicative market reference and is not a contracted price. No published Southern Palladium valuation carries chrome revenue at this recovery.
The tonnages on FIG. 05 can be run out, and it is worth doing because no released model carries the answer.
The published economics were struck on 30 per cent chromite recovery. The definitive feasibility study test work returned 85.6 per cent. If Stage 2 produces about 1 million tonnes a year of chrome concentrate on the new recovery, the old recovery would have produced roughly 350,000 tonnes of it. The extra is about 650,000 tonnes a year. At the US$225 a tonne the published economics assume, that is about US$146 million a year of revenue nobody has modelled. At the US$320 a tonne shown on FIG. 05, it is about US$208 million.
Those are Samso's numbers on Samso's assumptions and they are not the company's. They assume the Stage 2 tonnage on the slide holds, that recovery scales the way the ratio suggests, and that a price holds. Each of those can move. The reason for running the arithmetic is not the answer. It is the size of the gap between what the released economics carry and what the plant is now being designed to produce.
On the same arithmetic chrome would run at something like a fifth of project revenue rather than a credit against costs, which is what the company's own change of language in the June 2026 quarterly describes. Samso's working assumption is that at this grade and at the all-in sustaining costs the company now publishes, US$969 an ounce in Stage 1 and US$821 in Stage 2, Bengwenyama would sit in the lower part of the global cost curve before any chrome revenue is counted at all. That is an assumption drawn from the published cost figures and not from a cost curve Samso has built or seen. F-23 records it.
Verdict on test four. Passed, with the flowsheet not yet fixed. The technology is conventional and the company says so expressly. The circuit is still being changed, and the recoveries behind the economics have not been demonstrated at scale.
SAMSO ACCESS Some of the work does not appear here![]() Samso holds back a set of Insights for members. Same method as this piece, the same sourcing and the same counterweights, on companies and sectors that do not make the public feed.
Samso News and Research Workups will join the gated set, with Research Workups also available on their own tier. A$20 a month · cancel any time |
4.00 — TEST FIVE, A CONCENTRATE SOMEONE WILL BUY
The offtake position, and what the company has said about it
Part 1 said this test stops more projects than any of the other seven, and that it gets talked about least.
Southern Palladium has no offtake agreement for its platinum group metal concentrate. It has no memorandum of understanding, no letter of intent and no term sheet. It has none of those for its chrome concentrate either. Samso checked the company's complete announcement record, 239 announcements from its listing on 6 June 2022 to 14 August 2026. No agreement of any of those kinds has been lodged.
The company states this itself. The JORC Table 1 attached to the Pre-Feasibility Study of 28 October 2024 says, under the heading "Marketing arrangements" [R8].
"There are no legal or marketing agreements in place for the Project. Indicative talks have been held with smelters with expression of interest indicated for offtake of concentrates."
The same table, under customer analysis, adds that "no customer and competitor analysis has been undertaken".
The company has talks, and it has described them the same way for two years. The Optimised Pre-Feasibility Study of 10 July 2025 puts it in these words [R16].
"There is a well-established downstream refining process and terms in place for PGM concentrate within South Africa. Most smelters processing the concentrate from the Eastern and Western Limbs are situated in Rustenburg, with almost all the concentrator product in the area being transported by truck to Rustenburg. The Project PGM concentrates are expected to be processed at one of these facilities. Initial talks have been undertaken with smelters owners."
The phrase "terms in place" refers to standard commercial terms existing in that market, not to terms agreed with Southern Palladium. The company has never described the talks themselves as anything more than initial.
Every later mention of offtake is forward looking. The metallurgical announcement says the 1.2 per cent mass pull "is expected to enhance the Company's offtake pathway to large-scale smelters and refineries on the Western Limb" [R15]. The June 2026 quarterly says the result "opens the pathway towards a smelter and refining offtake arrangements" [R4]. The 2025 Annual Report lists progressing offtake arrangements as a priority for 2026 [R2].
Bridge Street, whose analyst holds shares in the company, puts it this way [R7].
"The single most valuable disclosure between now and the DFS would be a signed offtake agreement with a Western Limb smelter."
Payability, and where the assumed number comes from
A mine sells concentrate to a smelter, and the smelter pays for a proportion of the metal in it rather than all of it. That proportion is called payability, and it is agreed in the contract.
The Pre-Feasibility Study's financial model assumes 85 per cent for platinum and palladium, 84 per cent for rhodium and gold, 56 per cent for ruthenium, 54 per cent for iridium and 100 per cent for the chrome concentrate [R8]. Evolution Capital's model uses the same figures, metal for metal [R18].
Those figures come from other companies' contracts. The study says the payabilities "were benchmarked from various other mines selling PGM concentrates through a third-party refiner", and the JORC table says they were "benchmarked based on numerous offtake agreements for PGM concentrates on the Bushveld Complex" [R8]. So the assumption rests on terms other companies have been given. Nobody has offered Southern Palladium terms.
Bridge Street use 80 per cent, and explain why [R17].
"We have used conservative 80% payabilities for Pt and Pd in our valuation reflecting discussions held with third party concentrate suppliers."
Five percentage points of payability on platinum and palladium, the two largest metals by weight, moves every economic number that depends on it. The gap between 80 and 85 per cent is there because no contract has been signed, and it closes when one is.
An 86 per cent payability also appears in the Pre-Feasibility Study, and it is worth separating from the 85 per cent. The 86 per cent is the flat rate used in the resource pay-limit screen, which tests whether the rock has reasonable prospects for eventual economic extraction [R8]. The 85 per cent is the figure used in the financial model. The two do different jobs.
Chrome is a penalty in the concentrate and a product on its own
Chromite is refractory, which means it is hard to melt. In a conventional platinum smelting furnace, chrome in the feed raises the temperature at which the charge melts and can build up a high-melting layer on the furnace floor, which limits how much the furnace can treat. Smelters therefore set limits on how much Cr2O3 they will accept and price accordingly.
Bengwenyama's test concentrates came in at 3.2 and 3.9 per cent Cr2O3 against the company's own target of under 2.5 per cent [R15]. Bridge Street, in a report otherwise strongly positive, calls this "one of the very few negatives we can find in this announcement", noting that "the Cr2O3 content of the concentrate is higher than the spec. required by smelters (3.2% vs 2.5%)" [R19].
The company says the same thing itself, and FIG. 06 is where it says it. The grades along the top are the good news. The list on the right is headed issues to close, and the first line of it is optimising the Cr2O3 content to meet commercial concentrate specifications.

FIG. 06 Concentrate grades from the definitive feasibility study test work, and the company's own list of what is still open.
Reproduced from the Southern Palladium investor presentation of 2 September 2026, slide 17 [R36].
