top of page

Aureka Limited (ASX AKA), Research and Coverage

aureka-limited

Aureka Limited (ASX: AKA) is a Victorian gold company. It was listed as Navarre Minerals (ASX: NML) until 6 December 2024 (ASX code change list). It owns the Irvine Gold Project and the St Arnaud Comstock Gold and Silver Project. Together they hold an Inferred Mineral Resource of 454,800 ounces of gold at 2.27 grams per tonne (ASX announcement, 18 June 2026). On 13 November 2026 Aureka completed the purchase of the operating Fiddlers Creek mine and the Wedderburn mill (ASX announcement, 16 November 2026). Cash was A$7.0 million at 30 September 2026, before the A$2.5 million paid for the mine and mill (Appendix 5B, 20 October 2026, and ASX announcement, 16 November 2026). Samso had published 4 pieces on the company at 19 November 2026.

ASX code: AKA. Full legal name: Aureka Limited. Managing Director: James Gurry. The other directors are Graeme Hunt, the independent non-executive chair, and Richard Taylor and Angela Lorrigan, both independent non-executive directors (annual report, lodged 30 September 2026). Aureka held A$7.0 million in cash at 30 September 2026. The quarterly cash flow report lists no loan facilities (quarterly report and Appendix 5B, lodged 20 October 2026).

Aureka projects

Aureka explores for gold in Victoria. It has a Mineral Resource at two projects, Irvine and Comstock. Since 13 November 2026 it also owns a small underground gold and silver mine at Fiddlers Creek and the Wedderburn processing mill (ASX announcement, 16 November 2026).

A Mineral Resource is a company's estimate of the gold in the ground that has reasonable prospects of eventual economic extraction. It is reported under the JORC Code, the Australasian reporting code, as tonnes of rock and grade. Grade is the amount of gold in the rock, given in grams per tonne (g/t). The code has three confidence categories. All of Aureka's resource sits in the lowest one, Inferred, where drill holes are widely spaced. Aureka has not reported an Ore Reserve, the part of a resource that a study has shown can be mined economically (ASX announcement, 16 November 2026).

  • Irvine Gold Project, in the Stawell Corridor about 16 kilometres south of the operating Stawell Gold Mine. Gold. 100 per cent owned. Exploration licence EL 5476 holds the resource (tenement schedule, quarterly report, lodged 20 October 2026). The Inferred Mineral Resource is 4.79 million tonnes at 2.59 g/t for 398,300 ounces. The cut-offs are 0.5 g/t for the Resolution open pit, 1.0 g/t for Resolution underground and 0.6 g/t for the Adventure open pit, whose estimate dates from March 2021 (ASX announcement, 18 June 2026). Aureka is drilling to extend it.
  • St Arnaud Comstock Gold and Silver Project, about 2 kilometres north-north-west of St Arnaud. 100 per cent owned through a subsidiary. The Inferred Mineral Resource is 1.45 million tonnes at 1.21 g/t for 56,500 ounces of gold, with 2.14 g/t silver for 100,000 ounces, above a cut-off of 0.5 g/t. A cut-off is the lowest grade counted in the estimate (ASX announcement, 5 November 2026, repeating the estimate of 13 June 2025).
  • Fiddlers Creek mine and Wedderburn mill, at Percydale and Wedderburn in Victoria. Gold and silver. 100 per cent owned. The mine began production in July 2025. It runs under a granted Prospecting Licence, and a Mining Licence application has been lodged. Aureka has not reported a Mineral Resource for Fiddlers Creek. About 39 square kilometres of exploration licence surrounds the mine (ASX announcements, 7 September and 16 November 2026).
  • Other ground. The Jubilee project near Ballarat and the Morning Bill gold and base metals project. Several licences in the schedule are applications and are not yet held (quarterly report, lodged 20 October 2026).

