
INDEPENDENT RESEARCH MEDIA HOUSE FOR THE ASX. DEPTH OVER HYPE.
Delta Lithium (ASX DLI), Research and Coverage
Delta Lithium Limited (ASX: DLI) is a lithium explorer and developer in Western Australia. It was called Red Dirt Metals Limited (ASX: RDT) until 1 May 2023 (ASX code change list). It owns 100 per cent of two projects. Mt Ida has a Mineral Resource of 14.8 million tonnes at 1.21 per cent lithium oxide (scoping study, lodged 17 November 2026). Yinnetharra has a Mineral Resource of 21.9 million tonnes at 1.0 per cent lithium oxide (quarterly report, lodged 27 October 2026). Delta also holds 29.89 per cent of Ballard Mining (substantial holder notice, lodged 20 October 2026). It held A$48.8 million in cash at 30 September 2026 (Appendix 5B, lodged 27 October 2026). Samso had published five pieces on the company at 19 November 2026.
ASX code: DLI. Full legal name: Delta Lithium Limited. Managing Director: James Croser. Non-Executive Chairman: Nader El Sayed. The third director is Steve Kovac, who is non-executive (annual report, lodged 22 September 2026). Delta held A$48.8 million in cash at 30 September 2026. The quarterly cash flow report lists no loan facilities (Appendix 5B, lodged 27 October 2026).
Delta Lithium was called Red Dirt Metals Limited (ASX: RDT) until 1 May 2023, and TNT Mines Limited (ASX: TIN) until 21 September 2021 (ASX code change list). Samso's interviews were published under those two earlier names.
Delta Lithium projects
Delta has two lithium projects in Western Australia, Mt Ida and Yinnetharra. The lithium at both sits in pegmatite, a coarse-grained rock. Two lithium minerals are involved, spodumene and lepidolite. Lepidolite is a lithium mica that also carries rubidium, another metal. The Mt Ida study recovers 38 per cent of the lithium in a spodumene product and 35 per cent in a lepidolite product (scoping study, lodged 17 November 2026). At Yinnetharra most of the lithium is in spodumene (resource announcement, 31 March 2025). Grade is the share of the rock that is lithium oxide, written Li2O. Tantalum is a metal used in electronics, and its grade is given in parts per million.
A Mineral Resource is a company's estimate of the material in the ground that has reasonable prospects of eventual economic extraction. It is reported under the JORC Code, the Australasian reporting code, in three confidence categories. Measured is the highest, Indicated is the middle and Inferred is the lowest.
- Mt Ida Lithium Project, about 100 kilometres north-west of Menzies in the Eastern Goldfields. Lithium, tantalum and rubidium. Delta owns 100 per cent. Ballard Mining holds the rights to gold and precious metals on the same ground under a mineral rights agreement, and Delta keeps every other mineral (scoping study, lodged 17 November 2026).
- Yinnetharra Lithium Project, in the Gascoyne region. Lithium and tantalum. Delta reports 2,325 square kilometres of 100 per cent owned ground (quarterly report, lodged 27 October 2026).
Delta moved its Mt Ida gold assets into a separate company, Ballard Mining Limited (ASX: BM1), which listed on the ASX in July 2025 (scoping study, lodged 17 November 2026). Delta held 156,310,994 Ballard shares, or 29.89 per cent, after Ballard raised capital in October 2026 (substantial holder notice, lodged 20 October 2026). The shares were subject to escrow at 30 September 2026 (quarterly report, lodged 27 October 2026). The Eureka gold project, the subject of Samso's 2021 interview, was sold to Javelin Minerals under an agreement dated 22 October 2024 (annual report, note 13, lodged 22 September 2026).
The Mt Ida resource and scoping study
Delta reports a Mineral Resource at Mt Ida of 14.8 million tonnes at 1.21 per cent Li2O, 170 parts per million tantalum oxide and 0.42 per cent rubidium oxide. Of that, 0.49 million tonnes is Measured, 7.2 million is Indicated and 7.1 million is Inferred. The categories are set on the lithium grade, and the company says the tantalum and rubidium estimates carry lower confidence (resource announcement, 13 November 2025).