Samso could not obtain a primary technical source for an industry-wide chrome limit, so no general figure is claimed here. The company's own target of under 2.5 per cent is the verified number, and the test concentrates came in 0.7 and 1.4 percentage points above it.
That is the negative case in full, and it applies to one of two products. The same July 2026 test work that left 3.2 per cent chrome in the PGM concentrate recovered 85.6 per cent of the chromite into a separate concentrate grading 42.2 per cent Cr2O3, which is the grade the South African market trades [R15]. Section 3.00 sets out what that did to the shape of the mine and to the price assumption behind it.
Commercially the chrome concentrate is the simpler of the two products. The Pre-Feasibility Study assumes 100 per cent payability on it, against 85 per cent on platinum and palladium, so the study expects none of the chrome revenue to be lost to a buyer's payment terms [R8]. The mining right expressly covers chrome, one of seven minerals granted [R3]. At full Stage 2 production the company expects about a million tonnes of it a year, and it delayed the definitive feasibility study by a quarter specifically to capture that value in the plant design [R3].
FIG. 07 is the market that concentrate would go into. On the sources the company cites, South Africa holds about 72 per cent of the world's chromite resources and produced 23 of the 44 million tonnes shown for 2025. A chrome producer in South Africa is selling into the deepest chrome market there is.

FIG. 07 Where the world's chromite is, and where it is mined.
Reproduced from the Southern Palladium investor presentation of 2 September 2026, slide 16 [R36]. The slide attributes the resource split to the International Chromium Development Association and the production split to the United States Geological Survey. It does not state the unit on the production chart. Samso has read it as tonnes and has not checked either series against its primary source.
There is also a reason to think the two chromes move together rather than against each other. The spirals between flotation stages and the second chromite flotation stage that make the chrome concentrate are the same equipment that takes chrome out of the PGM concentrate [R15]. On that reading, recovering more chrome as product and getting Cr2O3 below 2.5 per cent are one job rather than two competing ones, which would explain why the company says the grades can be lowered in the commercial application. That is Samso's inference from the flowsheet description. The company does not put it that way and it has not been demonstrated at scale.
At a 1.2 per cent mass pull and 443.6 grams per tonne on a 4E basis, Bengwenyama would truck a small tonnage of very high grade concentrate. That is an attractive parcel for a smelter with limited furnace capacity, because the metal per tonne of furnace feed is high. The chrome content counts against Bengwenyama in that negotiation and the grade counts for it.
Neither product has an agreement behind it yet, and that is a step the company has not reached rather than one it has failed. Offtake terms are normally struck once a buyer can see a settled concentrate specification and a credible delivery date, and the July 2026 work is the first time Bengwenyama has had the first of those. What can be said today is that the chrome concentrate already meets a traded specification and the PGM concentrate does not yet, and that closing that gap is a plant design question the company has said it intends to answer.
How the neighbouring mines get their concentrate smelted
Every mine near Bengwenyama has a smelting route. TABLE 03 sets out what Samso could verify about each of them.

Two Rivers is the one case Samso verified in a primary document. It has a life-of-mine agreement with Impala Refining Services, and Implats owns 46 per cent of Two Rivers [R20]. The concentrate has a contracted buyer because the smelter owner is a shareholder in the mine.
Modikwa is owned equally by Valterra Platinum and African Rainbow Minerals, and Valterra owns smelters. Mototolo is wholly owned by Valterra. Booysendal is Northam's, and Northam owns the Zondereinde smelter. Marula is Implats'.
Southern Palladium has no smelter shareholder. It would be a new entrant asking for capacity on commercial terms, which is a harder negotiation than the one its neighbours had.
Waterberg, the cautionary comparison
Platinum Group Metals Ltd's Waterberg project holds 18.7 million ounces and has been looking for a route to market for years. Bridge Street's February 2025 note describes Waterberg's difficulty [R17].
"Ivanplats (IVN TSX) has succeeded in securing capacity (with Northam) for Stage 1 concentrate volumes and part of Stage 2. This appears to have locked the Waterberg project of Platinum Group Metals (PTM TSX) out of the South African market for the time being."
That is a broker's characterisation rather than a company's or a regulator's. The verifiable record is as follows. Northam concluded a ten-year offtake agreement with Ivanplats on 9 December 2021 for about 20,000 tonnes a year of Platreef concentrate [R21]. Platinum Group Metals' discussions with Implats broke down in 2022, after which the company investigated building its own smelter [R22]. In January 2025 it was still "in discussion with several South African smelter operators" while also pursuing a memorandum of understanding for a smelter in Saudi Arabia, which would need South African export permits for unrefined concentrate [R23].
Bridge Street, who are bullish on Southern Palladium, draw a distinction here that Samso thinks is fair. Waterberg is a low grade, base metal heavy Northern Limb concentrate. Bengwenyama would be a high grade, low volume UG2 concentrate. A smelter would look at the two differently. So Waterberg is evidence that a large resource does not guarantee a buyer, and it is not evidence that Bengwenyama will meet the same difficulty.
Is South African smelter capacity actually full?
The claim that South African smelter capacity is full is asserted often. Samso could not verify it from any smelter owner's own statement. No published statement from Valterra Platinum, Implats, Sibanye-Stillwater or Northam that Samso found says its capacity is full or fully contracted.
Valterra Platinum's own guidance gives the one hard number available. In its half-year results presentation of 29 July 2026, Valterra guides purchases of third-party concentrate of 0.9 to 1.1 million ounces on a 6E basis for 2026, against 1.1 million ounces in 2025 [R24]. So a large third-party purchase market exists, and the guided volume is flat to lower year on year.
Analyst commentary supports the claim without proving it. Miningmx reported in October 2024 that a shortage of refining capacity constrains platinum group metal production, and that Platreef's first phase concentrate could not have been processed by Northam at that time despite the signed offtake, because capacity would not have been available had material been supplied then rather than the following year [R25].
The route to a smelter, and the conditions a buyer would set
What Bengwenyama would produce is a high grade UG2 concentrate, and that is relevant to who might buy it. Smelting and refining in South Africa sits with four companies. Impala Platinum, Sibanye Stillwater, Northam Platinum and Valterra Platinum run the furnaces and the refineries, and most of that capacity is on the Western Limb of the Bushveld Complex around Rustenburg. Bengwenyama is on the Eastern Limb, so concentrate would travel across the complex. The Eastern Limb mines already make that journey.
A smelter with limited furnace capacity wants metal per tonne of feed, and this section has already made that point from the flowsheet. The same point works from the buyer's side. A high grade UG2 concentrate is the sort of parcel an integrated producer with a full furnace would look at, because it lifts the metal in the feed without adding much tonnage.
