QMines Limited (ASX: QML) is a Queensland copper and gold company. It owns 100 per cent of the historic Mt Chalmers mine about 17 kilometres north-east of Rockhampton, and the Develin Creek and Mount Mackenzie projects (ASX announcement, 9 November 2026). Mt Chalmers has an Ore Reserve of 9.6 million tonnes at 0.65% copper and 0.48 grams per tonne gold from the April 2024 Pre-Feasibility Study (quarterly report, lodged 26 October 2026). A Definitive Feasibility Study is under way. Cash was A$10.7 million at 30 September 2026 (Appendix 5B, lodged 26 October 2026). QMines then raised A$5.5 million before costs in a placement (ASX announcement, 3 November 2026). Samso had published 3 pieces on the company at 19 November 2026.

ASX code: QML. Full legal name: QMines Limited. Executive Chairman and Managing Director: Andrew Sparke. The other directors are Peter Caristo, executive director, and Elissa Hansen, non-executive director and company secretary (annual report, lodged 30 September 2026). The quarterly cash flow report lists no loan facilities (quarterly report and Appendix 5B, lodged 26 October 2026).

QMines projects

QMines is working to restart mining at Mt Chalmers, near Rockhampton in Central Queensland, and is drilling there and at nearby deposits. It also owns Develin Creek and Mount Mackenzie. The company plans to assess them as later sources of ore for a central processing plant at Mt Chalmers (annual report, lodged 30 September 2026).

A Mineral Resource is a company's estimate of the metal in the ground that has reasonable prospects of eventual economic extraction. It is reported under the JORC Code, the Australasian reporting code, as tonnes of rock and grade. Grade is the amount of metal in the rock, in per cent for copper and zinc and in grams per tonne (g/t) for gold and silver. The code has three confidence categories. Measured is the highest, then Indicated, then Inferred, where drill holes are furthest apart. An Ore Reserve is the part of a Measured or Indicated resource that a study has shown can be mined economically. Its categories are Proved and Probable. A cut-off is the lowest grade counted in an estimate.

  • Mt Chalmers Copper-Gold Project, about 17 kilometres north-east of Rockhampton. Copper, gold, zinc and silver. 100 per cent owned. The mine produced 1.2 million tonnes at 2.0% copper and 3.6 g/t gold between 1898 and 1982 (ASX announcement, 9 November 2026). The March 2024 Mineral Resource is 11.3 million tonnes at 0.75% copper and 0.42 g/t gold above a 0.3% copper cut-off. Of that, 4.2 million tonnes are Measured, 5.8 million Indicated and 1.3 million Inferred. The resource includes the Ore Reserve. The April 2024 study's Table 4 gives the reserve as 9.6 million tonnes at 0.65% copper and 0.48 g/t gold, with 5.1 million tonnes Proved and 4.5 million Probable. Its Table 3 gives 9.57 million tonnes at 0.63% copper (ASX announcement, 30 April 2024, page 5).
  • Woods Shaft, about 700 to 800 metres south-west of the Mt Chalmers pit. Copper and gold. An Inferred Mineral Resource of 0.54 million tonnes at 0.50% copper and 0.95 g/t gold above a 0.3% copper cut-off, from November 2022. It is not in the mine plan (quarterly report, lodged 26 October 2026).
  • Botos, next to Mt Chalmers. Gold, zinc and copper. QMines reports an Exploration Target of 1.5 to 2.5 million tonnes at 0.5 to 0.8 g/t gold, 0.1 to 0.2% copper and 1.1 to 1.4% zinc. An Exploration Target is a range for ground not yet drilled enough to estimate a resource. It is conceptual, and it is uncertain whether further exploration will result in a Mineral Resource (ASX announcement, 18 September 2026). Drilling began on 9 September 2026 (quarterly report, lodged 26 October 2026).
  • Develin Creek, about 90 kilometres north-west of Rockhampton. Copper and zinc. 100 per cent owned. The Mineral Resource is 4.70 million tonnes at 0.94% copper, 1.00% zinc, 0.15 g/t gold and 5.7 g/t silver above a 0.30% copper cut-off. Of that, 4.22 million tonnes are Indicated (ASX announcement, 23 February 2026). It is not in the mine plan (quarterly report, lodged 26 October 2026).
  • Mount Mackenzie, about 120 kilometres north-west of Mt Chalmers. Gold and silver. 100 per cent owned. The Mineral Resource announced on 5 August 2026 is 5.22 million tonnes at 1.01 g/t gold and 6.7 g/t silver above a 0.4 g/t gold cut-off, for about 170,000 ounces of gold. Of that, 3.77 million tonnes are Indicated and 1.45 million Inferred. No Ore Reserve estimate has been completed (quarterly report, lodged 26 October 2026).

