
INDEPENDENT RESEARCH MEDIA HOUSE FOR THE ASX. DEPTH OVER HYPE.
Riversgold (ASX RGL), Research and Coverage
Riversgold Ltd (ASX: RGL) is a gold and copper explorer that listed on 10 October 2017 (ASX company page). Its main project is Northern Zone, 25 kilometres east of Kalgoorlie in Western Australia, where it holds 80 per cent of a mining lease granted in July 2026. Under an agreement signed on 30 September 2025, MEGA Resources is to pay the full cost of developing and mining it for half the profit. The agreement has conditions still to meet, and three approvals were outstanding at 30 October 2026. Riversgold held A$465,000 in cash at 30 September 2026 (Appendix 5B, lodged 30 October 2026) and announced a A$1.55 million placement on 6 November 2026. Samso published four interviews with the company between October 2022 and September 2023.
ASX code: RGL. Full legal name: Riversgold Ltd. Executive Chairman: David Lenigas. The other directors are Simon Andrew and Ed Mead, and the company secretary is Oonagh Malone (annual report, lodged 30 October 2026). Riversgold held A$465,000 in cash at 30 September 2026. The quarterly cash flow report lists no loan facilities (Appendix 5B, lodged 30 October 2026). Riversgold has since announced a share placement to raise A$1.55 million before costs (ASX announcement, 6 November 2026).
Riversgold projects
Riversgold's main project is Northern Zone near Kalgoorlie, where it is seeking the approvals needed to mine. It has three other project areas at an earlier stage.
- Kalgoorlie Gold Project (Northern Zone), about 25 kilometres east of Kalgoorlie in Western Australia. Gold. Riversgold holds 80 per cent of the mining lease and Oracle Power Plc, a UK-listed company, holds 20 per cent. The lease was granted in July 2026 for 21 years (annual report and quarterly report, both lodged 30 October 2026).
- Saint John Project, New Brunswick, Canada. Copper, gold, silver and antimony. The tenement schedule shows Riversgold's interest as an option to acquire 100 per cent of five claims. A.I.S. Resources, a Canadian-listed company, can earn up to 75 per cent by funding exploration. A.I.S. completed a first diamond drilling program in the September 2026 quarter, and assays, the laboratory results, were pending (quarterly report, lodged 30 October 2026).
- Tambourah Project, about 160 kilometres south-east of Port Hedland in the Pilbara. Copper and gold. Riversgold owns 100 per cent of granted tenements covering about 110 square kilometres. A surface sampling program began in late October 2026 (quarterly report, lodged 30 October 2026).
- Wodgina East, beside the Wodgina lithium mine in the Pilbara. Iron ore. Riversgold owns 100 per cent of one granted licence, where Riversgold reports possible iron deposits from early mapping (quarterly report, lodged 30 October 2026).
Northern Zone and the mining agreement
Riversgold describes Northern Zone as gold held in a porphyry, a body of rock that formed from molten material below the surface. It says the better grades sit in flat-lying quartz zones inside that body, and that more drilling is needed to find the limits. Grade is the amount of gold in the rock, given in grams per tonne (quarterly report, lodged 30 October 2026).
Under an agreement signed on 30 September 2025, MEGA Resources, a Western Australian mining services company, is to pay all the costs of developing and mining Northern Zone. MEGA takes half of any profit and the two owners share the other half. MEGA's funding is repayable only from project revenue, and the ore is to be sold to a third-party processor (ASX announcement, 30 September 2025). The agreement still depends on a formal mining services agreement and on regulatory approvals (annual report, lodged 30 October 2026). It has been extended to 30 September 2027 (ASX announcement, 1 October 2026).
Three approvals were outstanding at 30 October 2026. The first is the Mine Development and Closure Proposal, the main operating approval for a mine in Western Australia, which has been lodged. The proposal covers a starter open pit, a mine dug from the surface, in the weathered and partly weathered rock. The second is a permit to clear native vegetation, lodged on 28 August 2026. The third is the grant of two haul road licences, where the company says all objections are resolved (quarterly report, lodged 30 October 2026, and ASX announcement, 1 October 2026). No grant of any of the three had been announced at 19 November 2026.