What would a buyer want to see before opening a detailed negotiation? On Samso's reading of how these deals are normally done, two things. A granted mining right, so the seller can actually deliver. And metallurgical work at definitive feasibility study level, so the concentrate specification is settled enough to price. Both now exist. The metallurgical results were released on 9 July 2026 and the mining right was granted on 7 August 2026, and section 6.00 sets out what the grant does and does not cover.
That is Samso's reasoning and not a company statement. Southern Palladium has not announced a condition set by any buyer, has not named a counterparty and has not put a date on a negotiation. What can be said is that the two things a buyer would most obviously want to see are now in place, where twelve months ago neither was. The verdict below does not move, because an argument about sequence is not an agreement.
THE COUNTERARGUMENT Southern Palladium would be selling a small tonnage of high grade concentrate into a market with four integrated buyers, none of which owns any part of it, at a chrome content above the level it has told the market it is targeting, with no agreement and no quoted price. The sequencing argument above is Samso's and not the company's. Nobody has said that a granted mining right and a definitive feasibility study level metallurgical result unlock a negotiation. It is a reasonable reading of how these deals are done. It is still a reading, and the company has been describing offtake talks in the same forward looking language for two years. The commercial terms are the part nobody has seen. Payability, treatment charges, refining charges and the penalty for chrome above specification are the four numbers that decide what a tonne of Bengwenyama concentrate is worth. None of them has been quoted to this company. The financial model uses 85 per cent payability taken from other companies' contracts. Bridge Street use 80 and explain why. A new entrant with no smelter shareholding, asking four companies that each have their own ore to feed, is not the party holding the leverage in that negotiation. Chrome cuts both ways. The chrome that makes the second product is the same material a smelter will not want in the first one. The company says lowering one and recovering the other are the same job. That has not been shown at scale. Every other test in this piece can be answered from a document. This one cannot be answered until an offtake agreement is signed. |
Verdict on test five. Unresolved. No offtake agreement exists and no price has been quoted. Nothing has gone wrong here, the company has simply not secured a buyer yet, and this is the test that decides the project.
5.00 — TEST SIX, A RESERVE RATHER THAN A RESOURCE
What the declared reserve covers
A Mineral Resource says the metal is in the ground. An Ore Reserve says somebody has tested whether that metal can be dug up at a profit, applying the mining, processing, economic, legal and environmental factors involved.
Southern Palladium declared a maiden Probable Ore Reserve on 23 October 2024 of 31.72 million tonnes at 6.17 grams per tonne on a 6E basis, for 6.29 million ounces [R8]. The reserve covers the UG2 reef only. The company's own notes state that no Inferred Resources were included in it, and that it was estimated using a 6E basket price of US$1,557 an ounce before payabilities.
Three qualifications have to be read against that number.
There is no Proved Reserve. Everything is Probable, including the tonnes converted from Measured Resource. Probable is the lower of the two confidence categories.
The 40 million ounce figure is a resource, not a reserve. The total Mineral Resource across UG2 and Merensky reefs is 40.25 million ounces [R26]. Roughly three quarters of that is Inferred, the lowest confidence category. A large part of the Inferred is in the Merensky Reef, which is not in the mine plan at all, because the Pre-Feasibility Study and the Optimised Pre-Feasibility Study are UG2 only. The company also notes that several historic drill holes in one area were not assayed for the minor platinum group elements, so part of the resource is stated on a 4E basis and part on 7E [R4]. The 40.25 million ounce total is therefore a mixed basis number, and the reserve of 6.29 million ounces is the part that has been through an economic test.
FIG. 08 shows why so much of that resource is within reach of a mine plan. Both reefs run shallow and close to parallel across the section, the Merensky Reef comes to surface at the modelled subcrop toward the right, and the horst block in the middle is the shallowest part of the whole line. A horst block is a slab of ground that faulting has pushed up relative to the ground either side of it.

FIG. 08 Section A to A prime, with the Merensky and UG2 reefs, the horst block and the modelled Merensky subcrop.
Reproduced from the JORC Table 1 appendix to Southern Palladium's definitive feasibility study metallurgical announcement of 9 July 2026 [R15]. Reef thicknesses are exaggerated on the original, as its own legend states.
The mine plan is bigger than the reserve. The Optimised Pre-Feasibility Study states that ore production over the first five years is 83 per cent from Measured and Indicated resources, rising to 92 per cent over the first ten years, and that Measured and Indicated account for 70 per cent of total life-of-mine ore production [R16]. The other 30 per cent is Inferred, which by definition cannot be in a reserve. The Stage 1 and Stage 2 plan mines 41.9 million tonnes against a declared reserve of 31.72 million tonnes.
That is not unusual for a study at this stage, and the company discloses all of it. The 30 per cent of the mine life that is Inferred depends on drilling that has not yet been done.
The reserve, and the metallurgy that has changed since
The Ore Reserve has an effective date of 23 October 2024 and it has not been restated. The Optimised Pre-Feasibility Study of July 2025 restructured the mine plan into two stages without changing the reserve, and the June 2026 quarterly still carries the October 2024 figures unchanged [R4].
In the 22 months since, the metallurgical assumptions behind the reserve have changed. Recovery moved from 85.3 to 87.6 per cent, chromite recovery from 30 to 85.6 per cent, and the primary grind from 60 per cent passing 75 microns to 30 per cent. Reserves are calculated using recovery and cost assumptions, so a reserve struck on the old assumptions does not reflect the plant the company now proposes.
That cuts one way worth naming. A reserve is an economic calculation, so a reserve struck on 30 per cent chromite recovery and a US$225 chrome price is a reserve calculated on the worse of the two sets of assumptions the company has published. On the July 2026 test work the same rock carries more revenue per tonne, which lowers the grade at which mining a block pays for itself. The 6.29 million ounces is therefore more likely to be a floor than a ceiling. That is a direction rather than a forecast, and the restatement arrives with the study.
The company's position, stated in the mining right announcement, is that "all the material assumptions underpinning this NPV continue to apply and have not materially changed" [R3]. The same announcement says the definitive feasibility study is being delayed a quarter specifically to capture the extra chrome value in the plant design. Both statements appear in the same document, and they are hard to reconcile. The restated numbers arrive with the study in the first quarter of 2027.
The January 2026 retraction
On 22 January 2026 Southern Palladium lodged a "Retraction of Updated Forecast Financial Information" [R31]. It withdrew slide 9 of a presentation the company had given at the Future Minerals Forum a week earlier, which restated the project's economics using a basket price of about US$2,000 for every 6E ounce. The Optimised Pre-Feasibility Study uses US$1,557. The company also withdrew three peer comparison graphs from the same presentation.
The reason is the ASX Listing Rules. A company may not publish updated forecast financial information for a project unless it comes from a study that has itself been released to the market. The economics had been restated on a higher metal price without a new study behind them.
