
INDEPENDENT RESEARCH MEDIA HOUSE FOR THE ASX. DEPTH OVER HYPE.
Australian Rare Earths (ASX AR3), Research and Coverage
Australian Rare Earths Limited (ASX: AR3) is an Adelaide-based mineral explorer and developer. Its main project is the Koppamurra Rare Earths Project, about 30 kilometres south-east of Naracoorte in South Australia, with ground that runs into western Victoria. The rare earths at Koppamurra sit in shallow clay. The company published a pre-feasibility study and a first Ore Reserve for Koppamurra on 25 June 2026, and is running Koppamurra ore through a pilot plant at the Australian Nuclear Science and Technology Organisation (ANSTO) in Sydney. Its second project is Overland in South Australia, where it has explored for uranium and drilled a niobium and rare earths target in September 2026. Assays from that drilling were pending at 12 November 2026. The company has no production and has not yet funded a mine at Koppamurra.
ASX code: AR3. Full legal name: Australian Rare Earths Limited. Managing Director and CEO: Travis Beinke. The other directors are Angus Barker, the non-executive chairman, and Pauline Carr, a non-executive director (annual report, lodged 24 September 2026). Australian Rare Earths held A$4.81 million in cash at 30 September 2026 and had no loan facilities (quarterly report and Appendix 5B, lodged 30 October 2026).
Australian Rare Earths projects
Australian Rare Earths has two main projects, both in South Australia. Koppamurra has a study and an Ore Reserve. Overland is at the exploration stage.
A Mineral Resource is a company's estimate of the material in the ground that has reasonable prospects of eventual economic extraction. It is stated as tonnes and grade and is reported under the JORC Code, the Australasian code for reporting mineral resources. The code has three confidence categories. Measured is the highest. Indicated means the drill holes are close enough together to give reasonable confidence in the tonnes and the grade. Inferred is the lowest, where the drill holes are further apart. An Ore Reserve is the part of the Measured and Indicated resource that a study has shown can be mined at a profit. A reserve is either Proved or Probable, and Probable is the lower of the two.
Rare earth grades are quoted as total rare earth oxides, shortened to TREO. That is the combined weight of the oxides of all the rare earth elements in the rock. At Koppamurra the unit is parts per million, so 751 parts per million is 751 grams of rare earth oxides in each tonne.
- Koppamurra Rare Earths Project, about 30 kilometres south-east of Naracoorte in South Australia, with licences extending into western Victoria. Rare earths held in shallow clay. Australian Rare Earths owns 100 per cent. The Mineral Resource is 243 million tonnes at 751 parts per million TREO. Of that, 0.9 million tonnes is Measured, 113 million tonnes is Indicated and 130 million tonnes is Inferred. A cut-off is the lowest grade counted in the estimate. Here it is 325 parts per million, measured with cerium oxide left out of the TREO. The Ore Reserve is 26 million tonnes at 920 parts per million TREO, all of it Probable, as at 25 June 2026.
- Overland Project, South Australia, about 8,000 square kilometres. Uranium, niobium and rare earths. Exploration stage, with no Mineral Resource. The company is still exploring there and drilled a niobium and rare earths target in September 2026. The quarterly report of 30 October 2026 calls Overland 100 per cent owned. The annual report of 24 September 2026 shows about 1,000 square kilometres of it as a farm-in for the uranium rights.
The Koppamurra resource and reserve figures are from the company's announcement of 25 June 2026. The resource figure includes the reserve. The company says the magnet rare earths, which are neodymium, praseodymium, dysprosium and terbium, make up 25 per cent of the TREO in the resource (Pre-Feasibility Study, 25 June 2026).
Koppamurra Rare Earths Project, the study and the pilot plant
Australian Rare Earths published a Pre-Feasibility Study for Koppamurra on 25 June 2026. A pre-feasibility study is the second of the three study levels a mining project goes through, and it is less detailed than a definitive feasibility study. It is a step toward a decision to build, and the study says more work, including a definitive feasibility study, is needed before a final decision (Pre-Feasibility Study, 25 June 2026).
