
INDEPENDENT RESEARCH MEDIA HOUSE FOR THE ASX. DEPTH OVER HYPE.
Capricorn Metals (ASX CMM), Research and Coverage
Capricorn Metals Ltd (ASX: CMM) is a gold producer in Western Australia. It owns and runs the Karlawinda Gold Project, an open pit gold mine 65 kilometres south-east of Newman in the Pilbara. Karlawinda poured its first gold in June 2021 and produced 123,589 ounces in the year to 30 June 2026 (results announcement, 27 August 2026). An expansion of its processing plant was completed in September 2026. The company's second project is the Mt Gibson Gold Project, about 280 kilometres north-east of Perth, where gold was mined from 1986 to 1999. Capricorn has published a pre-feasibility study for a new mine at Mt Gibson and is waiting on State approvals. It also holds the Golden Range Project north of Mt Gibson.
ASX code: CMM. Full legal name: Capricorn Metals Ltd. Executive Chairman: Mark Clark. The other directors are Mark Okeby, Myles Ertzen, Bernard De Araugo and Jillian Irvin, all non-executive (annual report, lodged 27 August 2026). Capricorn held A$535.0 million in cash and gold at 30 September 2026 and had no loan facilities (quarterly report, lodged 29 October 2026).
Capricorn Metals projects
Capricorn has two gold projects in Western Australia. Karlawinda is operating. Mt Gibson has a study and is waiting on approvals. The company also holds ground at Golden Range.
A Mineral Resource is a company's estimate of the material in the ground that has reasonable prospects of being mined. It is stated as tonnes and grade and is reported under the JORC Code, the Australasian code for reporting mineral resources. The code has three confidence categories. Measured is the highest. Indicated means the drill holes are close enough together to give reasonable confidence in the tonnes and the grade. Inferred is the lowest, where the drill holes are further apart. An Ore Reserve is the part of the Measured and Indicated resource that a study has shown can be mined at a profit. A reserve is either Proved or Probable, and Probable is the lower of the two.
- Karlawinda Gold Project, 65 kilometres south-east of Newman in the Pilbara. Gold. An operating open pit mine, which means the ore is dug from the surface. Capricorn owns 100 per cent. The Mineral Resource is 160.0 million tonnes at 0.6 grams of gold per tonne, which contains 2,990,000 ounces, as at 31 March 2026. Of that, 2,382,000 ounces is Indicated and the rest is Inferred. The Ore Reserve is 76.4 million tonnes at 0.6 grams per tonne for 1,572,000 ounces, all of it Probable.
- Mt Gibson Gold Project, about 280 kilometres north-east of Perth in the Mid-West. Gold. At study stage and waiting on State approvals. Capricorn owns 100 per cent. The Mineral Resource is 188.9 million tonnes at 0.9 grams per tonne for 5,669,000 ounces, as at 31 March 2026. Of that, 4,700,000 ounces is Indicated and the rest is Inferred. The Ore Reserve is 119.3 million tonnes at 1.0 gram per tonne for 3,670,000 ounces, all of it Probable.
- Golden Range Project, 65 to 100 kilometres north of Mt Gibson. Gold and antimony. Capricorn acquired it with Warriedar Resources in November 2025. The company cites a Mineral Resource of 1.38 million ounces of gold there (quarterly report, lodged 29 October 2026). Warriedar made that estimate before the acquisition. Capricorn's resource table of 27 July 2026 covers Karlawinda and Mt Gibson, and the quarterly report quotes the Golden Range figure as ounces only. Capricorn has started a study of a second processing plant at Golden Range.
The resource and reserve figures for Karlawinda and Mt Gibson are from the company's reserve statement of 27 July 2026. The resource figures include the reserves. The reserves were worked out at gold prices of A$2,200 to A$2,600 an ounce, and the resources at A$2,800 an ounce. The price assumed sets how much material is counted. At a lower price, less of it is.