The company retracted the material within a week rather than defending it, which is the correct response. And the episode is why the Optimised Pre-Feasibility Study of July 2025 remains the only set of economics for this project that can be relied on, whatever the chromite recovery has since done to the numbers. Anyone quoting a Bengwenyama net present value at today's metal prices is restating economics without a study behind them, which is what the ASX stopped the company from doing.
Who signed the reserve
The Competent Person for the Mineral Resources is Uwe Engelmann, a director of Minxcon (Pty) Ltd. The Competent Person for the Ore Reserves is Daan van Heerden, also a director of Minxcon [R8]. Both are reported under the JORC Code, 2012 edition.
Minxcon is the consultant that provides Southern Palladium's geological and technical work, and it authored the Pre-Feasibility Study, the Optimised Pre-Feasibility Study addendum and the resource and reserve estimates. Southern Palladium paid Minxcon about A$655,000 in the June 2026 quarter alone [R4].
PLATE 03 is the work all of that rests on. Thirty-three thousand metres of drilling, core logged by hand, and two Competent Persons who put their names to what it showed.

PLATE 03 Drilling, core logging and the core yard at Bengwenyama.
Photographs from the Southern Palladium investor presentation of 2 September 2026 [R36]. Samso cannot date them.
Both Competent Persons hold a beneficial interest in Southern Palladium through shareholdings in Nicolas Daniel Resources Proprietary Limited, which is one of the company's largest shareholders at 11.83 per cent [R2]. Daan van Heerden is also a non-executive director of Southern Palladium.
The company discloses these interests in every announcement, which is what the disclosure rules are for. Arrangements like this are common in small resource companies and nothing here is an allegation. Samso sets it out because an investor reading a reserve statement should know who signed it and what they own.
Verdict on test six. Passed. A declared reserve exists and it is entirely Probable. The Stage 1 and Stage 2 mine plan mines 10.2 million tonnes more than the reserve, and the reserve will be restated on new metallurgy in 2027.
COFFEE WITH SAMSO The same companies, on the recordCoffee with Samso is the interview series. Management answering questions in long form, so the people behind a project can be judged alongside the numbers in a piece like this one. Free to watch. Companies commission an interview, and it stays free to everyone, permanently. ![]() |
6.00 — TEST SEVEN, PERMITS
The mining right, granted 7 August 2026
The Department of Mineral and Petroleum Resources granted the mining right on 7 August 2026 under section 23(1) of the Mineral and Petroleum Resources Development Act, and Southern Palladium announced it on 10 August [R3]. The right runs for an initial 30 years with a right to apply for renewal. It covers 5,280 hectares across Nooitverwacht 324 KT and Eerstegeluk 327 KT, and it permits the mining of platinum group metals, gold, copper, chrome, cobalt, silver and nickel.
The application was submitted on 29 September 2023 and accepted on 17 October 2023 [R4]. From submission to grant took nearly three years. That delay is a large part of why a shallow, high grade, well located UG2 property was still undeveloped in 2026.
In South African law, granted, executed and registered are three separate stages [R27]. The announcement uses the word "granted" throughout and says nothing about execution or registration. A right is accepted when the Regional Manager confirms the application complies. It is granted when the Minister approves it, at which point the applicant becomes a mining right holder but mining cannot start. It is executed when it is signed by the Regional Manager and the holder in front of a notary, which fixes the effective date and starts a one-year clock to commence mining. It is registered at the Mineral and Petroleum Titles Registration Office within 60 days of the effective date, and registration is what creates a limited real right capable of being sold or encumbered.
Registration is the stage that decides whether the right can be used as security. Until it is registered, the right cannot be pledged, and a project financier lending against a mine wants security over the right to mine it. Southern Palladium has not announced execution or registration. Samso could not verify either.
The conditions attached to the grant have not been published. Kalkine reported on 10 August 2026 that the company indicated it would disclose the full detail of the terms and conditions once its own assessment was complete [R28]. A South African mining right will ordinarily carry conditions covering the approved social and labour plan, the environmental management programme and commencement obligations. None of those conditions is in the public record, so Samso does not describe them.
What is still outstanding
TABLE 04 lists which permits are granted and which are not.

Two licences have to be granted before any work can start on the ground. The board has approved starting box cut and decline development before the end of 2026, and the announcement says that approval is "subject to completion of the relevant waste management and water use permitting processes" [R3]. Neither the water use licence nor the waste management licence has been granted. The 2025 Annual Report said water use licence applications were scheduled to be completed and submitted by December 2025, which means they had not been lodged when that report was signed [R2].
FIG. 09 is the company's own schedule for the work those two licences gate. Site clearance, access roads and fencing fall in 2026, the box cut and portal support run through 2027, and decline development and plant construction carry past the right-hand edge of the chart. The chart stops at 2030 and does not mark a first production date.

FIG. 09 The development pathway as the company schedules it, from site clearance to plant construction.
Reproduced from the Southern Palladium investor presentation of 2 September 2026, slide 18 [R36]. A schedule is a plan, and this one predates the grant of the two outstanding licences.
Bridge Street's view is that granting these "will be a formality" [R19]. That is an opinion from an interested party. What can be verified is that neither licence is granted, and that the company has made its own start date conditional on both.
One further question cannot be closed. Under section 96 of the Act, a person whose rights or legitimate expectations have been materially and adversely affected may lodge an internal appeal against an administrative decision, within 30 days of becoming aware of it [R29]. Samso could not establish whether any appeal has been lodged against this grant, or when the 30 days started, because the period runs from awareness rather than from the date of the decision. This ground has a documented history of third parties objecting, so an investor is entitled to ask the company whether an appeal exists rather than assume none does.
Verdict on test seven. Mostly passed. The mining right is granted. The water use and waste management licences are not, and the right has not been shown to be executed or registered, so a lender cannot yet take security over it.
7.00 — TEST EIGHT, BEING ABLE TO RAISE THE MONEY
The funding requirement, and what the company has
Part 1 said the eighth test works differently from the other seven. It describes market conditions on the day rather than any property of the project, and those conditions change without anything at Bengwenyama changing.
TABLE 05 sets out the requirement against what the company has.

The Appendix 5B for the June 2026 quarter reports zero loan facilities, zero credit standby arrangements, zero total financing facilities and zero undrawn facilities [R4]. The company has no debt and no committed source of debt.
Cash at 30 June 2026 was A$23.879 million, and the quarterly's own estimate of funding available was 11.9 quarters. That figure is calculated against a study phase burn of about A$2 million a quarter. That figure measures how long the company can keep studying. It says nothing about how long it could keep building.
