Andromeda Metals Limited (ASX: ADN) is an industrial minerals company based in Adelaide. It was called Adelaide Resources Limited before a name change announced on 3 January 2017. Its main asset is the Great White Project, a kaolin clay deposit on South Australia's Eyre Peninsula, which it owns 100 per cent. Great White has an Ore Reserve of 15.1 million tonnes of kaolinised granite and a completed feasibility study. The company is seeking the funding needed before it decides to build (annual report, lodged 29 September 2026). Andromeda is also running a pilot plant that turns Great White kaolin into high purity alumina, a material used in batteries, LEDs and semiconductors. An independent laboratory measured up to 99.9989 per cent purity on pilot samples (ASX announcement, 29 October 2026). Andromeda held A$4.3 million in cash at 30 September 2026 (Appendix 5B, lodged 28 October 2026).
ASX code: ADN. Full legal name: Andromeda Metals Limited. Executive Chair: Sue-Ann Higgins. The other directors are Mick Wilkes, Jean-Dominique Sorel and Miguel Galindo, all non-executive. Sarah Clarke is Acting Chief Executive Officer (annual report, lodged 29 September 2026). Cash was A$4.3 million at 30 September 2026. The quarterly cash flow report lists no loan facilities and one A$90,000 credit card facility (Appendix 5B, lodged 28 October 2026).
A Samso post of December 2021 says its author was an early Andromeda shareholder and left the register many times. Samso published a client testimonial from Andromeda's then managing director in May 2022.
Andromeda Metals projects
Andromeda's projects are in South Australia. Kaolin is a white clay used in ceramics, porcelain and tiles. Halloysite is a related clay mineral found with it at Great White. Andromeda reports its deposits under the JORC Code, the Australasian reporting code. A Mineral Resource is an estimate of material in the ground that has reasonable prospects of eventual economic extraction. The code has three confidence categories. Measured is the highest, Indicated is next and Inferred is the lowest. An Ore Reserve is the part of the Measured and Indicated resource that a study has shown can be mined economically. Proved is the higher of its two categories and Probable is the lower.
- Great White Project, on the Eyre Peninsula, about 15 kilometres south-west of Poochera. Kaolin and halloysite. Andromeda owns 100 per cent. The Mineral Resource is 34.6 million tonnes of kaolinised granite, the weathered rock that holds the clay. Of that, 5.7 million tonnes is Measured, 14.2 million tonnes is Indicated and 14.7 million tonnes is Inferred. The Ore Reserve is 15.1 million tonnes of kaolinised granite, with 5.2 million tonnes Proved and 10.0 million tonnes Probable. Figures are rounded. The reserve table gives a yield of 46 per cent, the share of that rock recovered as refined kaolin. The resource dates from 26 November 2020 and the reserve from 6 April 2022. The resource includes the reserve (annual report, lodged 29 September 2026).
- HPA Project. Andromeda owns 100 per cent. It is a processing project that takes refined kaolin from Great White as its feed.
- Eyre Kaolin Project, four exploration licences near Great White. Andromeda has earned 51 per cent of a joint venture and can reach 80 per cent by spending a further A$2 million by November 2027 (quarterly report, lodged 28 October 2026). The Chairlift deposit there has an Inferred resource of 53.5 million tonnes on a 100 per cent basis (annual report, lodged 29 September 2026).
Great White Project, the feasibility study and funding
Andromeda has finished the pre-construction work at Great White, which it calls Early Works. That covered bulk earthworks for the processing plant, close-spaced drilling to guide mining, called grade control, and the delivery of key equipment with long order times (quarterly report, lodged 31 July 2026). The company says the project has all key approvals to start construction and four binding offtake agreements, which are contracts with buyers for the product (annual report, lodged 29 September 2026).
The mine plan comes from a definitive feasibility study, the most detailed of the three study levels, updated in August 2023 to an accuracy of plus or minus 15 per cent (ASX announcement, 24 August 2023). Ore Reserves make up 99 per cent of the 2023 study's production target. The other 1 per cent is Inferred resource, which the study cautions carries a low level of geological confidence (ASX announcement, 24 August 2023).