The study sets out a shallow open pit mine feeding 3 million tonnes of ore a year to a heap leach for 12 years. In a heap leach the ore is stacked on a lined pad and a weak acid solution is run through it to dissolve the rare earths. The product is a mixed rare earth oxide. The study plans to sell it to customers with separation plants, which split it into the individual rare earths. The study gives average output of 1,860 tonnes of TREO a year.
Capital cost before production is put at A$178 million, including a contingency of A$35 million, an allowance for costs running over. The study rates its estimates at pre-feasibility level (Class 4), with a target accuracy range of plus or minus 30 per cent. Its all-in sustaining cost is US$38.32 for each kilogram of TREO, an industry measure of what it costs to produce each kilogram and keep a mine running. The study's base case assumes a basket price of US$139 for each kilogram of TREO. That is built from the average of long-term forecasts by Adamas Intelligence and Argus Media. It says the two forecasts differ materially in places. It assumes the buyer pays 75 per cent of the price (Pre-Feasibility Study, 25 June 2026).
About 71 per cent of the study's production target rests on the Ore Reserve, the company says. The other 29 per cent rests on Inferred resource, which cannot be counted in a reserve. The study cautions that Inferred resources carry a low level of geological confidence, and that there is no certainty the production target will be met.
The study assumes 68 per cent of the rare earths are recovered into the final product. The company bases that on laboratory and column leach tests, including eleven column tests in 2024 and 2025 at ANSTO, the Australian Nuclear Science and Technology Organisation. The study says uncertainty remains about how the result scales up.
Australian Rare Earths is now testing that recovery at pilot scale. A pilot plant is a small working version of the process that runs continuously on tonnes of ore. The plant at ANSTO in Sydney is treating about 30 tonnes of Koppamurra ore in four cycles. The first cycle, about 8 tonnes, was complete by 10 September 2026. The company said it ran at target leaching recovery rates. It has not yet published a recovery percentage from the pilot plant (announcements of 11 August, 10 September and 30 October 2026). Leaching is expected to finish by December 2026 (quarterly report, lodged 30 October 2026).
The pilot plant has produced a mixed rare earth hydroxide, the intermediate product that is refined into the mixed rare earth oxide (quarterly report, lodged 30 October 2026). The company has a non-binding memorandum of understanding with Neo Performance Materials for half of the first-stage output (annual report, lodged 24 September 2026).
Koppamurra approvals and funding
Australian Rare Earths has not yet lodged its Mining Lease Application for Koppamurra. The quarterly report of 30 October 2026 targeted the end of 2026. On 12 November 2026 the chairman said it had not yet been lodged and was on track to be lodged in the near term. The study targets first production by 2029.
The mine area is farming and forestry land. The study lists land access and compensation agreements with landholders among its risks (Pre-Feasibility Study, 25 June 2026). A native title claim over the South Australian licences is registered and has not been determined (Ore Reserve announcement, 25 June 2026).
The company has received A$4.85 million of a A$5 million Australian Government grant (ASX announcement, 28 August 2026). It received a research and development tax refund of A$1,019,814 after the quarter ended (ASX announcement, 8 October 2026). The quarterly cash flow report, the Appendix 5B lodged 30 October 2026, shows cash at 30 September to cover 2.4 quarters at that quarter's rate of spending. That is before the refund.
The auditor drew attention in the annual report to a material uncertainty about the company's ability to continue as a going concern, and did not modify its opinion. The directors consider the going concern basis appropriate and list a share issue, a farm-out or an asset sale among their options (annual report, Note 1, lodged 24 September 2026).
Australian Rare Earths had no binding commitment for the A$178 million at 30 June 2026 (annual report, lodged 24 September 2026). The company says it has started talks with financiers, partners and buyers and has a reasonable basis to expect funding. It also says there is no certainty it will secure it (Pre-Feasibility Study, 25 June 2026).
