top of page

Meeka Metals (ASX MEK), Research and Coverage

meeka-metals-limited

Meeka Metals Limited (ASX: MEK) is a gold producer in Western Australia. It owns the Murchison Gold Project, about 50 kilometres north of Meekatharra (annual report, lodged 21 September 2026). First gold was poured on 1 July 2025, and the project produced 28,829 ounces in the year to 30 June 2026 (FY2026 results release, 21 September 2026). Open pit mining stopped in July 2026. In the September 2026 quarter most of the plant feed came from stockpiles, and the rest from the Andy Well underground mine. A second underground mine is being developed at Turnberry. In August 2026 Meeka completed the purchase of the Mt Holland gold deposits, 375 kilometres east of Perth (ASX announcement, 17 August 2026). It was called Meeka Gold Limited until July 2022 and Latitude Consolidated Limited (ASX: LCD) until December 2021 (ASX code change list).

ASX code: MEK. Full legal name: Meeka Metals Limited. Managing Director and CEO: Tim Davidson. The other directors are Paul Chapman, the non-executive chairman, and Roger Steinepreis, Paul Adams and Daniel Lougher, all non-executive (annual report, lodged 21 September 2026). Meeka held A$51.2 million in cash at 30 September 2026 (Appendix 5B, lodged 29 October 2026). It owed A$18.8 million in equipment loans at 30 June 2026, the latest balance published (annual report, lodged 21 September 2026). The company has no gold hedging and says it has no debt other than equipment finance (quarterly report, lodged 29 October 2026).

Meeka Metals projects

Meeka has one producing gold project and a second gold project at Mt Holland, both in Western Australia.

A Mineral Resource is a company's estimate of the material in the ground that has reasonable prospects of eventual economic extraction. It is stated as tonnes and grade, and grade is the amount of gold in each tonne of rock. The JORC Code, the Australasian reporting code, has three confidence categories. Measured is the highest. Indicated means the drill holes are close enough together to give reasonable confidence in the tonnes and the grade. Inferred is the lowest, where the drill holes are further apart. An Ore Reserve is the part of the Measured and Indicated resource that a study has shown can be mined at a profit. A reserve is either Proved or Probable, and Probable is the lower of the two.

  • Murchison Gold Project, about 50 kilometres north of Meekatharra. Gold. In production. Meeka owns 100 per cent. The Mineral Resource at 30 June 2026 is 12.94 million tonnes at 2.9 grams of gold per tonne, which contains 1,215,000 ounces. Of that, 55,000 ounces is Measured, 625,000 ounces is Indicated and 535,000 ounces is Inferred. The Ore Reserve is 3.93 million tonnes at 2.8 grams per tonne for 355,000 ounces, all of it Probable.
  • Mt Holland, 375 kilometres east of Perth in the Forrestania greenstone belt. Gold. Meeka reported a first Mineral Resource there on 16 September 2026. It plans to start drilling in January 2027 (ASX announcement, 17 August 2026). The Mineral Resource is 3.57 million tonnes at 2.4 grams per tonne for 270,000 ounces. Of that, 110,000 ounces is Indicated and 160,000 ounces is Inferred. It rests on historical drilling, and the Blue Vein deposit holds 250,000 of the ounces (ASX announcement, 16 September 2026). It has no Ore Reserve.

The resource and reserve figures are from the company's annual statement of 16 September 2026. The resources include the reserves. The company did not re-estimate the reserve. The changes from a year earlier are mining to 30 June 2026, the addition of 25,000 ounces held in stockpiles and the removal of the St Anne's open pit reserve. It was 400,000 ounces a year earlier.

The reserve was first reported in Meeka's Feasibility Study of 12 December 2024. A feasibility study is the most detailed study a mining project gets before it is built. That study planned gold sales of 544,000 ounces over 10 years at an all-in sustaining cost of A$1,946 an ounce, at a gold price of A$3,500 an ounce. The all-in sustaining cost is an industry measure of what it costs to produce each ounce and keep a mine running. It leaves out the cost of building or expanding the mine.