Peak funding of US$279 million comes from the Optimised Pre-Feasibility Study of July 2025 [R16]. It is a project level number on a 100 per cent basis. The study builds it as capital of US$226 million, plus ramp-up operating cost and working capital of US$123 million, less US$69 million of revenue during ramp-up. Those components add to US$280 million against a published figure of US$279 million, so they are rounded. The capital estimate carries an accuracy range of plus or minus 15 to 25 per cent.
FIG. 10 is how the company frames that requirement now, and it adds two things this piece has not used. The US$279 million is Stage 1 peak funding, which the slide puts at 38 per cent below the original Pre-Feasibility Study, and Stage 2 is shown as funded out of Stage 1 cash flow rather than out of a second raise. Stage 1 is put at a 21.8 per cent internal rate of return on its own and Stage 2 at 26.4 per cent, with all-in sustaining costs of US$969 an ounce on a 6E basis in Stage 1 and US$821 in Stage 2.

FIG. 10 Staged development, with Stage 1 peak funding, all-in sustaining costs and the two stage returns.
Reproduced from the Southern Palladium investor presentation of 2 September 2026, slide 11 [R36]. The slide refers back to the Optimised Pre-Feasibility Study of 10 July 2025 [R16] and states that the material assumptions behind that NPV have not changed, so it restates the July 2025 study rather than adding a new one. The US$857 million NPV shown uses the Pre-Feasibility Study price deck.
Two qualifications apply to that number and they do not both point the same way. The estimate predates the July 2026 metallurgical rewrite, so the plant it costs is not the plant now proposed, and a plant with a second product in it is not automatically a cheaper one. Against that, the same rewrite added a revenue stream the funding calculation does not count, so the money to be raised is being measured against a mine the company no longer intends to build. Separately, it is a 100 per cent figure while Southern Palladium owns 70 per cent of MUM, and nothing Samso read says how the community's 30 per cent share of the funding is to be met.
What the dilution looks like
Bridge Street models the funding explicitly, which is more than most research does. Their numbers give the size of the raise.
Their August 2026 note assumes A$200 million of project debt and A$230 million of new equity raised at A$1.40 a share, against roughly 133 million shares on issue [R7]. A$230 million at A$1.40 is about 164 million new shares. That is more new shares than the 133 million currently on issue.
The assumed raise price has fallen with the share price, from A$2.00 in February 2026 to A$1.67 in April and A$1.40 in July [R30]. Bridge Street say so themselves, that the July change "has contributed significant dilution compared with our last valuation where we assumed equity would be raised at $1.67/share" [R19].
That method is circular. Because the assumed raise price tracks the market price, a lower share price produces more assumed shares and a lower value per share. A per-share valuation built this way falls automatically when the stock falls, without anything happening at the project, so it is not a minimum value.
Southern Palladium's own share price has ranged from A$0.195 in May 2025 to A$2.71 in February 2026, and Bridge Street's note has it at A$1.76 in August 2026 [R7]. The orebody did not change over that period.
One thing has changed in how the company presents this, and it is worth separating from what has changed in the project. Nothing has been raised and no facility has been signed. What the 2 September presentation does is split the requirement in two, put Stage 1 at US$279 million and describe Stage 2 as funded out of Stage 1 cash flow rather than a second raise [R36]. If that holds, the dilution modelled above is one event rather than two. It also rests on Stage 1 reaching steady state and generating that cash, which on the company's own schedule in FIG. 09 is a question for 2029 or 2030.
Verdict on test eight. Open. The company needs to raise roughly 1.7 times its market capitalisation. It has no debt facility, no offtake and a mining right not yet in registrable form. Part 1 said this test would be decided by market conditions rather than by the project, and that is still the case.
SUPPORT SAMSO Independent, organic, and free to read![]() We produce independent organic content and need your support to keep that going. Every contribution covers the cost of research, keeps the site running, and buys the time to write the next piece. A$10, A$20, A$30 or an amount you choose One time, weekly, monthly or yearly A donation buys nothing and unlocks nothing. It keeps the work going. |
8.00 — WHAT THE RESEARCH SAYS, AND WHO PAID FOR IT
Who covers this company, and who pays for the coverage
Samso holds reports from two research houses on Southern Palladium, Bridge Street Capital Partners and Evolution Capital. Both disclose that they were paid by the company for the work. Samso has not found unpaid coverage of this company, and has not attempted to establish that none exists.
Bridge Street's disclosure is the most extensive, and they set it out in every report [R7].
"He currently owns shares in SPD... BSCP are Corporate Advisors to SPD and may receive fees from SPD for services provided."
They were also lead manager to the initial public offering and to the capital raisings since. Evolution Capital disclose that they "engaged and received a financial benefit by the company", which may have included corporate advisory, capital raising or underwriting work [R18].
The disclosures do not make the research wrong. Bridge Street have followed this project since before it listed, have been to the site, and publish their assumptions in more detail than most houses do. Samso quotes the disclosures rather than describing them, because the exact wording carries the information.
The two headline valuation numbers, and why they differ
Evolution Capital published a 12-month price target of A$4.80 in January 2026. Bridge Street's August 2026 note carries a valuation above A$9 a share. Those two figures look like a disagreement. They are not the same kind of number.
Evolution builds its figure in three layers and sets each one out [R18]. It starts with an unrisked net asset value attributable to Southern Palladium of A$1,685 million. It applies an 85 per cent probability of development to get A$1,433 million. It adds net cash and subtracts the present value of corporate costs to reach A$1,452 million, then divides by 168 million shares on a pro-forma basis, which assumes two staged equity raisings. That gives the risked net asset value of A$8.65 a share. The A$4.80 target is 0.55 times that figure, a market multiple Evolution describes as covering liquidity, timing, funding and residual delivery risk.
Those are two different discounts, not the same one applied twice. The 85 per cent asks whether the mine gets built. The 0.55 asks what the market will pay for a developer before it is built.
Between them the two houses put a figure on the same asset anywhere from A$4.80 to above A$9. That gap is not a disagreement about the rock. It is a disagreement about how much to take off for everything that is not the rock, and it is the only place in this piece where the discount becomes visible. Evolution takes off 15 per cent for the chance the mine is never built, then takes off a further 45 per cent for what it calls liquidity, timing, funding and residual delivery risk [R18]. Bridge Street takes off neither and assumes the project is fully funded [R7]. Neither house uses the word jurisdiction anywhere in its reasoning. Samso looked for a published figure attributing any part of a South African discount to the country itself and could not find one.
FIG. 11 is the company's own answer to that spread, and it is the plainest thing Southern Palladium has published about the discount. It puts itself at A$6.4 for every attributable resource ounce on a 4E basis, against Chalice Mining at A$26.9 and Bravo Mining at A$19.9, and its own grade is the highest on the chart. Read it for what it is. The peer set is the company's choice, the vertical axis is logarithmic so the gaps look smaller than they are, and the note on the slide says the calculations use data sourced from Evolution Capital, which is one of the two houses this section is about.