The annual report describes a modified version in three stages over a 28-year mine life. The first stage, called Stage 1A+, would have a nominal capacity of 100,000 tonnes a year, measured wet, for a capital cost of A$84 million. Later stages would lift capacity to 330,000 tonnes a year for a cumulative A$194 million (annual report, lodged 29 September 2026).
Merricks Capital has given credit approval for a A$75 million debt facility. The amount includes principal, capitalised interest and fees, cash reserves and a cost overrun allowance (ASX announcement, 4 June 2025). A binding agreement depends on Andromeda first securing the rest of the funding. The company puts that balance at about A$40 million of equity and calls the estimate indicative (quarterly report, lodged 28 October 2026). No decision to build has been announced. Talks with a Middle East-based cornerstone investor reached final stages and were then interrupted by events in that region. Andromeda says it cannot estimate a timeframe or give assurance that the transaction will complete. It says it remains engaged with the investor and is assessing other funding options (annual report, lodged 29 September 2026).
Andromeda HPA Project, the pilot plant results
Andromeda runs a pilot plant that makes high purity alumina, shortened to HPA, from Great White kaolin. HPA is used in LEDs, lithium-ion battery separators, semiconductors and synthetic sapphire (annual report, lodged 29 September 2026).
The pilot plant runs continuously, a step up from laboratory batches. An independent laboratory, EAG Eurofins, measured 99.9986 per cent on the first pilot product (ASX announcement, 24 August 2026). Of three later samples, two measured 99.9989 per cent. The announcement text gives the third as 99.9986 per cent. The laboratory certificate attached to it gives 99.9988 per cent. A more conservative calculation, which also counts elements below the detection limit, gave up to 99.9966 per cent. A first commercial sample has gone to a potential customer in Japan (ASX announcement, 29 October 2026).
A scoping study, the earliest and least precise study level, assessed a plant making 10,000 tonnes of HPA a year. It put capital at about A$155 million, including a 30 per cent contingency, to an accuracy of plus or minus 30 per cent. It put operating cost at about A$4,718 (US$3,020) a tonne and assumed a price of US$20,000 a tonne. The study cautions that it rests on low-level technical and economic assessments and that there is no certainty its outcomes will be achieved. Its samples were made in batches, before the pilot plant ran. The project also depends on further funding and on Great White being built to supply the kaolin (ASX announcement, 18 September 2025).
Planning for a pre-feasibility study, the second study level, is under way (ASX announcement, 29 October 2026).
Andromeda Metals cash and funding
Andromeda raised A$3.04 million before costs in September 2026 (ASX announcement, 4 September 2026). Its September quarter outgoings were A$1.36 million on operating activities and A$0.50 million on exploration and evaluation. The Appendix 5B divides the available funding by those outgoings and gives 2.36 quarters (quarterly report and Appendix 5B, lodged 28 October 2026).
The annual accounts were prepared on a going concern basis. The directors consider that basis appropriate. They say that, if further funding is not secured, at least A$2.0 million would be needed progressively from June 2027. If that funding is not achieved, they say there is a material uncertainty over the group continuing as a going concern. The auditor's report draws attention to the same note and its opinion is not modified (annual report, lodged 29 September 2026).
Total liabilities were A$1.8 million and net assets A$66.2 million at 30 June 2026. Net assets were A$157.9 million a year earlier. The fall follows an impairment of A$98.9 million on the Great White Project. The directors say the write-down reflects their assessment of the project's pre-development status (annual report, lodged 29 September 2026).
Shareholders are due to vote on 19 November 2026 on consolidating every 10 shares into one, to take effect on 20 November 2026 if passed (notice of meeting, lodged 16 October 2026). Mick Wilkes is due to retire from the board at the end of that meeting and Dr Stephen Grocott is due to join it (ASX announcement, 30 October 2026).
Every Samso piece on Andromeda Metals
12 published pieces as at 17 November 2026, grouped by Samso product. Dates are Perth dates.
Samso Insights
- 5 Jan 2022, The Story of Halloysite - is it all just Hype or Something More.....
- 29 Aug 2019, A simple business in mining Clay - Andromeda Metals Limited (ASX: ADN)
Samso News
- 24 Oct 2025, Andromeda Metals—HPA pilot program moves into continuous production and customer sampling.