The company said 72 per cent of that production came from Measured and Indicated resources. It cautioned that there is no certainty the Inferred part will be converted or the target met (Feasibility Study, 12 December 2024, pages 1 and 2).

Murchison Gold Project, production and costs

Meeka poured its first gold at Murchison on 1 July 2025. In the year to 30 June 2026 it produced 28,829 ounces at an all-in sustaining cost of A$2,956 an ounce (FY2026 results release, 21 September 2026).

The company says production in the first half of that year tracked the study's start-up plan. It produced 7,148 ounces in the September 2025 quarter and 9,174 ounces in the December quarter, at costs of A$2,133 and A$2,365 an ounce. Production then fell to 6,083 ounces in the March 2026 quarter and 6,424 ounces in the June quarter, at A$4,146 and A$3,589 an ounce. Meeka put the lower production down to heavy rain and to its open pit contractor working more slowly than planned, which delayed access to higher grade ore. It says costs rose as production fell and the plant relied on lower grade stockpiles (annual report, lodged 21 September 2026).

Meeka stopped open pit mining, which is mining from the surface, in July 2026. It said the contractor problems, the stockpiles on surface and the growing supply of underground ore meant it no longer relied on the open pits to feed the processing plant (annual report, lodged 21 September 2026).

In the September 2026 quarter Murchison produced 7,237 ounces, up from 6,424 in the June quarter. The all-in sustaining cost was A$4,147 an ounce. The annual report gives A$3,589 for the June quarter and A$4,146 for the March quarter. Meeka sold 7,279 ounces at an average of A$6,063 an ounce. Growth capital, which is counted outside that measure, fell from A$17.5 million to A$4.9 million. The plant treated 149,462 tonnes at 1.6 grams per tonne and recovered 95 per cent of the gold. About 94,000 tonnes of the feed came from open pit stockpiles, 36,000 tonnes was high grade underground ore and 21,000 tonnes was lower grade ore dug while tunnelling underground (quarterly report, lodged 29 October 2026).

The September quarterly report, the FY2026 results release and the September 2026 presentation give no production or cost guidance figure for the year to 30 June 2027. The company expects underground ore from Andy Well to make up a growing share of the plant feed through the year (FY2026 results release, 21 September 2026).

Andy Well and Turnberry, the underground mines

Andy Well is the operating underground mine. Meeka began mining there in July 2025 (ASX announcement, 25 May 2026).

In the September 2026 quarter the mine delivered 39,514 tonnes of ore at 3.9 grams per tonne, up from 2.8 grams per tonne in the June quarter. The company reports 3.1 grams per tonne from the levels mined so far, against a reserve grade of 2.9 grams per tonne for those levels (quarterly report, lodged 29 October 2026).

Meeka has added an ore sorter in front of the plant. This machine scans crushed rock and sends the higher grade pieces to the plant. The company expects it to roughly double the grade of Andy Well ore reaching the plant (ASX announcement, 2 September 2026). Commissioning began in mid-October 2026 (quarterly report, lodged 29 October 2026).

Turnberry is about 20 kilometres from the plant. Meeka is building its second underground mine there through the Fairway decline, a sloping tunnel from the surface. Tunnelling began in early October 2026, and the company expects first ore in January 2027. The mine starts with a Probable Ore Reserve of 620,000 tonnes at 2.5 grams per tonne for 50,000 ounces (ASX announcement, 12 October 2026). The Turnberry underground Mineral Resource is 2.85 million tonnes at 3.9 grams per tonne for 360,000 ounces. Of that, 350,000 ounces is Inferred (annual statement, 16 September 2026). Inferred material cannot be counted in a reserve.

Meeka has drilled about 200 metres below the Turnberry reserve with diamond drilling, which cuts a solid core of rock. Results from nine holes, reported on 22 July 2026, included 52.3 metres at 3.0 grams per tonne from 474.1 metres down the hole. Other holes were lower. The longest intercept in hole 26TBRD007 was 13.3 metres at 0.6 grams per tonne. The announcement says most holes cross the gold zones at 30 to 40 degrees. That means the true thickness is less than the downhole length. This deeper drilling is not yet in the Turnberry Mineral Resource (annual statement, 16 September 2026).