The Fiddlers Creek and Wedderburn purchase

Aureka bought High Grade Holdings Pty Ltd, the owner of the mine and the mill, and completed the purchase on 13 November 2026 (ASX announcement, 16 November 2026). The base price was A$8.9 million. That was A$2.5 million in cash and 53,333,333 Aureka shares at A$0.12, plus reimbursement of rehabilitation bonds of up to A$0.5 million. Up to A$2.0 million more may become payable within three years, as four milestone payments of A$500,000 each. A milestone not met in its period lapses (quarterly report, lodged 20 October 2026, and ASX announcement, 16 November 2026). Three milestones are tied to gold output through Wedderburn of 900, 2,500 and 4,000 ounces. The company says these are payment terms only and not production guidance (ASX announcement, 16 November 2026).

The Wedderburn mill uses gravity and flotation. Gravity separates heavy gold particles. Flotation uses air bubbles to lift the metal-bearing minerals out of the ground rock into a concentrate, which the mill sells to an offtake partner, a buyer under contract. Aureka says the mill has a capacity of about 42,000 tonnes a year at 80 per cent uptime and is used at about 20 per cent of that (ASX announcement, 16 November 2026).

The seller gave figures for the 12 months to 30 June 2026, while the operation was ramping up. Head grade, the grade of ore fed to the mill, averaged 7 g/t. Gold recovered was 416 ounces. Recovery, the share of the gold the mill captured, averaged 86 per cent during commissioning. Aureka reviewed these figures. They are unaudited and the company says they are not a production target or forecast (ASX announcement, 16 November 2026).

Irvine drilling and the Exploration Target

Aureka lifted the Irvine resource from 304,000 to 398,300 ounces in June 2026. The company says the Resolution Lode estimate draws on 48 diamond and 31 aircore holes. Diamond drilling cuts a solid core of rock. Aircore samples the softer weathered rock near surface. Of the ounces, 163,300 are counted for a possible open pit and 235,000 for underground mining. Metallurgical testing, which shows how much of the gold a mill can recover, has not yet taken place for Irvine, and the estimate uses costs and recoveries benchmarked against similar deposits (ASX announcement, 18 June 2026).

Aureka's hole RD057, 725 metres north of the Resolution lode and outside the resource, returned 4.25 metres at 1.42 g/t from 173 metres and 5.65 metres at 0.83 g/t from 341.5 metres. These are downhole lengths, measured along the line of the hole (ASX announcement, 14 October 2026). Hole RD060 returned 5.45 metres at 2.89 g/t from 169.4 metres, including 1.55 metres at 8.25 g/t, and 4.4 metres at 1.11 g/t from 219.45 metres. These are also downhole lengths, and true widths are not yet known (ASX announcement, 17 November 2026). In hole RD061W2 geologists logged visible gold, meaning gold seen by eye in the core. Assays are pending, and the company cautions that visual logging is not a substitute for laboratory results (ASX announcement, 17 November 2026).

Aureka also reports an Exploration Target around the Irvine resource. An Exploration Target is the company's estimate of a range of tonnes and grade for ground that has not been drilled enough to estimate a resource. It is conceptual. There has been insufficient exploration to estimate a Mineral Resource there, and it is uncertain whether further exploration will result in one (ASX announcement, 18 June 2026).

The company's documents give different ranges. The 18 June 2026 announcement puts its advanced targets, where the known lode may continue, at 57,000 to 130,000 ounces in its highlights and at 1.33 to 2.66 million tonnes for 85,000 to 197,000 ounces in its Table 5. Its conceptual targets, to the west of the main lode, are 2.35 to 4.7 million tonnes for 151,000 to 348,000 ounces. Both are at 2.0 to 2.3 g/t. The 16 November 2026 announcement gives 316,000 to 665,000 ounces for Irvine (ASX announcements, 18 June and 16 November 2026).

