Zeotech Limited (ASX: ZEO) is a Brisbane materials company. It listed on the ASX on 16 October 2009 (ASX company data) and was called Metalsearch Limited (ASX: MSE) until 2 December 2020 (ASX code change list). It owns the Toondoon kaolin project in Queensland, where the Mineral Resource is 45.6 million tonnes (ASX announcement, 9 November 2026). Kaolin is a white clay. Zeotech plans to export some of it and to heat some of it to make AusPozz, a powder that replaces part of the cement in concrete. It is also testing a zeolite product meant to cut methane from landfill. Cash was A$6.6 million at 30 September 2026 (Appendix 5B, lodged 26 October 2026). Samso had published 4 pieces on the company at 19 November 2026.

ASX code: ZEO. Full legal name: Zeotech Limited. Chief Executive Officer: James Marsh. Sylvia Tulloch is the non-executive chair. Peter Zardo is the managing director and Shane Graham is an executive director. Robert Downey is a non-executive director (annual report, lodged 21 September 2026, and AGM presentation, 12 November 2026). Zeotech held A$6.6 million in cash at 30 September 2026. The quarterly cash flow report lists no loan facilities (quarterly report and Appendix 5B, lodged 26 October 2026).

Zeotech projects and products

Zeotech is a materials company based in Brisbane with two kaolin projects in Queensland. Kaolin is a white clay used in ceramics, coatings and cosmetics (ASX announcement, 24 June 2025). A Mineral Resource is an estimate of material in the ground that has reasonable prospects of eventual economic extraction. It is reported in three categories of falling confidence, called Measured, Indicated and Inferred. An Ore Reserve is the part of a resource that a study has shown can be mined economically. No Ore Reserve has been declared for Toondoon (ASX announcement, 9 November 2026).

  • Toondoon Kaolin Project, Queensland. About 20 kilometres south of Mundubbera. Zeotech holds 100 per cent through a subsidiary, on one mining lease and two exploration permits, and owns about 682 hectares of freehold land over the lease. The Mineral Resource is 45.6 million tonnes at 31.8 per cent alumina and 8.8 per cent iron oxide. Alumina content is the measure of grade used here. The estimate has 14.35 million tonnes Measured, 22.3 million tonnes Indicated and 8.9 million tonnes Inferred. A cut-off grade, the lowest grade counted, of 23 per cent alumina applies to the sandy kaolin layer only (ASX announcement, 9 November 2026).
  • AusPozz. A metakaolin, which is kaolin heated to about 700 to 800 degrees Celsius so that it reacts with cement. It is a supplementary cementitious material, meaning a powder that replaces part of the cement in concrete. It is at trial stage (ASX announcement, 9 November 2026, and quarterly report, lodged 26 October 2026).
  • Kaolin direct shipping ore. Clay that is mined and shipped without being processed into another product. Zeotech has a binding offtake agreement, an agreement to buy future production, with a Chinese trading house. It is conditional on financing and approvals.
  • zeoteCH4. A zeolite product for landfill. Zeolites are porous minerals that can hold other molecules. Zeotech has a patented process to make them from materials that include kaolin (annual report, lodged 21 September 2026). The product is mixed into the soil cover of a landfill to cut methane emissions.
  • Abercorn Kaolin Project, Queensland. Four exploration permits, held 100 per cent. Zeotech reports an Indicated and Inferred Mineral Resource there, estimated in July 2020 (annual report, lodged 21 September 2026).

The Toondoon Mineral Resource

Zeotech reported the current Toondoon estimate on 9 November 2026. It replaced a June 2025 estimate of 20.36 million tonnes. Measured Group, an independent consultancy, prepared it from 246 drillholes for 6,876 metres drilled between 2021 and 2026. The 2026 drilling was aircore, a method that uses compressed air to lift clay chips up the drill rods. The 2025 estimate averaged 34.21 per cent alumina and 6.03 per cent iron oxide (ASX announcement, 9 November 2026).

The estimate describes a shallow deposit that starts at or near surface and suits open-cut mining. Like most resource estimates, it is reported in the ground, with no allowance for mining losses or processing. Zeotech says its next phase of work will cover mine planning, metallurgical testing, approvals and economic evaluation for the larger resource. Part of the resource lies outside the mining lease, on the exploration permits, and would need more mining tenure before it could be mined. Mining the larger resource would also need a site-specific environmental authority. The mining lease expires on 30 November 2030 and must be renewed for any life beyond that date (ASX announcement, 9 November 2026).

Measured Group also calculated that 29.94 million tonnes of the resource could in theory be blended to the AusPozz feed specification. About 12.4 per cent of that is Inferred, and about 43 per cent comes from the bauxitic and sandy layers, which were not part of the feed in the 2025 study. Zeotech states that the figure is not an Ore Reserve or a production target and that there is no certainty it will be realised (ASX announcement, 9 November 2026).

AusPozz and the 2025 study

Zeotech published a preliminary feasibility study for AusPozz on 24 June 2025. Its costs were estimated to an accuracy of plus or minus 25 per cent. It assumed a 20-year project shipping 151,000 tonnes of kaolin a year, with one plant at the Port of Bundaberg making 300,000 tonnes of AusPozz a year from the fourth year. Initial capital was A$114.8 million, including A$11.6 million of contingency. The all-in sustaining cost, the study's full cost of making a tonne, was A$224.80 a dry tonne for bulk AusPozz. The study assumed an average AusPozz sale price of A$403 a dry tonne (ASX announcement, 24 June 2025).