Mt Holland purchase and the September 2026 placement

Meeka bought Mt Holland for A$20 million in cash and 117,804,881 shares. It paid A$10 million at completion in August 2026. The other A$10 million fell due on 13 November 2026, which is after the 30 September cash figure. Meeka took on a royalty of A$25 for each ounce of gold produced and sold from the Mt Holland tenements (ASX announcement, 17 August 2026). The quarterly report showed the tenement transfers as pending at 30 September 2026.

Meeka raised new money in September 2026 by placing 424 million shares with institutions at A$0.10 each. That is A$42.4 million before costs, and the company puts it at A$40 million after costs. The first tranche of about A$33 million settled in the September quarter. The second tranche of 94,184,164 shares, about A$9.4 million, needs shareholder approval at the annual general meeting on 24 November 2026 (notice of meeting, 23 October 2026). The company said the money would go to the deferred Mt Holland payment, the Turnberry decline, drilling and working capital (quarterly report, lodged 29 October 2026).

The cash flow report for the September 2026 quarter shows A$1.5 million of net cash from operating activities and A$10.0 million paid for Mt Holland (Appendix 5B, lodged 29 October 2026). Before the placement the company estimated its quarter-end cash at about A$21 million (ASX announcement, 25 September 2026). It held A$37.9 million at 30 June 2026 (FY2026 results release, 21 September 2026).

Every Samso piece on Meeka Metals

One published piece as at 17 November 2026.

Samso Research

The Samso Research workup was first published on 7 October 2026. Its share prices are at the ASX close on 16 October 2026. Meeka announced its placement and lodged its full September quarter report after that.

Questions people ask about Meeka Metals (ASX MEK)

What does Meeka Metals do? It mines gold at the Murchison Gold Project north of Meekatharra in Western Australia. It also holds the Mt Holland gold deposits east of Perth.

What is the Meeka Metals share price? The ASX website shows the MEK share price. This page lists Samso's coverage and has no live price.

What is the latest announcement from Meeka Metals? As at 17 November 2026 the most recent operating announcement was the September quarter report, lodged on 29 October 2026.

Is Meeka Metals profitable? Meeka reported a net profit after tax of A$51.3 million for the year to 30 June 2026, its first full year of production (FY2026 results release, 21 September 2026). It paid no dividend for that year (annual report, lodged 21 September 2026).

Is Meeka Metals worth looking at? This page gives no buy, sell or hold call, price target or valuation. Meeka is producing gold at Murchison and is building a second underground mine at Turnberry. In the September 2026 quarter its all-in sustaining cost was A$4,147 an ounce and it sold its gold at an average of A$6,063 an ounce (quarterly report, lodged 29 October 2026). The company has given no production or cost guidance figure for the year to 30 June 2027 in the documents read for this page. The Samso Research workup goes through the company in detail, with share prices at 16 October 2026.

Disclosure

Samso's research workup on Meeka Metals was first published on 7 October 2026. Its disclosure of interest is dated 15 September 2026. It says Samso did not speak with Meeka Metals management, and that the company did not commission the workup, pay for it or see it before publication. It says that at that date neither Samso nor its principals held securities in Meeka Metals and Samso had no commercial relationship with the company. This page does not update that statement. How Samso selects companies is set out in that disclosure.

This page is general information only.

Depth over hype.

Samso company research pages are independent research commentary for general information only. Nothing on this page is financial product advice, and it does not take into account any reader's objectives, financial situation or needs. Figures are drawn from public sources believed reliable at the stated dates but are not guaranteed, and market-sensitive numbers change daily. Samso or associated parties may hold positions in, or have commercial arrangements with, companies mentioned. Seek professional advice before making investment decisions. © Samso 2026, samso.com.au

Page last reviewed 17 November 2026.

bottom of page