The estimate is dated November 2025 and was prepared by the consultancy Snowden Optiro. It counts rock above a cut-off, the lowest grade included. The cut-off is 0.3 per cent Li2O for an open pit, a mine dug from surface, and 0.5 per cent for underground mining. It counts only rock inside trial pit and underground mining shapes, drawn at a price of A$2,350 a tonne for spodumene concentrate grading 6 per cent Li2O. Concentrate is the upgraded product a plant sells (scoping study, lodged 17 November 2026).
A scoping study on Mt Ida was released on 17 November 2026. A scoping study is the first and least detailed level of mining study. This one states an accuracy of plus or minus 40 per cent, which it describes as the industry standard at scoping level. It says its assessments are not sufficient to support an Ore Reserve, the part of a resource that a study has shown can be mined economically (scoping study, lodged 17 November 2026).
The plan is to treat about 8.5 million tonnes at 1.09 per cent Li2O over about 11 years, including construction. Mining would start in two open pits and move underground. A plant treating one million tonnes a year would make about 65,000 tonnes a year of spodumene concentrate, 110,000 tonnes of lepidolite concentrate and 1,700 tonnes of tantalum concentrate (scoping study, lodged 17 November 2026).
The study puts capital before production at A$483 million, including A$64 million of contingency. Operating cost is put at US$756 a tonne before royalties, averaged over the spodumene and lepidolite concentrates together. The price forecasts come from Benchmark Minerals Intelligence and are for spodumene concentrate grading 6 per cent Li2O. They range from US$1,364 to US$2,580 a tonne between 2028 and 2042. The study adjusts those prices down for Mt Ida's 5.5 per cent spodumene product and 3 per cent lepidolite product, and adds a credit for rubidium. No sales agreements are in place (scoping study, lodged 17 November 2026).
About 73 per cent of the planned production comes from Measured and Indicated resources and 27 per cent from Inferred. The study says Inferred material is not a significant share early in the mine plan. Inferred resources carry a low level of geological confidence. The study cautions there is no certainty that further exploration work will lift them to Indicated or that the production target will be realised (scoping study, lodged 17 November 2026).
Recovery is the share of a metal that ends up in the product. The study assumes 73 per cent for lithium, 55 per cent for tantalum and about 60 per cent for rubidium. The lithium and rubidium figures rest on laboratory tests run between April 2022 and November 2023 on composite samples of drill core, including 55 batch flotation tests. The tantalum figure rests on tests in September 2026. Flotation grinds the rock and uses air bubbles to lift the wanted minerals. No bulk sample or pilot scale test had been completed at the date of the study. A test on a one-tonne sample is under way, with results to be announced when it finishes (scoping study, lodged 17 November 2026, and quarterly report, lodged 27 October 2026).
Mt Ida has an approved mining proposal and mine closure plan for open pit and underground mining. The study says the approvals needed to start the project are in place. Adding the processing plant and the tailings storage, where plant waste is held, will need an update to the mining approval (scoping study, sections 5 and 11 and JORC Table 1, lodged 17 November 2026).
The company estimates it may need about A$500 million before production. It says it has a reasonable basis to expect that funding will be available, and that its cash is enough to carry the project through a feasibility study, the detailed study that follows, to a decision to build. The study notes there is no certainty the money can be raised, and that new funding may dilute shareholders. A sale, part sale or joint venture of the project is also possible. The study assumes two to three years of drilling and studies before a decision to build (scoping study, lodged 17 November 2026).
Yinnetharra resource and exploration
Delta reports a Mineral Resource at Yinnetharra of 21.9 million tonnes at 1.0 per cent Li2O and 75 parts per million tantalum oxide, dated March 2025. Of that, 16.1 million tonnes is Indicated and 5.8 million is Inferred, above a cut-off of 0.5 per cent Li2O. Most of it is at the Malinda prospect (quarterly report, lodged 27 October 2026). Delta has applied for two mining leases at Malinda, the second to cover possible underground mining (ASX announcement, 11 May 2026). Both were still applications at 30 September 2026 (quarterly report, lodged 27 October 2026).
