Thor Energy PLC (ASX: THR) explores in South Australia for helium and natural hydrogen, which is hydrogen gas that forms underground in rock. It was called Thor Mining PLC until January 2023 (ASX announcement, 18 January 2023). Thor is a United Kingdom company whose shares also trade on London's AIM market. It listed on the ASX on 27 September 2006 (ASX company page). The main project is HY-Range, held through an 80.2 per cent stake in Go Exploration Pty Ltd. Thor also has 80 per cent of the oxide copper and gold at Alford East (annual report, lodged 30 September 2026). It held A$3.0 million in cash at 30 September 2026 (Appendix 5B, lodged 29 October 2026). Samso published four interviews with the company between February 2021 and May 2022, when it was a metals explorer called Thor Mining. They predate the HY-Range project.

ASX code: THR. Full legal name: Thor Energy PLC. Managing Director and Chief Executive: Andrew Hume. Alastair Clayton is the non-executive chairman. The other directors are Tim Armstrong and Lincoln Moore, both non-executive (annual report, lodged 30 September 2026). Thor held A$3.0 million in cash at 30 September 2026. The quarterly cash flow report lists no loan facilities (Appendix 5B, lodged 29 October 2026).

Thor Energy was called Thor Mining PLC until January 2023, and the ASX code stayed THR (ASX announcement, 18 January 2023). It is a United Kingdom company. Its shares trade on London's AIM market and on the ASX (annual report, lodged 30 September 2026).

Thor Energy projects

Thor has one main project, HY-Range, where it explores for natural hydrogen and helium, and several smaller interests. All are at the exploration stage. Natural hydrogen is hydrogen gas that forms underground in rock. Explorers look for places where it has collected, in the way they look for natural gas.

  • HY-Range Project, north of Adelaide in South Australia (ASX announcement, 9 June 2026). Natural hydrogen and helium. The licence, RSEL 802, covers 6,332 square kilometres and is held by Go Exploration, in which Thor owns 80.2 per cent (quarterly report, lodged 29 October 2026). Thor applied on 16 June 2025 to renew RSEL 802 for its final five-year term. At 29 September 2026 the application was under review and the licence continued by default. The directors say work commitments were met and they have a reasonable expectation of renewal. The auditor notes that the project's book value may be impaired if it is not granted (annual report, lodged 30 September 2026).
  • Otway Basin applications RSELA 810 and 811, in south-eastern South Australia. Thor and H2EX Ltd applied together on a 50:50 basis and were selected in February 2026. The company says the applications must pass through standard permitting before licences are granted (ASX announcement, 20 February 2026).
  • Alford East Copper-Gold Project, on the Yorke Peninsula in South Australia. Thor is the operator and holds 80 per cent of the oxide material, the weathered rock near surface, in licence EL 6529 (annual report, lodged 30 September 2026). The deposit has an Inferred Mineral Resource of 125.6 million tonnes at 0.14 per cent copper and 0.018 grams of gold per tonne as at 22 January 2021. Inferred is the lowest of the three confidence levels in the JORC Code, the Australasian reporting code. The estimate counts oxide material above a cut-off grade of 0.05 per cent copper, which the announcement ties to an assumed in-situ recovery method, where a solution is pumped through the rock to dissolve the copper (ASX announcement, 27 January 2021).
  • EnviroCopper Limited, a copper company with the Kapunda and Alford West projects in South Australia. Thor held just over 24 per cent at 30 June 2026 (annual report, lodged 30 September 2026). An ASX announcement of 3 March 2026 gave the holding as 20 per cent. An investor put in A$3.5 million in October 2025 and can convert it into shares, which the annual report says would take Thor to about 20 per cent.
  • Uranium and vanadium claims in Colorado and Utah, United States. Thor sold 75 per cent to Metals One PLC in August 2025 and granted it a 12-month option over the rest (annual report, lodged 30 September 2026). Thor held 25 per cent at 30 September 2026 (quarterly report, lodged 29 October 2026).

The HY-Range hydrogen and helium project

Thor bought its 80.2 per cent of Go Exploration in February 2025 by issuing 466,462,584 shares (ASX announcement, 17 February 2025). An independent firm, RISC Advisory, then estimated a prospective resource for the licence as at 29 March 2025. A prospective resource is an estimate of gas that might be recovered from accumulations that have not yet been discovered.

Thor's net share of the best estimate, after a 2 per cent royalty and the minority interest in Go Exploration, is 842 billion cubic feet of hydrogen and 90 billion cubic feet of helium. The low estimates are 221 and 20, and the high estimates are 2,816 and 343. All are unrisked, which means they are not reduced for the chance that no gas is found.

The announcement carries this cautionary statement: "The estimated quantities of hydrogen and helium that may potentially be recovered by the application of a future development project(s) relate to undiscovered accumulations. These estimates have both a risk of discovery and a risk of development. Further exploration appraisal and evaluation is required to determine the existence of a significant quantity of potentially recoverable hydrogen and helium." (ASX announcement, 31 March 2025).

The announcement puts the geological chance of success, the chance that exploration finds gas, at between 6 and 9 per cent. It says that is consistent with "a moderate value for risk in basins at this current level of subsurface understanding" (ASX announcement, 31 March 2025).