FIG. 11 Enterprise value per attributable resource ounce against resource grade, on the company's own peer set.
Reproduced from the Southern Palladium investor presentation of 2 September 2026, slide 8 [R36]. The slide states that the calculations are based on data sourced from Evolution Capital and company reports. The vertical axis is logarithmic.
SAMSO TAKE What a reader should do with a discount nobody has itemised. Evolution takes off 45 per cent for liquidity, timing, funding and delivery, on top of the 15 per cent it takes off for the chance the mine is never built. Bridge Street applies nothing at all. Neither house names jurisdiction, and yet jurisdiction is the first thing most investors say about a South African project. Samso's view is that a discount applied for reasons nobody has written down is precisely where an investor should do their own work rather than accept the number. That may mean the discount is fair. It may mean it is where the opportunity is. This is Samso's opinion and not a finding, and it is not a recommendation to buy, hold or sell anything. Section 10.00 has the fuller argument in Noel's own words. |
Bridge Street publishes no rating and no price target at all. Its explanation is that "we are always reluctant to use our valuations as share price targets. There are too many variables at play" [R7]. Its figure carries no probability of development and assumes the project is fully funded.
So the two net asset values are not a like-for-like pair either, and this is where a reader is most likely to be misled. Evolution's A$8.65 is already risked at 85 per cent. Its unrisked equivalent is about A$10.10 a share, which is Samso's arithmetic on Evolution's own components. Bridge Street's February 2026 figure is A$8.00 [R30]. So the gap between the two houses is about a quarter, not the 8 per cent the two headline numbers appear to show.
The share counts differ as well. Evolution assumes 168 million shares after two staged raisings. Bridge Street counts about 297 million against the 133 million on issue today. Section 7.00 sets out what that means.
What moved the numbers
Bridge Street publishes its own valuation history with the price deck behind each step, which is more than most houses do and makes the next part checkable [R19].
The project valuation went from US$943 million in August 2025 to US$1,933 million in July 2026. The first move was price. In February 2026 the house lifted platinum from US$1,300 to US$1,700 an ounce, palladium from US$1,200 to US$1,400 and rhodium from US$7,500 to US$8,000, and assumed a weaker rand. That took the valuation to about US$1,360 million on the price deck alone [R30]. Everything after that was the project. The first round of definitive feasibility metallurgical results took it to US$1,810 million in April 2026, and the second round took it to US$1,933 million in July. So roughly 40 per cent of the total increase is metal prices and roughly 60 per cent is the metallurgy described in section 3.00.
One claim does not survive the house's own table. The February 2026 note says three times that its price assumptions are at a significant discount to spot [R30]. In July 2026 Bridge Street published a run at spot prices alongside its house deck, and the spot run gives US$1,688 million against US$1,933 million [R19]. So by July the house deck was worth about 14 per cent more than spot rather than less. Two things drive that. The deck carried platinum and palladium above spot in July, and it assumes 17.5 rand to the United States dollar against a spot rate of 16.33. Bengwenyama's costs are almost all in rand, so a weaker assumed rand lowers the dollar cost base and lifts the valuation.
In fairness to the house, the July and August notes drop the discount-to-spot language and simply state the assumptions against the spot price of the day. The claim that does not hold is the February one.
Neither house publishes an annual cash flow schedule, so neither valuation can be added up and checked from outside. That is normal for research on a developer, and it does mean any single valuation figure is one modeller's view.
9.00 — THE VERDICT
The scorecard across both parts
TABLE 06 sets out the scorecard across both parts.

Six of the eight have an answer supported by a public document. Grade, the orebody, capital intensity, the flowsheet, the reserve and the permits are all answered. On permits, the mining right is granted. The water use and waste management licences are still outstanding, and no work can start on the ground until both are issued.
Two tests are not answered, and it is worth being precise about what that means. Test five has no offtake and test eight has no funding package. Neither is a finding against the project. Both are steps a developer takes late, and both are the kind of step that is either done or not done rather than done well or badly. There is no offtake agreement, no memorandum of understanding, no term sheet and no quoted payability, and the payability behind the project economics is benchmarked from what other companies on the Bushveld have been paid. That is a reasonable place to start and it is still an assumption rather than a price.
What the scorecard does not show is the part of the project that has no line on it. The chrome is in none of the published economics. The reserve was struck on the lower of the two recovery assumptions the company has released. And the discount between the two research valuations is wider than the gap in their views of the orebody. Those three are where the value in Bengwenyama has yet to be priced, and none of them can be settled until the definitive feasibility study lands.
THE CASE FOR Bengwenyama is one of the last shallow, outcropping, high grade sections of the UG2 on the Eastern Limb, in a district with sealed roads, grid power, water and a workforce that has mined this reef for a century. The mining right is granted for 30 years over seven minerals. A Probable ore reserve of 6.29 million ounces has been declared. The flowsheet is conventional and the company says so expressly. The July 2026 test work took chromite recovery from 30 per cent to 85.6 per cent and turned chrome from a by-product credit into a second revenue stream of about a million tonnes a year at full production. Capital intensity is about US$1,100 of capital per annual ounce, against about US$3,900 for the nearest ASX-listed comparison. The concentrate would be a small tonnage at more than 440 grams per tonne on a 4E basis. A smelter short of furnace capacity wants exactly that kind of parcel, because the metal per tonne of furnace feed is high. The community owns 30 per cent of the project and the land it is on, which removes the access and social licence problem that has stopped other South African projects. The ten years of litigation that kept this ground undeveloped ended in 2010 with the community winning, which is why the ground was available to buy. And the reason Bengwenyama is hard to compare with anything is the same reason it exists. The United States Geological Survey puts the largest platinum group metal resources and reserves in the Bushveld Complex, and South Africa holds roughly four fifths of the world's reserves [R32]. Investors outside South Africa have very few projects of this kind to measure this one against, and the nearest ASX comparison needs about three and a half times as much capital for each annual ounce. Power is cheaper too, with South African business electricity averaging about US$0.105 a kilowatt hour against about US$0.242 in Australia [R35], and no load shedding for more than a year to August 2026 [R33]. |
The four disclosures that would change the answer
Four disclosures would materially change the answers above. These are the ones to watch for.
A signed offtake agreement with a named smelter, with the payability and the chrome penalty disclosed. That answers test five and turns the payability assumption into a quoted number.
Notarial execution and registration of the mining right at the titles office. That turns the grant into a real right a lender can take security over, and it starts the one-year period the holder has to commence mining.
The water use licence and the waste management licence. The board has already approved starting the box cut and decline before the end of 2026, and neither can begin until both licences are granted.