The annual report lodged on 30 October 2026 gives no Mineral Resource for Northern Zone or any other Riversgold project. A Mineral Resource is an estimate of the material in the ground that has reasonable prospects of eventual economic extraction, reported under the JORC Code, the Australasian reporting code. In February 2026 the company said it would keep building its understanding of the project before a first estimate (ASX announcement, 25 February 2026). The annual report lists resource definition drilling among its future work. Neither it nor the September 2026 quarterly report names a processor for Northern Zone ore or gives a mining study for the planned pit.
Riversgold has an Exploration Target of 200 to 250 million tonnes at 0.4 to 0.6 grams of gold per tonne, or 2.5 to 4.8 million ounces. It was first announced on 9 May 2023, at a zero cut-off grade (no minimum grade applied), and restated on 30 September 2025. An Exploration Target is conceptual. Riversgold's statement says there has been insufficient exploration to estimate a Mineral Resource and that it is uncertain further exploration will result in one. The target rests on 53 historical drill holes and seven drilled by Oracle in 2021 (ASX announcements, 9 May 2023 and 30 September 2025).
Northern Zone drilling and test work
Riversgold's latest Northern Zone results came from 31 aircore holes drilled in February 2026. Aircore uses a blade bit and compressed air to sample soft, weathered rock. The results included 15 metres at 5.62 grams per tonne and 8 metres at 9.90 grams, both from 48 metres. Most of the gold in each came from a single metre, which assayed 68.12 grams in the first and 71 grams in the second. Lower results included 10 metres at 1.15 grams and 3 metres at 0.76 grams. Nine holes in the results table returned no significant gold interval (ASX announcement, 15 April 2026). The holes were vertical and Riversgold says the gold zones are flat-lying, so these lengths are close to true width (quarterly report, lodged 30 October 2026).
Laboratory tests on five samples of oxide, the weathered rock near surface, recovered between 90.64 and 94.7 per cent of the gold. Riversgold describes the method as a 24-hour cyanide bottle roll, a laboratory test that leaches a ground sample in cyanide and measures the gold dissolved. Two of the five samples were a composite from one drill hole and its duplicate (ASX announcement, 20 May 2025).
Riversgold cash and funding
Riversgold spent a net A$741,000 on operations in the September 2026 quarter, of which A$321,000 went on exploration. The Appendix 5B divides the quarter-end cash by that spending and gives 0.63 quarters of funding. In the same form the company says it expects spending to fall now that its Northern Zone drilling programs have concluded. It says directors and management had committed A$233,000, subject to shareholder approval on 27 November 2026, and that it may raise further funds and can adjust its exploration spending to its budget (Appendix 5B, lodged 30 October 2026).
The auditor's report, signed on 30 September 2026, draws attention to a material uncertainty about the company's ability to continue as a going concern. The audit opinion is not modified. The accounts say the 12-month cash forecast assumes more capital is raised from share issues or asset sales. The directors say that if the full amount is not raised they are confident they can reduce spending and still meet the minimum exploration requirements on the tenements (annual report, lodged 30 October 2026).
Riversgold announced on 4 November 2026 that it had agreed to buy an exploration licence of about 12 square kilometres from a subsidiary of Black Cat Syndicate. The licence surrounds the mining lease on three sides. The price is A$1.0 million in cash and 111,111,111 Riversgold shares, plus a 1 per cent net smelter return royalty, a share of the revenue from any metal mined there. Riversgold also takes on an existing 1 per cent royalty. The cash payment is not conditional on Riversgold completing a financing. Completion is due within three months of signing, with a possible one-month extension, and needs the existing royalty holder's consent (ASX announcement, 4 November 2026).