- 3 May 2025, Andromeda Metals Limited Achieves Breakthrough in High Purity Alumina (HPA) Production
Coffee with Samso
- 21 Apr 2022, Andromeda Metals Limited (ASX:ADN) - An ASX Kaolin Giant in the making - DFS Completed.
- 14 Dec 2021, Andromeda Metals Limited (ASX:ADN) - The Real Story.
- 27 Jan 2021, Mining Kaolinite - Just a Matter of Time: Andromeda Metals Limited (ASX:ADN)
- 9 Jun 2020, Mining High-Grade Kaolinite - Australia
- 2 Mar 2020, Mining Halloysite in South Australia
- 14 Nov 2019, The Halloysite and the Kaolin Industry - The Myth and Facts (the first interview with Andromeda's James Marsh)
Rooster Talk
- 3 Sep 2020, The Art of Creating Kaolinite that Pays: Andromeda Metals Limited (ADN)
Client testimonial
- 31 May 2022, Samso's unique angle to investor relation activities for Andromeda Metals Limited (ASX:ADN)
Videos on YouTube
- 21 Apr 2022, Andromeda Metals Limited (ASX:ADN) - An ASX Kaolin Giant in the making - DFS Completed.
- 14 Dec 2021, Andromeda Metals Limited (ASX:ADN) - The Real Story.
- 27 Jan 2021, Mining Kaolinite - Just a Matter of Time: Andromeda Metals Limited (ASX:ADN)
- 3 Sep 2020, The Art of Creating Kaolinite that Pays: Andromeda Metals Limited (ADN)
- 9 Jun 2020, Mining High-Grade Kaolinite - Australia
- 2 Mar 2020, Mining Halloysite in South Australia
- 14 Nov 2019, The Halloysite and the Kaolin Industry - The Myth and Facts
Samso's most recent piece, of 24 October 2025, covered the start of pilot-scale HPA test work. Since then Andromeda has reported HPA from the pilot plant, finished Early Works and recorded the impairment described above.
Questions people ask about Andromeda Metals (ASX ADN)
What does Andromeda Metals do? It is developing the Great White kaolin project in South Australia and piloting a process to make high purity alumina from that kaolin.
Was Andromeda Metals formerly Adelaide Resources? Yes. Adelaide Resources Limited told the ASX on 3 January 2017 that its name had changed to Andromeda Metals Limited. The ASX code stayed ADN.
What is the ADN share price? The ASX website shows the ADN share price. This page lists Samso's coverage and has no live price.
What is the latest announcement from Andromeda Metals? As at 17 November 2026 the newest item on the ASX list was a notice of lapsed performance rights, lodged on 2 November 2026. The September quarter report was lodged on 28 October 2026 and HPA results on 29 October 2026.
Is Andromeda Metals producing kaolin or HPA? Not commercially. The September quarter report says there was no substantive mining production or development. Great White is waiting on funding. The HPA pilot plant makes product for testing and customer samples.
Is Andromeda Metals worth looking at? This page gives no buy, sell or hold call, price target or valuation. Andromeda has an Ore Reserve of 15.1 million tonnes of kaolinised granite at Great White and says the project has its key approvals. The equity funding for the first stage is not yet secured. Its pilot plant has made HPA above 99.99 per cent purity, and the study behind the HPA Project is at scoping level. Cash was A$4.3 million at 30 September 2026. The Samso News piece of 24 October 2025 covers the start of the pilot program.
Disclosure
Samso's posts on Andromeda say the following. In the Coffee with Samso post of 14 December 2021 the author says he was an early shareholder and left the register many times. On 31 May 2022 Samso published a post headed as a client testimonial from James Marsh, named in it as managing director of Andromeda Metals, about the Coffee with Samso interviews.
Andromeda Metals was a Samso client. That arrangement has ended. Samso holds no shares in Andromeda Metals.
This page is general information only.
Depth over hype.
Samso company research pages are independent research commentary for general information only. Nothing on this page is financial product advice, and it does not take into account any reader's objectives, financial situation or needs. Figures are drawn from public sources believed reliable at the stated dates but are not guaranteed, and market-sensitive numbers change daily. Samso or associated parties may hold positions in, or have commercial arrangements with, companies mentioned. Seek professional advice before making investment decisions. © Samso 2026, samso.com.au
Page last reviewed 17 November 2026.