The Mt Chalmers study and approvals

QMines published a Pre-Feasibility Study (PFS) for Mt Chalmers on 30 April 2024. It plans a three-stage open pit, a mine dug from the surface, feeding a plant of one million tonnes a year over 10.4 years. The plant would crush and grind the ore and use flotation, where air bubbles lift the metal-bearing minerals into a concentrate for sale. It would make copper-gold, zinc-silver and pyrite-gold concentrates. Pyrite is an iron sulphide mineral that carries some of the gold (ASX announcement, 30 April 2024).

The study's summary table gives capital costs of A$191.9 million. Its technical appendix, JORC Table 1, lists A$165 million as the capital input to the economic analysis. The study states costs to an accuracy of plus or minus 25%. The plant estimate includes a 10% contingency, an allowance for costs not yet defined. Sustaining capital, the spending to keep the operation running over its life, is not included. About A$10.4 million for first fills and spares, the materials and parts needed to start the plant, sits outside the capital cost. The company plans to fund it from equity as working capital (ASX announcement, 30 April 2024).

The financial model assumes April 2024 spot prices of US$9,850 a tonne for copper and US$2,350 an ounce for gold. The Ore Reserve was estimated at a lower copper price of US$9,210 a tonne.

Recovery is the share of each metal the plant is expected to capture. The study assumes 96.4% of the copper and 81.1% of the gold report to its three concentrates combined. These rest on test work from 2021 to 2023 on core from two drill holes. The study says this work tested each ore type on its own and in blends. There has been no bulk sample or pilot plant test (ASX announcement, 30 April 2024). Crushing, grinding and flotation tests for the Definitive Feasibility Study (DFS) are under way at ALS Burnie (quarterly report, lodged 26 October 2026).

The production target, the tonnes the study plans to mine and process, is about 91% Measured and Indicated material and about 9% Inferred. The company cautions that Inferred material has lower geological confidence and there is no certainty the production target will be achieved. It says the Inferred material is not what determines the project's viability. It also says funding of about A$191 million will likely be required, with no certainty it can be raised (ASX announcement, 30 April 2024).

QMines adopted a single-asset development at Mt Chalmers as the DFS base case in January 2026. It began the DFS in February 2026 (annual report, lodged 30 September 2026). In June 2026 it said it was targeting DFS completion by the end of the year (ASX announcement, 1 June 2026). The same release said AMC Consultants had been engaged to prepare an updated Mt Chalmers resource (ASX announcement, 1 June 2026).

QMines aims to submit an Environmental Authority application, the main Queensland environmental approval for a mine, in the first half of 2027 (ASX announcement, 9 November 2026). No decision to build had been announced at 19 November 2026.

QMines has agreed to buy two properties over Botos for A$2.388 million (ASX announcement, 18 September 2026). It has also exchanged binding contracts for 25 freehold parcels from the Woods family for A$5.5 million. The company says this land is the planned site for the processing plant, the tailings storage facility, which holds the ground rock left after processing, and a water dam, subject to design and approvals (ASX announcement, 9 November 2026).