Overland Project, the niobium and rare earths drilling
Australian Rare Earths drilled Overland for uranium in April and May 2026. The 22-hole program returned uranium above background levels and no significant uranium intersections (quarterly report, lodged 30 October 2026). One hole, OV167, returned niobium and rare earths.
OV167 returned 19 metres at 0.61 per cent TREO from 86 metres to the end of the hole at 105 metres (ASX announcement, 8 July 2026). The top 7 metres also carried 0.27 per cent niobium pentoxide, the oxide form in which niobium is reported. These are downhole lengths in a vertical hole. The company says there is no certainty they represent true widths.
The company interprets the rock as carbonatite, a rare igneous rock that hosts some of the world's niobium and rare earth deposits. It cautions that the result is from a single drill hole. It says it is also considering other geological models and that more laboratory work is needed to confirm the interpretation (quarterly report, lodged 30 October 2026).
The company began a follow-up aircore program on 1 September 2026. Hole OV176, about 5 kilometres south of OV167, passed through about 130 metres of rock logged as carbonatite and ended in it at 201 metres (ASX announcement, 15 September 2026). That is a visual identification of rock type over a downhole length, and it carries no grade. Laboratory assays were pending at 12 November 2026.
Every Samso piece on Australian Rare Earths
Newest first. Two published pieces as at 17 November 2026. Dates are in Perth time.
Samso Research
- 9 Sep 2026, Australian Rare Earths Limited (ASX: AR3) (Samso Research workup)
Samso News
- 25 Sep 2026, Australian Rare Earths (ASX: AR3) - Reading the Chart Against the Announcements (Samso Chart Read)
The Samso Research workup was published on 9 September 2026 and uses cash at 30 June 2026.
Questions people ask about Australian Rare Earths (ASX AR3)
What does Australian Rare Earths do? It explores for and plans to mine rare earths. Its main project is Koppamurra in South Australia, which has a pre-feasibility study and an Ore Reserve. It also explores for uranium, niobium and rare earths at Overland.
What is the Australian Rare Earths (AR3) share price? The ASX website shows the AR3 share price. This page lists Samso's coverage and has no live price.
What is the latest announcement from Australian Rare Earths? As at 17 November 2026 the most recent operating report was the September quarter report, lodged on 30 October. The annual general meeting was held on 12 November 2026 and all resolutions were carried.
Does Australian Rare Earths have a Mineral Resource? Yes, at Koppamurra. It is 243 million tonnes at 751 parts per million TREO, and 26 million tonnes of it at 920 parts per million is a Probable Ore Reserve (ASX announcement, 25 June 2026). Overland has no Mineral Resource.
Is Australian Rare Earths worth looking at? This page gives no buy, sell or hold call, price target or valuation. Koppamurra has a Pre-Feasibility Study and a Probable Ore Reserve. The A$178 million to build it had no binding funding commitment at 30 June 2026, and the Mining Lease Application had not been lodged at 12 November 2026. A pilot plant is treating Koppamurra ore at ANSTO. Assays from the Overland drilling were pending at 12 November 2026. The Samso Research workup goes through the company in detail as at 9 September 2026.
Disclosure
The Samso Chart Read of 25 September 2026 states that the Samso Research workup on Australian Rare Earths was not commissioned by the company, and that AR3 is not a Samso client. The same post carries Samso's standard statement that Samso or associated parties may hold positions in, or have commercial arrangements with, companies mentioned.
This page is general information only.
Depth over hype.
Samso company research pages are independent research commentary for general information only. Nothing on this page is financial product advice, and it does not take into account any reader's objectives, financial situation or needs. Figures are drawn from public sources believed reliable at the stated dates but are not guaranteed, and market-sensitive numbers change daily. Samso or associated parties may hold positions in, or have commercial arrangements with, companies mentioned. Seek professional advice before making investment decisions. © Samso 2026, samso.com.au
Page last reviewed 17 November 2026.