The regional drilling campaign reported in June 2026 intersected pegmatites and returned no significant lithium grades (ASX announcement, 16 June 2026). Delta spent the September 2026 quarter mapping and sampling six prospects ahead of drilling planned for the December quarter, subject to approvals. Four are lithium targets and two follow gold found in soil samples (quarterly report, lodged 27 October 2026).
Every Samso piece on Delta Lithium and Red Dirt Metals
5 published pieces as at 19 November 2026, grouped by Samso product. Newest first in each group. Dates are Perth dates.
Samso Insights
- 11 Feb 2024, Is Reality Settling into the Lithium Story? (an Insight on the lithium sector with sections on Delta Lithium and St George Mining)
Coffee with Samso
- 21 Sep 2022, Red Dirt Metals Limited (ASX:RDT) - The Making of a Major Australian Lithium Mining Player.
- 8 Apr 2022, Red Dirt Metals Limited (ASX:RDT) - A Lithium Gem within a Gold Mine.
- 26 May 2021, TNT Mines Limited (ASX:TIN) and the remaking of the Eureka Gold Mine. (an interview on the Eureka gold project, published under the earlier name TNT Mines)
Rooster Talk
Videos on YouTube
- 21 Sep 2022, Red Dirt Metals Limited (ASX:RDT) - The Making of a Major Australian Lithium Mining Player.
- 15 Jul 2022, Red Dirt Metals Limited (ASX:RDT) - Mt Ida - A Lithium and Gold Mine.
- 8 Apr 2022, Red Dirt Metals Limited (ASX:RDT) - A Lithium Gem within a Gold Mine.
- 26 May 2021, TNT Mines Limited (ASX:TIN) and the remaking of the Eureka Gold Mine.
Samso's most recent piece is from February 2024, and its interviews are from 2021 and 2022, when Matthew Boyes led the company.
Questions people ask about Delta Lithium (ASX DLI)
What does Delta Lithium do? Delta Lithium explores for lithium in Western Australia and is studying a mine at Mt Ida in the Eastern Goldfields. It also owns the Yinnetharra project in the Gascoyne.
Is Red Dirt Metals (ASX RDT) now Delta Lithium? Yes. Red Dirt Metals Limited was renamed Delta Lithium Limited. The new name and the code DLI took effect on the ASX on 1 May 2023. It was TNT Mines Limited (ASX: TIN) until 21 September 2021 (ASX code change list).
What is the Delta Lithium share price? This page does not carry a share price. The ASX company page for DLI shows the latest price and every announcement.
What is the latest Delta Lithium announcement? At 19 November 2026 the newest items on the ASX list were all lodged on 17 November 2026. They were the Mt Ida scoping study, an investor presentation and the results of the annual general meeting held that day, where all three resolutions were carried.
Does Delta Lithium have a Mineral Resource? Yes, at both projects. Mt Ida has 14.8 million tonnes at 1.21 per cent Li2O (scoping study, lodged 17 November 2026). Yinnetharra has 21.9 million tonnes at 1.0 per cent Li2O (quarterly report, lodged 27 October 2026).
Is Delta Lithium worth looking at? This page gives no buy, sell or hold call, price target or valuation. Delta has Mineral Resources at both of its projects and a scoping study on Mt Ida, the first level of mining study. No decision to build Mt Ida had been announced at 19 November 2026. Delta held A$48.8 million in cash at 30 September 2026 and lists no loan facilities. Samso had published no research workup on Delta Lithium at 19 November 2026. Its coverage is the interviews and the Insight listed above.
Disclosure
Samso holds no shares in Delta Lithium at 17 November 2026.
This page is general information only.
Depth over hype.
Samso company research pages are independent research commentary for general information only. Nothing on this page is financial product advice, and it does not take into account any reader's objectives, financial situation or needs. Figures are drawn from public sources believed reliable at the stated dates but are not guaranteed, and market-sensitive numbers change daily. Samso or associated parties may hold positions in, or have commercial arrangements with, companies mentioned. Seek professional advice before making investment decisions. © Samso 2026, samso.com.au
Page last reviewed 19 November 2026.