Drilling at Mt Chalmers

QMines expanded its 2026 program at the Mt Chalmers hub to 129 holes for about 20,000 metres (quarterly report, lodged 26 October 2026). It uses diamond drilling, which cuts a solid core of rock, and reverse circulation (RC) drilling, which brings up rock chips. Some holes are drilled from a pontoon, a floating platform on the flooded pit. The company says this is the first drilling beneath the pit since 1982 (quarterly report, lodged 26 October 2026).

Metallurgical hole 26MCRD002, sited within known mineralisation to collect sample for DFS tests, returned 35 metres at 2.88% copper and 0.75 g/t gold from 107 metres (quarterly report, lodged 26 October 2026). Pontoon hole 26MCDD053 returned 30.47 metres at 1.24% copper and 0.87 g/t gold from 42.53 metres. The same release says five of eleven holes returned only narrow low-grade intervals or no significant intercepts. The results will be assessed in the resource update (ASX announcement, 29 October 2026). All of these are downhole lengths, measured along the hole. True widths, the actual thickness of the zones, are not yet known for either hole (ASX announcements, 18 August and 29 October 2026).

QMines cash and funding

QMines used A$2.87 million in operating activities in the September 2026 quarter. That included A$1.75 million on development and A$77,000 on exploration. The Appendix 5B divides the A$10.7 million in cash by that outflow and gives 3.73 quarters of funding (Appendix 5B, lodged 26 October 2026).

After the quarter QMines received firm commitments for a A$5.5 million placement at A$0.052 a share, including from the QIC-managed critical minerals fund. It also offered a A$1.0 million share purchase plan at the same price and kept the right to accept oversubscriptions (ASX announcements, 3 and 9 November 2026).

In April 2026 QIC's fund agreed to invest A$15 million. That was A$5 million for shares at A$0.0523 and A$10 million for a 2% net smelter return royalty with a defined cap. A net smelter return royalty is a share of sales revenue after smelting and refining charges. The April release says the fund will be granted security over the relevant project tenements, together with guarantees from QMines (ASX announcement, 20 April 2026).

At 30 June 2026 QMines had net current assets of A$13.5 million and net assets of A$37.4 million. The annual report says the ability to continue as a going concern depends most on obtaining additional funding. It records the A$10 million royalty funding under borrowings as a non-current "future royalty liability" (annual report, lodged 30 September 2026). The placement release says "The Company remains debt-free" (ASX announcement, 3 November 2026).

Every Samso piece on QMines

3 published pieces as at 19 November 2026, grouped by Samso product. Newest first in each group. Dates are Perth dates.

Samso Insights

Questions people ask about QMines (ASX QML)

What is the QMines share price? The ASX website shows the QML share price. This page lists Samso's coverage and has no live price.

What is the latest announcement from QMines? As at 19 November 2026 the most recent, lodged on 12 November 2026, was an addendum to the notice of the annual general meeting called for 23 November 2026. The ASX lists the newest ones.

Does QMines produce copper? Not yet. Mt Chalmers has an Ore Reserve and a 2024 PFS, and the DFS is under way. Mining lease ML 100403 was still an application at 30 September 2026 (quarterly report, lodged 26 October 2026).

Is QMines worth looking at? This page gives no buy, sell or hold call, price target or valuation. It sets out the company's projects and cash, each with its source document. Samso had published no research workup on QMines at 19 November 2026.

Disclosure

Samso holds no shares in QMines at 17 November 2026.

This page is general information only.

Depth over hype.

Samso company research pages are independent research commentary for general information only. Nothing on this page is financial product advice, and it does not take into account any reader's objectives, financial situation or needs. Figures are drawn from public sources believed reliable at the stated dates but are not guaranteed, and market-sensitive numbers change daily. Samso or associated parties may hold positions in, or have commercial arrangements with, companies mentioned. Seek professional advice before making investment decisions. © Samso 2026, samso.com.au