
INDEPENDENT RESEARCH MEDIA HOUSE FOR THE ASX. DEPTH OVER HYPE.
Hot Chili (ASX HCH), Research and Coverage
Hot Chili Limited (ASX: HCH) is a copper developer in Chile. It listed on the ASX on 3 May 2010 (ASX company page) and also trades in Canada. Its main asset is the Costa Fuego Copper-Gold Project on Chile's coastal range, about 600 kilometres north of Santiago. Costa Fuego has an Indicated Mineral Resource of 798 million tonnes and, within it, a Probable Ore Reserve of 502 million tonnes (resource and reserve statement, lodged 29 September 2026). Hot Chili published a Pre-Feasibility Study on 27 March 2025 and has drilled the La Verde copper-gold discovery, 30 kilometres to the south. It reported cash of A$29.3 million at 30 September 2026 (quarterly report and Appendix 5B item 4.6, lodged 30 October 2026). Item 5.5 of the same form shows A$24.9 million. It has no mine in production. Samso had published six pieces on the company at 17 November 2026.
ASX code: HCH. Full legal name: Hot Chili Limited. Managing Director and Chief Executive Officer: Christian Easterday. The other directors are Stuart Mathews, the independent non-executive chairman, Roberto de Andraca Adriasola and Mark Jamieson, both non-executive directors, and Fiona Van Maanen, an independent non-executive director (annual report, lodged 29 September 2026). The quarterly cash flow report lists no loan facilities (Appendix 5B, lodged 30 October 2026).
Hot Chili projects
Hot Chili's deposits sit close together at 800 to 1,000 metres above sea level, about 600 kilometres north of Santiago (resource and reserve statement, lodged 29 September 2026).
A Mineral Resource is a company's estimate of the material in the ground that has reasonable prospects of eventual economic extraction. It is stated as tonnes and grade, the concentration of metal in the rock. The JORC Code, the Australasian reporting code, has three confidence categories. Indicated is the middle one and Inferred is the lowest. An Ore Reserve is the part of a resource that a study has shown can be mined economically.
- Costa Fuego Copper-Gold Project. Copper, gold, silver and molybdenum. It combines four deposits called Cortadera, Productora, Alice and San Antonio. Hot Chili owns 100 per cent of the subsidiary that controls Cortadera and San Antonio. Productora belongs to a joint venture company that is 80 per cent Hot Chili and 20 per cent Compañía Minera del Pacífico, known as CMP (resource and reserve statement, lodged 29 September 2026).
- La Verde. Copper and gold. A discovery 30 kilometres south of the planned Costa Fuego processing plant, where Hot Chili has completed its second drilling program (ASX announcement, 17 November 2026). La Verde sits within the Domeyko project. Hot Chili is earning 100 per cent of part of that ground through purchase option agreements, and payments under them are still to be made (tenement schedule in the quarterly report, lodged 30 October 2026).
- Huasco Water. A company with a granted maritime concession to draw seawater, owned 80 per cent by Hot Chili and 20 per cent by CMP. Costa Fuego is expected to be its customer (ASX announcements, 27 and 31 March 2025).
OR Royalties Inc. has paid Hot Chili US$30 million in total for a net smelter return royalty, a share of the revenue a mine receives for its metal. The second US$15 million, announced on 7 July 2026, added La Verde to it (ASX announcement, 7 July 2026, and quarterly report, lodged 30 October 2026).
The Costa Fuego Mineral Resource and Ore Reserve
Costa Fuego has an Indicated Mineral Resource of 798 million tonnes at 0.37 per cent copper and 0.10 grams of gold per tonne. That contains 2.91 million tonnes of copper and 2.64 million ounces of gold. A further 203 million tonnes at 0.25 per cent copper is Inferred. The estimate is dated 26 February 2024 and covers the whole project, including CMP's share of Productora (resource and reserve statement, lodged 29 September 2026).
The resource counts rock above a cut-off, the lowest grade included. Hot Chili set it at 0.20 per cent copper equivalent for rock that could be mined from an open pit, which is dug from the surface, and 0.27 per cent for underground rock. Copper equivalent converts the gold, silver and molybdenum into copper using assumed prices and recoveries. The resource used a copper price of US$3.00 a pound (resource and reserve statement, lodged 29 September 2026).