The definitive feasibility study, now due in the first quarter of 2027, carrying restated capital, restated operating costs, a restated reserve and the chrome revenue properly in the model rather than as a by-product credit.
Southern Palladium's own share price has moved from A$0.195 to A$2.71 and back to A$1.76 across roughly fifteen months. None of those four items had been delivered at any point across those fifteen months.
SAMSO TAKE Part 1 said the first seven tests describe the project and the eighth describes market conditions. Bengwenyama has now answered six of them from the public record. The two still open both need somebody outside the company to act. A smelter has to offer terms. Investors or a lender have to put up about 1.7 times the current market capitalisation. The company cannot make either happen, neither has a date on it, and neither has been refused. So Samso would put two questions to a holder rather than one. If the definitive feasibility study lands in the first quarter of 2027 with better numbers again, and there is still no offtake and no funding package, what has actually changed? And if it lands with chrome properly in the model for the first time, against a valuation discount that no research house has itemised, how would you know whether the price already reflects that or not? Samso does not answer either question here. DYOR. |
10.00 — FROM WHERE I STAND
Jurisdiction, the 30 per cent, and the offtake
Every mining project has more than one problem to solve at the same time. Infrastructure, money, market forces, and the jurisdiction it happens to be in. Southern Palladium has all four.
Jurisdiction is where most investors stop reading. The mainstream calls a place Tier 1 or it does not, and South Africa does not make that list. But there is plenty of evidence that projects work in jurisdictions the market calls difficult. What changes is not whether a project can be built. What changes is how much the people running it matter. In a hard jurisdiction, management and the skill set around them are everything.
That brings me to the 70 and the 30.
I do not read the 30 per cent as a hole in Southern Palladium's ownership. I read it as somebody in-country with a reason to want this project to work. A partner who lives on the ground, holds the land, and carries the same downside you do is not a complication. It is the thing that gets a project through the years when nothing is going right.
Seventy per cent of a big elephant is a lot better than 100 per cent of an ant.
South Africa is two ends of the spectrum in one country. It holds some of the richest PGE ground anywhere and some of the most economic deposits. It also carries the volatility and the constraints that scare most mining entrepreneurs off before they start. Both are true at once, and you do not get the first without accepting the second.
Then there is the offtake.
It is a concern. But these things take time, and it is a chicken and egg for everyone involved. The producer wants the offtake. The smelter wants certainty that the supply will actually be there, and it wants it at the most economical price it can get. Both sides are waiting on the other.
Is it good to have an offtake before a project takes off? Absolutely. Does it have to exist in some form eventually? Yes. Does it always get signed before everything else does? No.
So the question is not really whether the agreement is missing today. It is whether you believe this will evolve, and whether you believe they can raise the money. Management will have some play here that is not public. And the valuation looks drastically different the day an offtake is secured in some form.
Raising the capital is the other half of the same decision. Good rock on its own does not build a mine.
If you want more certainty before you decide, ask the company where the potential of an offtake sits. That is a fair question, and the answer tells you something either way. Then do your own research from that point. It will give you a level of certainty.
And remember what this industry is. It does not take much for market dynamics to change overnight.
What this Insight does is show the detail. The depth, the differences, and the variation in valuation. There is a lot in a project like this one to be studied, and that is the point of the piece. I am not telling you what to think about Southern Palladium. I am telling you there is enough here that you should not decide in five minutes.
SAMSO ACCESS Some of the work does not appear here![]() Samso holds back a set of Insights for members. Same method as this piece, the same sourcing and the same counterweights, on companies and sectors that do not make the public feed. A$20 a month · cancel any time |

11.00 — REFERENCES AND SOURCES
Each source below carries an identifier, [R1] to [R40]. The same identifier appears in the body text at the point that source is used, so any claim can be traced back to the document it came from.
Every reproduced figure in this piece is the company's own artwork, and the credit under it names the announcement or presentation it came from, with the slide or page number. All tables are compiled by Samso from the sources named in each table caption. Where a calculation is Samso's own, the caption says so and the underlying figures are the companies' or the courts' own published numbers.
[R1] Southern Palladium Limited, "Pre-quotation disclosure", ASX and JSE announcement dated 3 June 2022, released 6 June 2022. Source of the corporate chain, the acquisition terms, the clawback terms and the two project milestones.
[R2] Southern Palladium Limited, "2025 Annual Report to Shareholders", financial year ended 30 June 2025. Source of the joint venture accounting note, the shareholder loan terms, the community economic interest, the social and labour plan statement, the substantial holders and the top twenty.
[R3] Southern Palladium Limited, "Mining Right Granted for Southern Palladium's Bengwenyama World-class PGM-Chrome Project", ASX and JSE announcement, 10 August 2026. Source of the grant date, the term, the area, the minerals covered, the ownership statement and the early works conditions.
[R4] Southern Palladium Limited, "Quarterly Activities Report and Appendix 5B for the quarter ended 30 June 2026", 30 July 2026. Source of the tenement schedule, the cash position, the financing facilities, the Jameson Cells assessment, and the reserve carried forward unchanged.
[R5] Southern Palladium Limited, "Abridged Prospectus and Pre-Listing Statement, Secondary Listing on the JSE Main Board", 22 April 2022. Source of the Nurinox ownership and the community description.
[R6] Bengwenyama Minerals (Pty) Ltd and Others v Genorah Resources (Pty) Ltd and Others (CCT 39/10) [2010] ZACC 26, Constitutional Court of South Africa, 30 November 2010.
[R7] Bridge Street Capital Partners, "Southern Palladium Ltd, Mining Right granted. Conceptual valuation >A$9/share", August 2026. Bridge Street are corporate advisers to Southern Palladium, were lead manager to its initial public offering and to subsequent capital raisings, and the author holds shares in the company.
[R8] Southern Palladium Limited, "Prefeasibility Study Results, Project NPV8 of USD1.059bn, Maiden JORC Ore Reserve of 6.29 million oz @6.17g/t PGM(6E)", ASX and JSE announcement, 28 October 2024, effective date 23 October 2024.
[R9] Mineral and Petroleum Resources Development Act 28 of 2002, Republic of South Africa, sections 2, 11, 23, 96 and 100.
[R10] Broad-Based Socio-Economic Empowerment Charter for the Mining and Minerals Industry, 2018, gazetted 27 September 2018, clause 2.1. Cited here through the summary published by Werksmans Attorneys. The gazette itself was not obtained.
[R11] Minerals Council of South Africa v Minister of Mineral Resources and Energy and Thirteen Others (20341/19) [2021] ZAGPPHC 623, Gauteng Division of the High Court, Pretoria, 21 September 2021.
[R12] Fasken, "Update, Mining Charter 2018 Judgment, DMRE Will Not Appeal", 26 November 2021.