The placement announced on 6 November 2026 is priced at A$0.006 a share and comes in two tranches. The first, 214,348,286 shares, was issued on 13 November 2026 (application for quotation, lodged 13 November 2026). The announcement says the funds will be used for the Black Cat licence purchase (ASX announcement, 6 November 2026). The second tranche, 43,985,047 shares, was subject to shareholder approval at the annual general meeting set for 27 November 2026. The addendum to the notice of meeting also adds exploration and working capital to the use of funds (lodged 9 November 2026).
Every Samso piece on Riversgold
4 published pieces as at 19 November 2026, grouped by Samso product. Newest first in each group. Dates are Perth dates.
Coffee with Samso
- 6 Sep 2023, A Forgotten Gold Porphyry System in Kalgoorlie - Riversgold Limited.
- 29 Mar 2023, Riversgold Limited (ASX: RGL) is Exploring for Lithium
- 19 Oct 2022, Riversgold Limited (ASX: RGL) - Vectoring into the next Lithium Discovery.
Rooster Talk
- 8 Nov 2022, Riversgold Limited (ASX: RGL) - Significant Lithium Mineralisation at Tambourah Project.
Videos on YouTube
- 6 Sep 2023, A Forgotten Gold Porphyry System in Kalgoorlie - Riversgold Limited.
- 29 Mar 2023, Riversgold Limited (ASX: RGL) is Exploring for Lithium
- 8 Nov 2022, Riversgold Limited (ASX: RGL) - Significant Lithium Mineralisation at Tambourah Project.
- 19 Oct 2022, Riversgold Limited (ASX: RGL) - Vectoring into the next Lithium Discovery.
All four pieces are interviews with Julian Ford, who was chief executive at the time. The three from October 2022 to March 2023 cover lithium exploration, mainly at Tambourah. The September 2023 interview covers Northern Zone soon after Riversgold agreed to earn an interest in it, when assays from a diamond drilling program were awaited. The company's focus has since moved to gold at Northern Zone. The 80 per cent ownership, the MEGA Resources agreement and the mining lease all came after the last interview.
Questions people ask about Riversgold (ASX RGL)
What does Riversgold do? It explores for gold and copper. Its main project is Northern Zone, 25 kilometres east of Kalgoorlie, where it holds 80 per cent of a mining lease and has a partner, MEGA Resources, that is to fund and carry out mining. It also has projects in the Pilbara and in New Brunswick, Canada.
What is the Riversgold share price? The ASX website shows the RGL share price. This page lists Samso's coverage and has no live price.
What is the latest announcement from Riversgold? As at 19 November 2026 the most recent announcements were lodged on 13 November 2026. The most recent project announcement, lodged on 4 November 2026, was the agreement to buy the Black Cat licence.
Does Riversgold have a Mineral Resource? The annual report lodged on 30 October 2026 gives none for any of its projects. The company's plan for a first estimate and its Exploration Target are described above.
Is Riversgold worth looking at? This page gives no buy, sell or hold call, price target or valuation. Riversgold has a granted mining lease at Northern Zone and an agreement, still subject to conditions, under which MEGA Resources is to pay the mining costs. Three approvals were outstanding at 30 October 2026. The drilling results, cash and November placement are set out above. Samso had published no research workup on Riversgold at 19 November 2026. The most recent Samso piece is the Coffee with Samso interview of 6 September 2023.
Disclosure
Samso holds no shares in Riversgold at 17 November 2026.
This page is general information only.
Depth over hype.
Samso company research pages are independent research commentary for general information only. Nothing on this page is financial product advice, and it does not take into account any reader's objectives, financial situation or needs. Figures are drawn from public sources believed reliable at the stated dates but are not guaranteed, and market-sensitive numbers change daily. Samso or associated parties may hold positions in, or have commercial arrangements with, companies mentioned. Seek professional advice before making investment decisions. © Samso 2026, samso.com.au
Page last reviewed 19 November 2026.