The Ore Reserve, all in Probable, the lower of the two reserve categories, is 502 million tonnes at 0.37 per cent copper and 0.10 grams of gold per tonne, containing 1.86 million tonnes of copper and 1.58 million ounces of gold. It was reported on 27 March 2025 at a copper price of US$4.30 a pound. The resource figures include the reserve (resource and reserve statement, lodged 29 September 2026).
The Costa Fuego Pre-Feasibility Study
Hot Chili published a Pre-Feasibility Study for Costa Fuego on 27 March 2025. That is the second of three study levels. The company gives its accuracy as plus or minus 25 per cent.
The study plans open pits at four deposits and an underground mine at Cortadera, feeding processing plants at Productora over 20 years. Planned production averages 95,000 tonnes of copper and 48,000 ounces of gold a year for the first 14 years, and 74,000 tonnes of copper a year across the 20. The plant is assumed to recover 86 per cent of the copper and 54 per cent of the gold from sulphide ore (ASX announcement, 27 March 2025). Recovery is the share of the metal that ends up in the product sold.
Start-up capital is put at US$1.27 billion. The capital table is headed as including a 20 per cent contingency, an allowance for costs running over, and its contingency line for the start-up stage is US$84 million. A further US$1.35 billion of expansion capital comes later, mostly for the underground mine (ASX announcement, 27 March 2025). Capital for water supply and port infrastructure was separated out, which the study calls decoupled. Seawater supply to Costa Fuego is costed in the Huasco Water study at US$151 million of start-up capital (ASX announcement, 31 March 2025).
The study estimates a life-of-mine all-in sustaining cost of US$1.85 a pound of copper after credits for the other metals, using a copper price of US$4.30 a pound. That measure covers producing each pound and keeping the mine running, and leaves out the cost of building it (ASX announcement, 27 March 2025).
The study announcement says no part of the production target rests on Inferred resources. The September 2026 quarterly report puts the plan at more than 99 per cent Indicated and less than 1 per cent Inferred. It says there is a low level of geological confidence associated with Inferred Mineral Resources. It says there is no certainty that further exploration work will result in Indicated Mineral Resources or that the production target itself will be realised. It says the plan does not depend on the Inferred resources.
On funding, the company says it believes it has a reasonable basis to expect it will be able to fund development of Costa Fuego. It cautions that funding in the order of US$1.27 billion will be required and that there is no certainty it will be able to raise that amount when needed. It also says the study is not a basis for a final investment decision, with no certainty its results will be realised (quarterly report, lodged 30 October 2026).
Hot Chili is revising the study to bring in La Verde and to test a large open pit at Cortadera in place of the underground mine. The company was preparing two environmental impact assessments, one for Huasco Water and one for Costa Fuego, and was targeting the June 2027 quarter to lodge both. It is also seeking one or more partners to help fund the projects (quarterly report, lodged 30 October 2026).
La Verde drilling
Results lodged on 17 November 2026 covered 13 holes. The longest was 638 metres at 0.32 per cent copper and 0.10 grams of gold per tonne from surface, which the company states as 0.41 per cent copper equivalent. Others included 150 metres at 0.48 per cent copper equivalent and 28 metres at 0.22 per cent. Three holes had no significant intersection. Intervals are reported above a nominal 0.20 per cent copper cut-off, can include lower-grade stretches, and are lengths measured down the hole. The announcement says the relationship to true width is still being assessed. The copper equivalent borrows recoveries from Cortadera.
La Verde has no Mineral Resource yet. Assays from 21 holes were pending, and the company plans a first estimate once they are in (ASX announcement, 17 November 2026).