[R13] Werksmans Attorneys, "Section 11 of the Mineral and Petroleum Resources Development Act", quoting section 11(1) verbatim.
[R14] White & Case, "Proposed overhaul of South African mining law regime", June 2025, on the draft Mineral Resources Development Bill published 20 May 2025 and corrected 9 June 2025.
[R15] Southern Palladium Limited, "DFS metallurgical studies deliver outstanding PGM and Chromite recoveries", ASX and JSE announcement, 9 July 2026. Source of every recovery, grade, mass pull and flowsheet figure in section 3.00, and of the chrome content of the concentrate.
[R16] Southern Palladium Limited, "Optimised Prefeasibility Study, Project NPV of US$857m with Improved Fundability Through Staged Development", ASX and JSE announcement, 10 July 2025. Source of the capital, peak funding, mine plan and resource classification percentages.
[R17] Bridge Street Capital Partners, "Site visit confirms the quality of the Bengwenyama PGM project. Our NPV8 now US$1.1Bn", February 2025. Source of the 80 per cent payability assumption and the Waterberg characterisation.
[R18] Evolution Capital, "Proven Bushveld Blueprint, De-Risked PGM Delivery, Southern Palladium Ltd", initiation report, 27 January 2026. Evolution Capital disclose that they received a financial benefit from the company.
[R19] Bridge Street Capital Partners, "Significant value-add from final DFS metallurgical test work", July 2026.
[R20] Impala Platinum, Two Rivers Platinum fact sheet, and Two Rivers Platinum company information, on the life-of-mine offtake with Impala Refining Services.
[R21] Northam Platinum Holdings Limited, ten-year concentrate offtake agreement with Ivanplats, announced 9 December 2021.
[R22] Miningmx, "PTM to go it alone on Waterberg palladium smelter after offtake talks with Implats stall", 23 March 2022.
[R23] Polity, "Waterberg discussing concentrate offtake with South African smelter operators amid Saudi mulling", 15 January 2025.
[R24] Valterra Platinum, "H1 2026 Results Presentation", 29 July 2026. Source of the purchase of concentrate guidance.
[R25] Miningmx, "Structurally inflexible, the PGM sector can only watch and wait", 21 October 2024.
[R26] Southern Palladium Limited, "Bengwenyama Mineral Resource Update, Total (UG2 & MR) Mineral Resource now 40.25Moz", JSE SENS announcement, 23 October 2024.
[R27] Werksmans Attorneys, "Mining terminology, the difference between accepted, granted, executed and registered", 26 April 2023.
[R28] Kalkine, "Southern Palladium (ASX:SPD) surges as Bengwenyama Mining Right lands", 10 August 2026.
[R29] Cliffe Dekker Hofmeyr, "How to appeal an administrative decision by the DMRE, a discussion of the amended regulations", 3 February 2021, on section 96 of the Act and regulation 74.
[R30] Bridge Street Capital Partners, "Our project value now +US$1.3bn delivering an A$8/share valuation for SPD", February 2026, and the published valuation and price deck history table reproduced in the July 2026 report.
[R31] Southern Palladium Limited, "Retraction of Updated Forecast Financial Information", ASX and JSE announcement, 22 January 2026. Source of the retraction of the restated basket price economics and the three peer comparison graphs, and of the third quarter 2026 definitive feasibility study timing then current.
[R32] United States Geological Survey, "Mineral Commodity Summaries 2026, Platinum-Group Metals", February 2026. Source of the statement that the largest resources and reserves are in the Bushveld Complex in South Africa, of South Africa's 63,000,000 kilograms of reserves against a world total of more than 76,000,000, of the description of Russia as the world's leading producer of mined palladium, and of the 2024 mine production figures for palladium and platinum. No Russian reserves figure is taken from this table.
[R33] Jonathan Hoyle, "Good news for the 174-year-old industry in South Africa employing 472,000 people", BusinessTech, 23 August 2026. Source of the statement that Eskom has not implemented load shedding for over a year, of the energy availability factor of about 82 per cent on 24 July 2026, of industrial electricity prices having roughly doubled over the past decade, and of the shift by large users to self generation. Secondary source, reported rather than verified against Eskom's own operating data.
[R34] Eskom Holdings SOC Ltd, "2026/2027 Tariff Increase", Eskom Distribution. Source of the approved standard tariff increase of 8.76 per cent for Eskom direct customers effective 1 April 2026, and 9.01 per cent for local authority tariffs effective 1 July 2026.
[R35] GlobalPetrolPrices.com, electricity prices for businesses, 2023 to 2026 average, world average stated for the second quarter of 2026. Source of South Africa at about US$0.105 a kilowatt hour, Australia at about US$0.242, and a world average of about US$0.164. A commercial price aggregator rather than a regulator, and its business category is not the Megaflex or equivalent tariff a mine would negotiate. Reported, not verified. See F-21.
[R36] Southern Palladium Limited, "Investor Presentation", ASX and JSE announcement, 2 September 2026. Source of the locality map, the processing flowsheet, the definitive feasibility study against Pre-Feasibility Study metallurgy comparison, the chrome co-product sizing, the global chromite supply charts, the concentrate grades and the issues to close list, the development schedule, the staged development panel carrying Stage 1 peak funding at 38 per cent below the Pre-Feasibility Study, and the enterprise value per attributable ounce chart. Also the source of the site, community and drilling photographs.
[R37] Eskom Holdings SOC Ltd, "Winter outlook for power grid again predicts no loadshedding, system stability enables key energy security decisions to be updated", media statement, 22 April 2026. Source of the surplus of about 6 gigawatts of peak capacity forecast for the 2026 winter and of the 14 gigawatt unplanned outage stress case.
[R38] Transnet SOC Ltd, network access agreements concluded with eleven private train operating companies, announced 13 May 2026 and reported by SAnews and Engineering News. Source of the eleven operators and of about 24 million tonnes of additional freight capacity.
[R39] S&P Global Ratings sovereign rating actions on South Africa, November 2025 and 29 May 2026, as recorded in National Treasury of the Republic of South Africa media statements. Source of the BB foreign currency and BB+ local currency ratings, the positive outlook, the affirmation of both in May 2026, and the first upgrade in about twenty one years.
[R40] National Treasury of the Republic of South Africa, "South Africa exits the FATF greylist on 24 October 2025", media statement, 24 October 2025. Source of the removal date and of the description of the grey list as the Financial Action Task Force register of countries under increased monitoring.
Cover photo: Chromite (GeoDIL number - 1403), Darla Sondrol. CC0, via Wikimedia Commons (https://commons.wikimedia.org/wiki/File:Chromite_(GeoDIL_number_-_1403).jpg). Reproduced photograph, shown faded under a navy overlay on the article thumbnail.