Karlawinda Gold Project, Capricorn's operating mine
Karlawinda produced 123,589 ounces of gold in the year to 30 June 2026 at an all-in sustaining cost of A$1,629 an ounce (results announcement, 27 August 2026). The all-in sustaining cost is an industry measure of what it costs to produce each ounce and keep a mine running. It leaves out the cost of building or expanding the mine.
Capricorn announced on 23 September 2026 that the expansion of the Karlawinda processing plant was complete. The company says the expanded plant can treat 6.5 million tonnes of ore a year, up from around 4 million tonnes (annual report, lodged 27 August 2026). The company expects production to rise from about 120,000 ounces a year to about 150,000 (results announcement, 27 August 2026). It says the reserve supports a mine life of more than 10 years at that rate (ASX announcement, 23 September 2026).
Capricorn's guidance for the year to 30 June 2027 is 137,000 to 147,000 ounces at an all-in sustaining cost of A$1,900 to A$2,100 an ounce. The company says that assumes the 150,000-ounce rate for the last three quarters of the year. In the September 2026 quarter Karlawinda produced 31,218 ounces at a cost of A$2,005 an ounce. That cost is inside the guidance range. The cost in the June 2026 quarter was A$1,648. The company put the rise down to more earthmoving as the expanded plant came into use (quarterly report, lodged 29 October 2026).
Mt Gibson Gold Project, the study, approvals and funding
Capricorn plans a new mine on the site of the former Mt Gibson mine. Gold was mined there from 1986 to 1999. The company's study gives historical production as 868,468 ounces in its text and 868,478 ounces in its JORC table. Capricorn bought the project in July 2021 for A$39.6 million and a 1 per cent royalty (annual report, lodged 27 August 2026). It has since built a 400-room accommodation village and completed the detailed design of a processing plant.
Capricorn published an updated Pre-Feasibility Study for Mt Gibson on 27 July 2026. A pre-feasibility study is the second of the three study levels a mining project goes through, and it is less detailed than a definitive feasibility study. The study sets out open pits and, for the first time, an underground mine. Both would feed a plant that treats 5.0 million tonnes of ore a year.
The study's mine plan covers ore containing 3.82 million ounces of gold over 19.25 years. The plant is assumed to recover 92.1 per cent, which gives 3.51 million ounces produced. Production in the study averages 182,500 ounces a year over the whole mine life. It averages 260,900 ounces a year in the four years when the open pits and the underground mine run together at full rate.
The company says 96 per cent of the gold produced in the study comes from Ore Reserves. The reserve contains 3.67 million ounces. The other 4 per cent, 143,392 ounces mined, comes from Inferred resources in the underground mine. Inferred material cannot be counted in a reserve, so that part of the plan sits outside it. The study cautions that Inferred resources carry a low level of geological confidence, and that there is no certainty the production targets will be met.
The study gives an all-in sustaining cost of A$1,870 an ounce over the mine life, at an assumed gold price of A$5,500 an ounce. It puts the capital cost before production at A$345 million for the plant and infrastructure and A$129 million for mining, a total of A$474 million. The estimate does not include a contingency, which is an allowance for costs running over. The study says one will be added when funding is decided, and it gives the accuracy of the plant estimate as plus or minus 25 per cent. The study allows a further A$105 million of capital in the first six years of production, mostly for the underground mine. That sits outside the all-in sustaining cost.
Mt Gibson has its federal environmental approval, announced on 30 June 2026. The Western Australian approvals had not been received at 29 October 2026. The company has lodged its environmental assessment document with the State, and the public review closed in the September 2026 quarter.
The study's timetable targets first operations in the March 2028 quarter and says the dates depend on approvals. The company says it is advancing design, procurement and contracts so that it is ready to move into development once the remaining permits are received (quarterly report, lodged 29 October 2026). A decision to build had not been announced at that date.