Hot Chili cash and funding
Hot Chili raised A$40 million before costs in a share placement in February 2026 (annual report, lodged 29 September 2026) and received A$20.4 million, after costs, from OR Royalties in the September 2026 quarter. It reported cash of A$29.3 million at 30 September 2026, which is item 4.6 of its Appendix 5B. Item 5.5 of the same form shows A$24.9 million. The form divides the item 4.6 figure by the quarter's outgoings of A$12.7 million and gives 2.29 quarters of funding. The company says it expects that rate of spending to fall after the La Verde drilling program (quarterly report and Appendix 5B, lodged 30 October 2026).
At 30 June 2026 the notes to the accounts listed option payment commitments of A$25.4 million, of which A$4.8 million fell within a year. They also recorded A$31.9 million of Chilean VAT refunds that would have to be repaid if export targets are not met by set dates. The note gave 31 December 2026 as the date for A$12.3 million of that, tied to Cortadera, and said a new extension would be required (annual report, notes 17 and 18, lodged 29 September 2026).
Every Samso piece on Hot Chili
Six published pieces as at 17 November 2026, grouped by Samso product. Newest first in each group. Dates are Perth dates.
Samso Insights
- 22 Jan 2020, Copper Porphyry Districts - Chile & Associates (has a section on Hot Chili)
Coffee with Samso
- 16 Dec 2020, The Rubber Stamping of the New Copper Giant - Hot Chili Limited (ASX: HCH)
- 16 Oct 2020, The Arrival of a Tier 1 Copper-Gold Project in Chile - Hot Chili Limited (ASX: HCH)
- 5 Jun 2020, Tier-1 Copper-Gold Porphyry Deposits (episode 40)
- 6 Mar 2020, A Giant Copper - Gold Porphyry Story, Chile (episode 32, the first interview)
Rooster Talk
Videos on YouTube
- 16 Dec 2020, The Rubber Stamping of the New Copper Giant - Hot Chili Limited (ASX: HCH)
- 16 Oct 2020, The Arrival of a Tier 1 Copper-Gold Project in Chile - Hot Chili Limited (ASX: HCH)
- 5 Aug 2020, Unveiling the Giant Copper Deposit - Hot Chili Limited (ASX: HCH)
- 5 Jun 2020, Tier-1 Copper-Gold Porphyry Deposits
- 6 Mar 2020, A Giant Copper - Gold Porphyry Story, Chile
Questions people ask about Hot Chili (ASX HCH)
What does Hot Chili do? It is developing the Costa Fuego Copper-Gold Project on the coastal range of Chile and has drilled the La Verde discovery nearby. It has no mine in production.
What is the Hot Chili share price? The ASX website shows the HCH share price. This page has no live price.
What is the latest announcement from Hot Chili? As at 17 November 2026 the most recent announcement was lodged that day and reported drilling results from La Verde.
Does Hot Chili have a Mineral Resource? Yes. Costa Fuego has an Indicated Mineral Resource of 798 million tonnes at 0.37 per cent copper, and a Probable Ore Reserve of 502 million tonnes.
Is Hot Chili worth looking at? This page gives no buy, sell or hold call, price target or valuation. Costa Fuego has an Ore Reserve and a Pre-Feasibility Study. The company says there is no certainty it will be able to raise the funding of about US$1.27 billion when needed. It was targeting the June 2027 quarter to lodge its environmental assessments. La Verde results of 17 November 2026 ran from 638 metres at 0.32 per cent copper down the hole to three holes with no significant intersection. La Verde has no Mineral Resource yet. Cash is set out under Hot Chili cash and funding above. Samso had published no research workup on Hot Chili at 17 November 2026.
Disclosure
In the Coffee with Samso post of 16 October 2020, Noel Ong wrote that he was a shareholder of Hot Chili at that time. Samso holds no shares in Hot Chili at 17 November 2026.
This page is general information only.
Depth over hype.
Samso company research pages are independent research commentary for general information only. Nothing on this page is financial product advice, and it does not take into account any reader's objectives, financial situation or needs. Figures are drawn from public sources believed reliable at the stated dates but are not guaranteed, and market-sensitive numbers change daily. Samso or associated parties may hold positions in, or have commercial arrangements with, companies mentioned. Seek professional advice before making investment decisions. © Samso 2026, samso.com.au
Page last reviewed 17 November 2026.