Two soil gas surveys have followed. These measure gas in the soil in parts per million, shortened to ppm. Phase 1 sampled 103 locations across the licence. Hydrogen reached 3,000 ppm at one site against a background of about 0.5 ppm, and helium reached 27 ppm against a background of about 5 ppm (annual report, lodged 30 September 2026). In Phase 2 the highest reading was 3 per cent hydrogen, or 30,000 ppm, at one location. Thor describes the Phase 2 results as preliminary and says they may be revised (ASX announcement, 9 June 2026). Soil gas readings help an explorer choose where to look next. They do not measure how much gas is underground or whether any is trapped.

The next step is a 2D seismic survey, which sends sound waves into the ground and records the echoes to build a picture of the rock layers. Thor signed a Letter of Award with the contractor Velseis Pty Ltd for about 464 line-kilometres, to help choose drilling targets (ASX announcement, 24 June 2026).

The survey needs an environmental approval, called a Statement of Environmental Objectives, from the state's Department of Energy and Mining. At 29 October 2026 public consultation was still running, and the managing director said the survey would most likely take place late in the first quarter or early in the second quarter of 2027. The company says it is funded to carry out the survey without immediate recourse to equity markets (quarterly report, lodged 29 October 2026). Drilling has not started at HY-Range.

Thor Energy cash and funding

Thor spent A$468,000 on operations in the September 2026 quarter, of which A$61,000 was exploration. The Appendix 5B divides the cash by that quarterly figure and gives 6.4 quarters of funding (Appendix 5B, lodged 29 October 2026).

Thor sold its 75 per cent interest in the Molyhil tungsten joint venture in the Northern Territory to Tivan Limited, and the sale completed on 19 January 2026. Thor's share of the price is A$6,562,500. The first of three yearly instalments of A$1,312,500 arrived in September 2026, half in cash and half in Tivan shares. The other two are due in September 2027 and September 2028. Tivan can pay up to half of each in Tivan shares (ASX announcement, 15 September 2026, and annual report, lodged 30 September 2026).

The annual accounts are in pounds sterling. At 30 June 2026 Thor had total liabilities of £143,000 against cash of £1,453,000 and net assets of £8,473,000. The loss for the year was £1,427,000 (annual report, lodged 30 September 2026).

The directors' forecast for the 12 months to 30 September 2027 shows negative cash flow, and they say funds need to be raised in that period. They expect to raise them, based on Thor's history of raising funds, and say there can be no certainty that a raising will complete. They add that some costs can be reduced and that the Tivan instalments were taken into account. The accounts say these conditions indicate a material uncertainty that may cast significant doubt on the group's ability to continue as a going concern. The auditor, PKF Littlejohn, drew attention to it and did not modify its opinion (annual report, lodged 30 September 2026).

The notice of meeting lodged on 9 November 2026 set the annual general meeting for 2 December 2026 in London.

Every Samso piece on Thor Energy

4 published pieces as at 19 November 2026, grouped by Samso product. Newest first in each group. Dates are Perth dates. All four are interviews published between February 2021 and May 2022, when the company was a metals explorer called Thor Mining. They predate the HY-Range project, which Thor bought into in February 2025.

Coffee with Samso

Rooster Talk

Videos on YouTube

The interviews covered copper in South Australia, Molyhil, uranium and the Ragged Range project in Western Australia. Alford East and the EnviroCopper holding are still in the portfolio.

Questions people ask about Thor Energy (ASX THR)

What does Thor Energy do? Thor Energy, formerly Thor Mining (ASX: THR), explores for natural hydrogen and helium in South Australia. Its main project is HY-Range, north of Adelaide. It also has copper interests in South Australia and 25 per cent of uranium and vanadium claims in the United States.

What is the Thor Energy share price? The ASX website shows the THR share price. This page lists Samso's coverage and has no live price.

What is the latest announcement from Thor Energy? As at 19 November 2026 the most recent announcement was the notice of annual general meeting, lodged on 9 November 2026. The ASX lists the newest ones.

Does Thor Energy have a resource at HY-Range? Thor has a prospective resource, estimated by RISC Advisory as at 29 March 2025. It relates to gas accumulations that have not yet been discovered. The figures and the cautionary statement are in the HY-Range section of this page.

Is Thor Energy worth looking at? This page gives no buy, sell or hold call, price target or valuation. HY-Range has a prospective resource estimate, and soil gas surveys recorded hydrogen at up to 3 per cent at one location. The company describes those results as preliminary. A seismic survey is the next step and drilling has not started. Thor held A$3.0 million in cash at 30 September 2026 with no loan facilities listed. The 2026 annual report records a material uncertainty about going concern, and the directors expect to raise further funds. Samso had published no research workup on Thor Energy at 19 November 2026. The most recent Samso piece is the Rooster Talk interview of 9 May 2022, which predates the HY-Range project.

Disclosure

Samso holds no shares in Thor Energy at 17 November 2026.

This page is general information only.

Depth over hype.

Samso company research pages are independent research commentary for general information only. Nothing on this page is financial product advice, and it does not take into account any reader's objectives, financial situation or needs. Figures are drawn from public sources believed reliable at the stated dates but are not guaranteed, and market-sensitive numbers change daily. Samso or associated parties may hold positions in, or have commercial arrangements with, companies mentioned. Seek professional advice before making investment decisions. © Samso 2026, samso.com.au