Capricorn says it intends to pay for Mt Gibson from its existing cash and from Karlawinda's cash flow (Pre-Feasibility Study, 27 July 2026). The company expects to pay A$90 million to A$100 million of income tax in the December 2026 quarter. It says it can fund Mt Gibson internally while making that payment (quarterly report, lodged 29 October 2026).
Drilling below the Mt Gibson pits
Capricorn is drilling below the planned Mt Gibson pits at the Orion South, Lexington and Hornet areas. The results the company listed on 26 October 2026 included 6.0 metres at 57.38 grams per tonne and 34.8 metres at 2.10 grams per tonne. Those lengths are measured along the drill hole, which can be longer than the true thickness of the gold zone. The company expects a first Inferred underground Mineral Resource for Lexington in the December 2026 quarter. The gold found underground at Lexington is not yet in the Mineral Resource.
Every Samso piece on Capricorn Metals
Newest first. Five published pieces as at 17 November 2026. Dates are in Perth time.
Samso Research
- 16 Oct 2026, Capricorn Metals Ltd (ASX: CMM), Part 3 of 3 (Samso Research workup)
- 15 Oct 2026, Capricorn Metals Ltd (ASX: CMM), Part 2 of 3 (Samso Research workup)
- 14 Oct 2026, Capricorn Metals Ltd (ASX: CMM), Part 1 of 3 (Samso Research workup)
Samso Insights
- 19 Oct 2026, Gold in the Yalgoo Mineral Field, the Mines, the Mills and the Companies (has a section on Capricorn, Mt Gibson and Golden Range)
Samso News
- 3 Nov 2026, The Gold Price in Australia and the Gold Regions of Western Australia (the Mt Gibson study is one of four studies compared)
The Samso Research workup was published in three parts from 14 to 16 October 2026 and uses share prices at 8 October 2026. Since the workup the company has reported its full September quarter, including the cost of A$2,005 an ounce, and further drilling results at Lexington.
Questions people ask about Capricorn Metals (ASX CMM)
What does Capricorn Metals do? It mines gold. Capricorn runs the Karlawinda open pit gold mine near Newman in Western Australia. It also plans a second mine at Mt Gibson, north-east of Perth.
What is the Capricorn Metals share price? The ASX website shows the CMM share price. This page lists Samso's coverage and has no live price.
What is the latest announcement from Capricorn Metals? As at 17 November 2026 the most recent operating announcements were the September quarter report, lodged on 29 October, and drilling results from Lexington, lodged on 26 October.
Does Capricorn Metals pay a dividend? Yes. Capricorn declared fully franked dividends of 10 cents a share for the year to 30 June 2026, the first it has paid (results announcement, 27 August 2026).
Is Capricorn Metals worth looking at? This page gives no buy, sell or hold call, price target or valuation. Capricorn has one producing gold mine at Karlawinda and a Pre-Feasibility Study for a second at Mt Gibson. Mt Gibson has its federal approval. Its Western Australian approvals were still being assessed at 29 October 2026, and the company had not reported a decision to build. The Samso Research workup goes through the company in detail.
Disclosure
Samso did not speak with Capricorn Metals management in preparing its research workup. The company did not commission the workup, pay for it or see it before publication. Samso selected Capricorn for research itself. How Samso selects companies is set out in the disclosure of interest in Part 3 of the workup. Warriedar Resources, which Capricorn acquired in 2025, was described as a Samso client in a Coffee with Samso client testimonial published in April 2023.
This page is general information only.
Depth over hype.
Samso company research pages are independent research commentary for general information only. Nothing on this page is financial product advice, and it does not take into account any reader's objectives, financial situation or needs. Figures are drawn from public sources believed reliable at the stated dates but are not guaranteed, and market-sensitive numbers change daily. Samso or associated parties may hold positions in, or have commercial arrangements with, companies mentioned. Seek professional advice before making investment decisions. © Samso 2026, samso.com.au
Page last reviewed 17 November 2026.