St Arnaud Comstock

Resources Victoria granted Prospecting Licence PL008915 over Comstock on 4 November 2026. In Victoria a Prospecting Licence allows small-scale mining for up to seven years. This one covers about 4.5 hectares inside the old Comstock mine site, last mined from 1992 to 1995. Before work starts Aureka needs the consent of the Crown Land Minister through Parks Victoria, an approved work plan and a rehabilitation bond, and it must meet the Djaara Land Use Activity Agreement. Aureka has not made a decision to mine at Comstock. Ore would go to Wedderburn, about 45 kilometres away. A concept study was published in 2026, and the company says it is not a Scoping Study under the JORC Code (ASX announcement, 5 November 2026).

Diamond drilling in 2026 returned 4.4 metres at 8.9 g/t gold and 57.8 g/t silver from 102.8 metres in hole NED032, including 0.3 metres at 65.3 g/t gold. Results at the Walkers Zone included 2.65 metres at 5.78 g/t from 20.5 metres in NED035, including 0.35 metres at 34.2 g/t, and 1.9 metres at 5.63 g/t from 56.5 metres in NED033. These are downhole lengths. The company estimates true widths at 50 to 80 per cent of them. Metallurgical tests on Comstock ore are planned. The company suggests the gold may be free milling, meaning recoverable without special treatment. It says this is still to be confirmed by metallurgical tests (ASX announcement, 5 November 2026).

Aureka cash and funding

Aureka spent A$972,000 on exploration and A$933,000 on staff, administration and corporate costs in the September 2026 quarter. The quarterly report gives A$7.25 million of commitments at A$0.12 a share from a placement and a share purchase plan. The 16 November 2026 announcement gives the two-tranche raise as A$7.65 million. Shareholders approved the second tranche of the placement on 23 October 2026 (results of meeting, 23 October 2026). The Appendix 5B divides the A$7.0 million in cash by the quarter's net operating outflow of A$1,879,000 and gives 3.72 quarters of funding. That cash figure is from before the A$2.5 million cash payment for High Grade Holdings (quarterly report and Appendix 5B, lodged 20 October 2026, and ASX announcement, 16 November 2026).

At 30 June 2026 total liabilities were A$1.6 million against total assets of A$5.6 million. Aureka also had A$1.73 million of commitments under put and call option deeds over two land parcels near Irvine (annual report, lodged 30 September 2026). The company says it will need more funding to progress Comstock (ASX announcement, 5 November 2026).

Every Samso piece on Aureka

4 published pieces as at 19 November 2026, grouped by Samso product. Newest first in each group. Dates are Perth dates.

Samso Insights

Samso News

Questions people ask about Aureka (ASX AKA)

What does Aureka do? It explores for gold in Victoria at Irvine and Comstock, and since November 2026 it owns the Fiddlers Creek mine and the Wedderburn mill. The ASX code change list shows Navarre Minerals Limited (ASX: NML) became Aureka Limited (ASX: AKA) on 6 December 2024.

What is the Aureka share price? The ASX website shows the AKA share price. This page lists Samso's coverage and has no live price.

What is the latest announcement from Aureka? As at 19 November 2026 the most recent, lodged on 17 November 2026, was an application for quotation of securities. The ASX lists the newest ones.

Does Aureka produce gold? The Fiddlers Creek mine has produced gold since July 2025, and Aureka has owned it since 13 November 2026. Aureka has not reported a production target for Fiddlers Creek or the Wedderburn mill (ASX announcement, 16 November 2026).

Is Aureka worth looking at? This page gives no buy, sell or hold call, price target or valuation. It sets out the company's projects and cash, each with its source document. Samso had published no research workup on Aureka at 19 November 2026.

Disclosure

Samso holds no shares in Aureka at 17 November 2026.

This page is general information only.

Depth over hype.

Samso company research pages are independent research commentary for general information only. Nothing on this page is financial product advice, and it does not take into account any reader's objectives, financial situation or needs. Figures are drawn from public sources believed reliable at the stated dates but are not guaranteed, and market-sensitive numbers change daily. Samso or associated parties may hold positions in, or have commercial arrangements with, companies mentioned. Seek professional advice before making investment decisions. © Samso 2026, samso.com.au

Page last reviewed 19 November 2026.

bottom of page