The production target in the study rests only on Measured and Indicated resources. The company says the study is not advanced enough to support an Ore Reserve, and that there is no certainty the production target or the economic assessment will be realised. A definitive feasibility study, the more detailed study that follows, is required before the company can give assurance of an economic development case. The study says early cash from kaolin shipments would cut the funding likely to be needed to about A$95 million, including working capital. There is no certainty it can be raised when needed (ASX announcement, 24 June 2025).

A presentation of 22 July 2026 listed engaging the main engineering group for the definitive study as a next step. No definitive study result or decision to build had been announced at 19 November 2026 (ASX announcement list, read 19 November 2026).

Zeotech reported that a commercial-scale production trial began after about 800 tonnes of Toondoon kaolin was delivered in July 2026 for calcining, the heating step (quarterly report, lodged 26 October 2026). An independent review by engineering firm BG&E of about 12 months of concrete trials found consistently higher strength in mixes containing AusPozz than in control mixes, according to Zeotech (ASX announcement, 25 November 2025).

Zeotech signed non-binding memorandums of understanding with Laing O'Rourke and Cement Australia in 2025 and with icubed Consulting, VINCI Construction and Sunstate Cement in 2026. One with Holcim Australia was extended to 1 March 2027. Each covers trials or technical assessment of AusPozz. The Cement Australia agreement had an expiry date of 1 June 2026 (ASX announcements, 24 September and 14 October 2025, and 14 January, 16 March, 13 August and 21 October 2026).

Kaolin offtake, the methane trial and funding

Zeotech announced a binding offtake agreement with Jiangsu Mineral Sources International Trading (MSI) on 15 September 2025. It covers 950,000 tonnes of kaolin over five years. Zeotech valued it at about A$204 million on committed volumes and first-year prices in that announcement, and at up to A$200 million in its annual report (lodged 21 September 2026). Prices from the second year are negotiated annually. Deliveries are conditional on Zeotech reaching financial close and holding every approval needed to start commercial mining. Zeotech had to notify MSI by 31 March 2026 that the approvals condition was met, with 90 more days for processing delays, or the agreement would end (ASX announcement, 15 September 2025).

Amendments reported on 6 July 2026 extended the agreement term to 30 April 2027 (ASX announcement, 6 July 2026). A cultural heritage agreement with the Auburn Hawkwood People was still being negotiated in the September 2026 quarter (quarterly report, lodged 26 October 2026).

The landfill trial ran for six months at the Mundubbera waste facility with Griffith University. Average methane emissions from four treated cells were 92 per cent lower than from four untreated cells. Griffith noted that landfill emissions vary naturally and recommended a longer monitoring period (ASX announcement, 25 August 2026).

Zeotech had no receipts from customers in the September 2026 quarter and used A$1.94 million in operations. At that rate the Appendix 5B gives 3.41 quarters of funding (Appendix 5B, lodged 26 October 2026). The loss for the year to 30 June 2026 was A$8.15 million. The accounts were prepared on a going concern basis, and the directors recognise that more funding may be needed to continue operations for the next twelve months. Total liabilities were A$1.36 million and net assets A$17.92 million at 30 June 2026 (annual report, lodged 21 September 2026).

At the annual general meeting on 12 November 2026 a special resolution to let Zeotech issue a further 10 per cent of its shares without shareholder approval needed 75 per cent of votes, received 72.96 per cent and was not carried. Votes against the remuneration report were 29.65 per cent. The other two resolutions were carried (results of meeting, lodged 12 November 2026, and notice of meeting, lodged 13 October 2026).

Every Samso piece on Zeotech

4 published pieces as at 19 November 2026, grouped by Samso product. Newest first in each group. Dates are Perth dates.

Samso Insights

Samso News

Questions people ask about Zeotech (ASX ZEO)

What does Zeotech do? Zeotech owns kaolin clay deposits in Queensland. It plans to export kaolin and to make AusPozz, a cement replacement for concrete. The company was called Metalsearch Limited (ASX: MSE) until 2 December 2020 (ASX code change list).

What is the Zeotech share price? The ASX website shows the ZEO share price. This page lists Samso's coverage and has no live price.

What is the latest announcement from Zeotech? As at 19 November 2026 the newest item on the ASX list was the results of the annual general meeting, lodged on 12 November 2026.

Is Zeotech in production? Zeotech reported no production or development activities in the September 2026 quarter. It reported that an AusPozz production trial, which it describes as commercial-scale, was under way in that quarter (quarterly report and Appendix 5B, lodged 26 October 2026).

Is Zeotech worth looking at? This page gives no buy, sell or hold call, price target or valuation. The Toondoon Mineral Resource is 45.6 million tonnes. Zeotech puts about 80 per cent of it in the Measured or Indicated categories, and no Ore Reserve has been declared (ASX announcement, 9 November 2026). The 2025 study put initial capital at A$114.8 million, and no definitive study result or decision to build had been announced at 19 November 2026. The MSI kaolin offtake is binding and conditional on financial close and mining approvals. The AusPozz agreements with cement and construction groups are non-binding. Cash was A$6.6 million at 30 September 2026. Samso had published no research workup on Zeotech at 19 November 2026.

Disclosure

Samso holds no shares in Zeotech at 17 November 2026.

This page is general information only.

Depth over hype.

Samso company research pages are independent research commentary for general information only. Nothing on this page is financial product advice, and it does not take into account any reader's objectives, financial situation or needs. Figures are drawn from public sources believed reliable at the stated dates but are not guaranteed, and market-sensitive numbers change daily. Samso or associated parties may hold positions in, or have commercial arrangements with, companies mentioned. Seek professional advice before making investment decisions. © Samso 2026, samso.com.au

Page last reviewed 19 November 2026.